HomeMy WebLinkAboutContract 45857t OfECMAIA,
C WTRACT
Developer mid Project Tnfnrmntinn rover Sheet:
Developer Company Name: Dry Creek Apartments II, Ltd.
Address, State, Zip Code: 613 NW Loop 410, Suite 510
Phone, E-Mail: (972) 668-4800, mfootlik@att.net
Authorized Signatory/Title: Sean O'Connor, Member
Project Name and Brief Description: 16" W.L. Relocation for Dry Creek Apartments
Project Location: Raceway Drive & Old Elizabethtown Road
Plat Case No.: N/A Plat Name: N/A
Council District: 0 City Project No: 02331
CFA: 2014-0 3 0 DOE: 7277
To be complete by staff
Received by: (
Combined CFA Agreement — Revised January 2014
Date: �I
58sq
CiPFICBAL RECORU
CITY SECRETARY
FE WORM; TX
RECNVED AUG 1 9 2O1
COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.
WHEREAS, the undersigned Developer ("Developer") desires to make certain
specific improvements as described below and on the exhibits attached hereto
("Improvements") related to a project generally described as Dry Creek Apartments
("Project")within the City of Fort Worth, Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the
Improvements or Project; and
WHEREAS, any future City participation in this CFA is subject to the availability
of City funds and approval by the Fort Worth City Council and shall be memorialized as an
amendment to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community
Facilities Agreement ("CFA" or"Agreement") in connection with the Improvements and the
Proj ect.
NOW, THEREFORE,For and in consideration of the covenants and
conditions contained herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March
2001, approved by the City Council of the City of Fort Worth, as amended, is
hereby incorporated into this Agreement as if copied herein verbatim.
Developer agrees to comply with all provisions of said Policy in the
performance of its duties and obligations hereunder and to cause all
contractors hired by Developer to comply with the Policy in connection with
the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6,
Section II, of the Policy and recognizes that there shall be no reduction in the
collateral until the Project has been completed and the City has officially
accepted the Improvements. Developer acknowledges that the said
acceptance process requires the Developer's contractor(s) to submit an
2
affidavit of bills paid signed by its contractor and consent of surety signed
by its surety to ensure the contractor has paid any sub-contractors and
suppliers in full. Additionally, the contractor must also provide in writing
that the contractor has been paid in full by Developer for all the services
provided under their contract.
C. Developer agrees to cause the construction of the Improvements contemplated
by this Agreement and that said construction shall be completed in a good and
workmanlike manner and in accordance with all City standards and the City-
approved construction plans, specifications and cost estimates provided for the
Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof: Water (A)_2L,
Sewer (A-1) , Paving (B) Storm Drain (B-1) Street Lights &
Signs (C)_.
E. The Developer shall award all contracts for the construction of the
Improvements in accordance with Section II, paragraph 7 of the Policy and the
contracts shall be administered in conformance with paragraph 8, Section II, of
the Policy.
F. For all Improvements included in this Agreement for which the Developer
awards construction contract(s),Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed,
said contractor to meet City's requirements for being prequalified, insured,
licensed and bonded to do work in public streets and/or to perform
water/waste water construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance
bond in the names of the City and the Developer for one hundred percent
(100%) of the contract price of the Improvements, and a maintenance bond
in the name of the City for one hundred percent(100%) of the contract price
of the Improvements valid for a period of two (2) years from the date of
final acceptance insuring the maintenance and repair of the constructed
infrastructure during the term of the maintenance bond. All bonds to be
furnished before work is commenced and to meet the requirements of
Combined CFA Agreement—Revised January 2014
Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer-awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required by
said documents and same will be evidenced on the Certificate of Insurance
(ACORD or other state-approved form) supplied by the contractor's
insurance provider and bound in the construction contract book.
iv. To require its contractor to give at least 48 hours' advance notice of intent
to commence construction to the City's Construction Services Division so
that City inspection personnel will be available; to require the contractor to
allow the construction to be subject to inspection at any and all times by
City inspection forces, to not install or relocate any sanitary sewer, storm
drain, or water pipe unless a responsible City inspector is present and gives
his consent to proceed, and to make such laboratory tests of materials being
used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City in order to schedule a Pre-Construction Meeting. The
submittal should occur no less than 10 working days prior to the desired
date of the meeting. No construction will commence without a City-issued
Notice to Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and
service lines have been completed to the satisfaction of the Water
Department.
G. Developer shall provide, at its expense, all engineering drawings and
documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to
serve the development or to construct the Improvements contemplated herein.
I. City shall not be responsible for any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the
4
community facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the
City harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement.
L. The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to any
property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed by said
Developer, his contractors, subcontractors, officers, agents or employees,
or in consequence of any failure to properly safeguard the work, or on
account of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub-contractors, officers, agents or
employees, whether or not such injuries, death or damages are caused, in
whole or in part, by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees.
M. Developer will further require its contractors to indemnify, defend and
hold harmless the City, its officers, agents and employees from and against
any and all claims, suits or causes of action of any nature whatsoever,
whether real or asserted, brought for or on account of any injuries or
damages to persons or property, including death, resulting from, or in any
way connected with, the construction of the infrastructure contemplated
herein, whether or not such injuries, death or damages are caused, in
whole or in part, by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees Further, Developer will require its
contractors to indemnify, and hold harmless the City for any losses,
Combined CFA Agreement—Revised January 2014
damages, costs or expenses suffered by the City or caused as a result of said
contractor's failure to complete the work and construct the improvements
in a good and workmanlike manner, free from defects, in conformance with
the Policy, and in accordance with all plans and specifications.
N. Upon completion of all work associated with the construction of the
Improvements, Developer will assign to the City a non-exclusive right to
enforce the contracts entered into by the Developer with its contractor along
with an assignment of all warranties given by the contractor, whether express or
implied. Further, Developer agrees that all contracts with any contractor shall
include provisions granting to the City the right to enforce such contracts as an
express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the developer's share of the total construction cost as stated in
the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years,
provided, however, if construction of the Improvements has started within
the two year period, the developer may request that the CFA be extended
for one additional year.
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee, its
6
agreement with its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements
if at the end of two (2) years from the date of this Agreement (and any
extension period)the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the
completion of the construction of the Improvements or to cause the payment
of costs for construction of same before the expiration of two (2) years if
the Developer breaches this Agreement, becomes insolvent or fails to pay
costs of construction and the financial guarantee is not a Completion
Agreement. If the financial guarantee is a Completion Agreement and the
Developer's contractors and/or suppliers are not paid for the costs of
supplies and/or construction, the contractors and/or suppliers may put a lien
upon the property which is the subject of the Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLAND
Combined CFA Agreement—Revised January 2014
Cost Summary Sheet
Project Name: Dry Creek Apartments
CFA No.: 2014-030 DOE No.: 7277
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any
additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 72,349.75
2.Sewer Construction
Water and Sewer Construction Total $ 72,349.75
B. TPW Construction
1.Street
2.Storm Drain $ -
3.Street Lights Installed by Developer $
TPW Construction Cost Total $ -
Total Construction Cost(excluding the fees): $ 72,349.75
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 1,447.00
D. Water/Sewer Material Testing Fee(2%) $ 1,447.00
Sub-Total for Water Construction Fees $ 2,893.99
E. TPW Inspection Fee(4%) $ -
F. TPW Material Testing(2%) $ -
G. Street Light Inspsection Cost $ -
H. Street Signs Installation Cost $ -
Sub-Total for TPW Construction Fees $ -
Total Construction Fees: $ 2,893.99
Choice
Financial Guarantee Options,choose one Amount (ck one)
Bond=100% $ 72,349.75
Completion Agreement=100%/Holds Plat $ 72,349.75
Cash Escrow Water/Sanitary Sewer=125% $ 90,437.19 X
Cash Escrow Paving/Storm Drain=125% $ -
Letter of Credit=125%w/2 r expiration period $ 90,437.19
8
IN TESTIMONY VVHEREOF, the City of Fort Worth has caused this instrument to be executed
:�.. quadruplicate -1�aa 4.. :a.. •a..t a_ •�.t behalf itsAssistant I •:i_ h Manager,
attested
by •L ��._
111 quads uplica a in as name and on its ehall by as City Manager, a tested its City
Secretary, with the corporate seal of the City affixed, and said Deve oper has execut d this
instrument in quadruplicate, at Fort Worth, Texas this / --� day of i-e
,20 1 , .
CITY OF FORT WORTH - Recommended by:
Water Department
Wendy Chi-B aKulal, EMBA, P.E.
Development Engineering Manager
Approved as to Fonn & Legality:
Douglas W. Black
Assistant City Attorney
M&C No. 4/4-
Date: /
ATTEST:
ary J. er
City Secretary
ATTEST:
Signature
(Print) Name:
6L`k\\ e e v
r
(•J
fr--
Combined CFA Agreement — Revised January 2014
Transportation & Public Works Department
Douglas W. Wiersig, P.E.
Director
Approved by City Manager's Office
Fernando Costa
Assistant City Manager
DEVELOPER:
Dry Creek II Apartments, Ltd.
By: DRCA, LLC, its general partner
Signature
Print Name: S e (At 0 CuM0 r
Title: IL& e,tA Lee.,
FFICIAL RECORD
ti SECIRMIARY
Ft MORIN, ` i'
Check items associated with the project being undertaken; checked items must be included
as Attachments to this Agreement
Included Attachment
® Location Map
® Exhibit A: Water Improvements
® Water Estimate
❑ Exhibit A-1: Sewer Improvements
❑ Sewer Estimate
❑ Exhibit B: Paving Improvements
❑ Paving Estimate
❑ Exhibit B-1: Storm Drain Improvements
❑ Storm Drain Estimate
❑ Exhibit C: Street Lights and Signs Improvements
❑ Street Lights and Signs Estimate
(Remainder of Page Intentionally Left Blank)
10
Texas Motor
Speedway 0�
P�
0i
35W
L Teo
orthlak -0
City 99�
c Fl d r
ui
beth orth I lorth
City L mits
� Elizabethtow
Cemetery
a
CD G10
W
a Creek
H
J
W
LITSEY
CHADWICK a
FARMS
Nr
�e
0
to I N
c
VICINITYMAP
N } REMOVAL KT&
CQ 16"t
FOR
DRY CREEK APARTMENTS
11rOCA 1L 1G1Ld/11Aq
a
OF FORT WORTH, TEXAS
DEVEARMOVOMU
/
DRY CREEK H WATM PRO].#
APARTMENT'S,-LTD. ���` �
° 5360 TOWN&COUNTRY BOULEVARD �SHALL s
1 CML ENGINEERS—PLANNERS—SURVEYORS
SUM 20 2405 MUW=Q DM,GraWn®,Tw=76051
to FMCO,TEXAS 75034 Metro(617)&%4M
°— (972)668-OW
w MA�Y9 2014
r
m J NN
ui m O c
W W n
Q � as
ryl N
F Q i c
W c o
z Q w < J z w "� o
G� of > Z o Q J oa N
C✓� O J > > p Q �o L
W W w IW- _ > n,
Q w
o z L� C7 O Y
LLI mJ U U` ()
p p p
�t I1J O W N O O v
® e O I-Q O O N T
a w a a w w o� �
O � N
3 IL
o
W
U
L
U_ LO LO
d 0
1 w
lo
I
y �
O d
RPORT#J3
QS 3 G RAG #9
tr
ui 3 \ M PROPOSED B°W. M
cp
W W �---
O�I
J
Z� gq
�U 31 •
Z J� WD z ^
�O i
V, ED W yp rC'i
r J Z
0c �a LtiOX
G�0
ov O
N �
��pp ao
N 0
N
RUMSEY
CONSTRUCTION
Date 6/11/2014
Project: DRY CREEK PHASE II: OFFSITE WATER RELOCATION
Plan Date: APRIL 2014
Location: NORTHLAKE
NO Item Description Unit Qty Unit Price Total
OFFSITE WATER RELOCATION
1 16" CL-250 DI WATER LINE LF 274 $120.00 $32,880.00
2 16" DI W/ 30" CASING BY OPEN CUT LF 30 $325.00 $9,750.00'
3 CONNECT TO EXISTING 16'WATER EA 2 $2,430.00 $4,860.00
4 DUCTILE IRON FITTINGS TN 0.25 $6,335.00 $1,583.75'
5 REM & REP PAVEMENT SF 240' $29.00 $6,960.00
6 TRAFFIC CONTROL LS 1 $1,600.00 $1,600.00
7 REM & REP CHAINLINK FENCE LF 230 $34.00 $7,820.00'
8 TREE REMOVAL LS 1 $5,080.00' $5,080.00
9 TESTING LF 504 $3.00 $1,512.00
10 TRENCH SAFETY LF 304 $1.00 $304.00'
SUBTOTAL OFFSITE WATER RELOCATION $72,349.75,
Total Bid (includes all items listed above this line) $72,349.75
Received Addendum:
Alternate Add
Layout LS 1 $1,000.00 $1,000.00
Haul Off Excess (Rock Site) LS 1 $3,000.00 $3,000.00
CFA with City of Fort Worth LS 1 $2,500.00 $2,500.00
Add for Cut-in 16" Gate Valve if Needed
16" Cut-in Gate Valve- Not in Vault EA 1 $22,500.00 $22,500.00
4328 Marsh Ridge Road
Carrollton,TX 75010
Construction
Dry Creek Office:214-614-8140 Fax:214-556-1110
Dry Creek II Offsite Water Proposal 061114 6/11/2014-4:46 PM
WWW.RUMSEYLLC.COM Page 1
Inclusion / Exclusions
Project: DRY CREEK PHASE II: OFFSITE WATER RELOCATION Included
PermitFees---------------------------------------------------------------------------------------------------------- no
InspectionFees ---------------------------------------------------------------------------------------------------- no
TapFees--------------------------------------------------------------------------------------------------------------- no
ImpactFees--------------------------------------------------------------------------------------------------------- no
AllOther City Fees ------------------------------------------------------------------------------------------------ no
ConstructionStaking --------------------------------------------------------------------------------------------- add
Density Testing ----------------------------------------------------------------------------------------------------- no
Pressure and Bacteria Test Water Line--------------------------------------------------------------------- yes
Excess to be left adjacent to trench ----------------------------------------------------------------------- yes
Place Excess Excavation On Site ---------------------------------------------------------------------------- no
Haul Off of Excess Excavation -------------------------------------------------------------------------------- add
TrenchDewatering ----------------------------------------------------------------------------------------------- no
MaintenanceBonds--------------------------------------------------------------------------------------------- add
Add Performance and Payment to Bond--------------------------------------------------------------- add
Erosion Control While On Site---------------------------------------------------------------------------------- no
Barricades For Our Work---------------------------------------------------------------------------------------- yes
Topsoilor Top soiling --------------------------------------------------------------------------------------------- no
Storm Water Pollution Prevention Plan -------------------------------------------------------------------- no
Adjust or Relocate Existing Utilities -------------------------------------------------------------------------- no
NOTES: - Proposal based on Civil Plans only. Excludes any work shown on other documents.
- Due to current market conditions. PVC pricing can only be held for 30 days from bid datE
- Proposal based on one move in. Add $3500 for each additional mobilization
- Not responsible for conflicts with existing utilities
THANK YOU FOR THE OPPORTUNITY TO BID THIS PROJECT
PLEASE CALL WITH ANY QUESTIONS
COREY C. CAUGHRON (214) 498-8631 3C @RumseyLLC.com
4328 Marsh Ridge Road
Carrollton,TX 75010
Rumsey Construction Office:214-614-8140 Fax:214-556-11 10
Dry Creek 11 Offsite Water Proposal 061114 6/11/2014-4:46 PM
WWW.RUMSEYLLC.COM Page 2