HomeMy WebLinkAboutContract 29401AMENDMENT NO. 3
STATE OF TEXAS 3 CITY SECRETARY CONTRACT0(
(No M&C Needed)
COUNTY OF TARRANT 3
WHEREAS, the City of Fort Worth (City) and Kimley-Horn and
Associates, Inc. Consulting Engineers, Inc. (the "Engineer") made and
entered into City Secretary Contract No. 26995 (the Contract) which was
authorized by the City Council by M&C C-18677 on the 24 day of July,
2001; and
WHEREAS, the Contract involves engineering services for the
following project:
Water Pressure Analysis and Design of water line for four Localized
Areas.
WHEREAS, it has become necessary to execute Amendment No.3 to said
Contract to include an increased scope of work and revised maximum fee;
"Redesign of water line in Baird Drive and Park West Apartment Access
Drive as requested by Water Department.
NOW THEREFORE, City and Engineer, acting herein by and through their
duly authorized representatives, enter into the following agreement which
amends the Contract:
1.
Article I of the Contract is amended to include the additional
engineering services specified in a proposal letter dated December 01,
2003, a copy of which is attached hereto and incorporated herein. The
cost to City for the additional services to be performed by Engineer
total $4,600.00
go
Article II
of the Contract
is amended to provide
for an increase in
the maximum fee
to be paid
to Engineer for all
work and services
performed under
the Contract, as
amended, so that the
total fee paid by
the City for
all work and
services shall not exce.
. .. . ..... . . . ........ . ttTe ............................
$199,600.00
r.,z
0
All other provisions of the Contract which are not expressly amended
herein shall remain in full force and effect.
EXECUTED on this the mmday of w.C,1
2003, in Fort Worth, Tarrant County, Texas.
APPROVAL RECOMMENDED:
A. Douglas Rademaker, P.E.
Director, Department of
Engineering
Kimley-Horn and Associates, Inc.
ENGINEER
By:
APP E
Marc Ott
Assistant City Manager
ATTEST:
Gloria Pearson, City Secretary
Name: Glenn A. Gary, P.E. Vice President
801 Cherry Street, Unit 11, Suite 1100
Fort Worth, Tx. 76102
Gary Steinberger
Assistant City Attorney
2
'i
Contract
Contract AuthorizatiOn
Date
IM FpF Kimley-Horn
and Associates, Inc.
December 1, 2003
Mr. Fred Ehia, P.E.
Project Manager
City of Fort Worth Engineering Department
1000 Throcicmorton Street
Fort Worth, TX 76102
Re: Fort Worth — Pressure Analysis & Design — Camelot Water Line
Additional Services — Revisions of the Construction Documents
Contract Amendment No
KHA No. 061018016
Dear Fred:
The City of Fort Worth has requested that Kimley-Horn revise the construction
documents for Baird Drive and the access drive for the Park West Apartment
complex. The following is a description of the scope for the revisions of the
contract documents:
Baird Drive
The ENGINEER will revise the plan and profile sheets for Baird Drive
(Sheets 9 and 10 of the plan set) to move the proposed water line out from
the center of the street. The City suggested that the water line be moved two
feet to the west. This will place the water line within ten feet of the existing
sanitary sewer. We recommend that the water line be place two feet to the
east. The ENGINEER will revise the quantities associated with the
relocation of the water line and the pavement repair for the removal of the
concrete panels along only one side of the street. The existing curb will not
be replaced for this construction.
Park West Apartment Access Drive
The ENGINEER will revise the quantities of the pavement repair for the
removal of the concrete and brick pavers for the trench width only.
Meeting with City Staff and Contract
The ENGINEER has attended a meeting with the City and Contractor on
November 25, 2003. The ENGINEER will attend two (2) additional
meetings (three total for this amendment) associated with the approval of the
revised plans by City Staff and coordination with the Contractor to review
N
TEL 817 335 6511
MET 817 654 4266
FAX 817 335 5070
9
Suite 1100
801 Cherry S[reel, Unit 11
Fort Worth, Texas
76102-6803
Kimley-Horn
_ and Associates, Inc. Mr.Fred Shia,December I,2003,Page 3
We appreciate the opportunity to be of continued service to the City. Please
contact us if we need to provide any further information.
Very truly yours,
KIMLEY-HORN AND ASSOCIATES, fNC.
Glenn A. Gary, P.E.
Vice President
GAG/CTD
Copy to: Mr. Dao Kim,P.E., Fort Worth Water Department
P:\061018.016\Ppp\Add ii ional A mdi3.doc
Agreed to this day of , 2003.
CITY OF FORT WORTH, TEXAS
By:
(Print or Type Name)
Title: