Loading...
HomeMy WebLinkAboutContract 29001 AMENDMENT NO. —1 STATE OF TEXAS 6 CITY SECRETARY CONTRACT NO. (No M&C Needed) COUNTY OF TARRANT 8 WHEREAS, the City of Fort Worth (City) and LOPEZGARCIA Group, (Engineer) made and entered into City Secretary Contract No. 29094, (the Contract) which was authorized by the City Council by M&C C-19257 on the 24th day of September, 2002; and WHEREAS, the Contract involves engineering services for the following project: Water and Sanitary Sewer Replacement Contract 2002; STM-K WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1 . Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated August 5th, 2003 a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $7,728 . 00 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $103, 211.00 . ................ 3 . All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. r' EXECUTED on this the 4)—\� A day of 2003, in Fort Worth, Tarrant County, Texas. ATTEST: Contract Authorization G 7 4oria Pe&rson�-)City Secretary APPROVED: APPROVED: A. Douglas Rademaker, P.E. (�arcA'Ott , Director, Department of Assistant City Manager Engineering LOPEZGARCIA Group ENGINF R By: dr Name: Wendy Lopez, P.E. LOPEZGARCIA Group 6850 Manhattan Blvd. , Ste 300 Fort Worth, TX 76120 APPROVED AS TO FORM AND LEGALITY: Gary Steinberger Assistant City Attorney ENG1.FRM(NO M&C) 71 7' -2- P E-1 Z G R CIP l A 0 U August 5, 2003 Mr. Rakesh Chaubey, P.E. Project Manager City of Fort Worth Department of Engineering 900 Monroe Street Suite 201 Fort Worth, Texas 76102 RE: Request for Amendment No. I Water Replacement Contract 2002, STM-K LGGroup Project No. 202050.00 Dear Mr. Chaubey: This letter is in response to your request for additional engineering design services and Storm Water Pollution Prevention Plan (SWPPP) and Report. A detailed breakdown and summary of estimated fees are attached. A description of the additional work is as follows: After the final plans were submitted to the City, the City Water Department has decided to add waterlines at several intersections and change sizes of waterlines. Also a sanitary sewer line L- 272 is added to the project. Therefore, revision of the final set of plan and profile sheets is required. To meet the requirements of the Environmental Protection Agency (EPA) and the Texas Commission on Environmental Quality (TCEQ), the City has adopted a policy of adding SWPPP plans and report. The additional plans and SWPPP report will be incorporated into the 100% plan submittal and will also include the revised plan and profile sheets. Our engineering fee estimate for this work includes the following: • Revision of plan and profile sheets for the entire set of plans. Preparation of SWPPP plans and report. • Addition of sanitary sewer line L-272 to the project. L 0 P E Z L G R 0 0 F E z G 11"", C 1 0 LJ Mr. Rakesh Chaubey, P.E. City of Fort Worth August 5, 2003 Page Two The additional efforts are considered outside our original scope of work, and we therefore request a contract amendment to increase the lump sum fee amount by $7,728.00. (See attached LOPEZGARCIA GROUP fee estimate). Original, Lump Sum Amount: $95,483.00 Amendment No.] : $7,728.00— Requested herein Total Revised Amount: $103,211.00 If you have any questions or need additional information concerning this request, please feel free to call me or Tony Islam at (817) 446-1800. Sincerely LOPEZGARCIA GROUP Richard W. Albin, P.E., R.P.L.S. Fort Worth Municipal Division Manager RWA:ti Enclosure P:\FW\202050.00\DOCS\Amei)dment\Aniendiiiend No. I (8-i-03),doc RE: Detailed Breakdown of Additional Work for Amendment No. I Water Replacement Contract 2002, STM-K LGGroup Project No. 202050.00 The breakdown of the additional work includes the following: Addition of 105 linear feet of 12-inch waterline at the intersection of S. Main Street and Magnolia Avenue. Addition of 50 linear feet of 12-inch waterline at the intersection of S. Main Street and Dashwood Street. Relocation and pipe size changes of 75 linear feet of pipe from 8-inch to 12-inch waterline at the intersection of S. Main Street and Terrell Avenue, • Relocation of 156 linear feet of 8-inch waterline at the intersection of S. Main Street and W. Pennsylvania Avenue. Addition of 45 linear feet of 8-Inch waterline at the intersection of S. Main Street and Annie Street. • Addition of 50 linear feet of 8-inch waterline at the intersection of S. Main Street and E. Peter Smith Street. • Addition of 45 linear feet of 8-inch waterline at the intersection of S. Main Street and E. Broadway Street. • Revision of plan and profile of the proposed 12-inch waterline along S. Main Street at all intersections where addition and relocation of pipes were proposed. • Preparation of SWPPP plans and report. P:\FW\202050,00\DOC S\A mend men t\Amen d men d No. I (7-30-03).doc FORT WORTH .......... MEM DUM TO: A. Douglas Rademaker, Director, DOE,- and Marc Ott, Assistant City Manager FROM: Rakesh Chaubey, DOE DATE: August 8th 2003 RE: DESIGN FEE AMENDMENT NO. 1 TO WATER AND SANITARY SEWER 0001 A4"%CRfiCK1-r f%f-%K1-rt3Af%*1r olonno) 01rRX Ldr N%L-1 I I I%r%%.# I Irvvlr-; %I I owl r DOE 3757 WATER PROJECT NO. PW53-060530176540 SEWER PROJECT NO. PS58-070580175880 The proposed amendment will allow Wendy Lopez and Associates, Inc. dba. LOPEZGARCIA GROUP,to provide additional design and survey services to the project as requested by the City. This amendment covers the cost of engineering work that is necessary for the following reasons: v Preparation of Sto.rmwater Pollution Prevention Plan (SWPPP), as now required by the Texas Dept. of Environmental Quality v Inclusion of extra work required as requested by the Water Dept LOPEZGARCIA GROUP has submitted a fee in the amount of$7,171.50 for the additional work as described above, thereby increasing the contract fee from $95,483.00 to $103,211.00. 1 believe this fee is fair and reasonable for the additional work to be done. It is recommended that the request be approved. No previous amendments have been processed to this contract. Please authorize additional fee by your signatures on the attached contract amendment forms. Rakesh Chaubey Attachment Cc: Berdena Hamilton, Water Department Dan Pepon, Water Department. ENGINEERING DEPARTMENT THE CITY OF FORT WORTH * 1000 THROCKMORTON STREET * FORT WORTH, TEXAS 76102-6311 (817) 871-7941 * FAX (817) 871-7854