HomeMy WebLinkAboutContract 41739-A2 AMENDMENT No. 2 aVy 10)EM A,W1 1
TO CITY SECRETARY CONTRACT
WHEREAS, the City of Fort Worth (CITY) and Teague Nall &
Perkins, Inc. (ENGINEER) made and entered into City Secretary Contract
No. 41739, (CONTRACT) which was authorized by M&C C-24821 on the 5t'
day of April, 2011 in the amount of $240,000 . 00; and
WHEREAS, the CONTRACT was subsequently revised by Amendment
Number 1 in the amount $6,700 . 00 which was administratively
authorized on May 29, 2012; and
WHEREAS, the CONTRACT involves engineering services for the
following project:
Water and Sanitary Sewer Replacement Contract 2009, WSM-L;
and
WHEREAS, it has become necessary to execute Amendment No. 2 to
the CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through
their duly authorized representatives, enter into the following
agreement, which amends the CONTRACT:
1 .
Article I of the CONTRACT is amended to include the
additional engineering services specified in a proposal dated July
10, 2014, a copy of which is attached hereto and incorporated herein.
The cost to City for the additional design services to be performed
by Engineer totals $28,875.00 .
2 .
Article II of the CONTRACT is amended to provide for an
increase in the fee to be paid to Engineer for all work and services
performed under the Contract, as amended, so that the total fee paid
M
M by the City for all work and services shall be an amount of
M
$275,575 .00 .
PAGE -1- OFFIMAL RECORD
a�
G�V V SIC DWI TARY
vx
3.
All other provisions of the Contract, which are not
expressly amended herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date last written by a
signatory, below.
APPROVED: ENGINEER
City of Fort Worth Teague Nall & Perkins, Inc.
C W��
Fernando Costa Ty Hilton, P.E.
Assistant City Manager Vice President
DATE: 8 1, �* DATE: /
APPROVAL RECOMMENDED:
4 r�
S. Frank Crumb, P.E.
Director, Water Department
APPROVED AS TO FORM AND M&C: N/A
M;;iL—
Date: N/A
Douglas W. Black
Assistant City Attorney 3
FO
A TEST:
°
S 0;0
Mary J. Kayser $ 8
Al)
City Secretary 4 °°„ n°°°b`�-
°
PAGE -2- mot-
RECORD
i
Tn
league n ill p rk065 www.tnpinc.com
engineers
surveyors
landscape architects
July 10, 2014
Ms. Susan Schwinger, P.E.
City of Fort Worth
Water Department
311 W Tenth Street
Fort Worth, Texas 76102
Re: Fee Proposal for Contract Amendment No. 2 —
Water and Sanitary Sewer Replacement Contract 2009, WSM-L
City of Fort Worth Project No. 01478
(TNP Project No. FTW 10255)
Dear Ms. Schwinger:
Teague Nall and Perkins, Inc. is submitting this fee Amendment for the above referenced contract
based on additional services requested. The City has requested that TNP provide the survey and
design of 750 linear feet of 8" water line and 400 linear feet of 8" sanitary sewer design along
Trueland Dr. from Rodeo St. to Gardenia Dr. to replace an existing undersized 4"water line and
aging 6" sewer line. The City has also requested that TNP provide additional design services to
eliminate an existing dead end water line located in Sarah Jane Lane,240'east of Ray Alvin Drive
by extending the proposed water line 440' to an existing line in Rodeo Street. The following is a
brief description and cost for the additional services to be provided on this project:
1. Design of Trueland Drive 8" Water Line and 8" Sewer Line
The scope of services necessary to accomplish the design of the Trueland Drive water and
sewer lines is addressed below.
A. Design
1. Water line design effort will involve the proposed water line horizontal alignment,
evaluation of fire hydrant coverage, locations and sizes of all water service lines and
meter boxes,gate valve locations, isolation valve determination, and creation of plan
sheets. It is assumed there will be one preliminary submittal and one set of City
comments prior to these sheets being added to the WSM-L plan set.
2. Sewer line design effort will involve the proposed sewer line horizontal alignment,
vertical profile, locations of all sewer service lines, verification that all TCEQ
requirements are met, and creation of plan sheets. It is assumed there will be one
preliminary submittal and one set of City comments prior to these sheets being added
to the WSM-L plan set.
B. Survey
1. An additional approximately 800 linear feet of topographic and design survey will be
required within Trueland Drive right of way and the Trueland Drive/Gardenia Drive
intersection to design the Trueland Drive water line from Rodeo St. to Gardenia Dr.
The following surveying services will be provided:
i. Research parcels/lots along proposed route, prepare a deed sketch, and
provide addresses of adjacent parcels/lots.
Fort Worth 1 100 Macon Street-Fort Worth,Texas 76102—817.336.5773 Dallas 17304 Preston Road,Suite 1340-Dallas,Texas 75252-21 4.461.9867
Denton-1517 Centre Place Drive,Suite 320—Denton,Texas 76205-940.383.4177 Sherman-200 North Travis Street,Suite 500-Sherman,Texas 75090-903.870.1089
Registered by the Texas Board of Professional Engineers,Firm No.F-230 Registered by the Texas Board of Professional Surveyors,Firm No.100116-00
Ms.Susan Schwinger,P.E.
July 10,2014
Page 2 of 3
ii. Extend the horizontal and vertical control for the project from existing
control set by ANA Consultants in the original survey.
iii. Provide a topographic survey including all improvements (water valves,
manholes,curbs, etc.)and measure downs of all utility manholes from right
of way to right of way for Trueland Drive.
II. Design of Sarah Jane Lane 8"Water Line Extension Located 240' East of Ray Alvin St.
The scope of services necessary to accomplish the design of the Sarah Jane Lane water line
extension is addressed below.
A. Design
1. Design effort will involve the proposed waterline horizontal alignment, evaluation of
fire hydrant coverage, locations and sizes of all water service lines and meter
boxes, gate valve locations, isolation valve determination, and creation of plan
sheets. It is assumed there will be one preliminary submittal and one set of City
comments prior to these sheets being added to the WSM-L plan set.
B. Survey
1. No additional survey is required for the extension of the Sarah Jane Lane 8"water
line as the proposed alignment is located within an area included in the original
survey.
Fee Proposal for Contract Amendment No. 2: $ 28,875.00
TNP proposes a fixed fee of$28,875.00 to accomplish the scope of services described above. This
fee shall be full compensation for work required of TNP.
Summary of Fees:
I. Design of Trueland Water Line
A-2. Water Line Design $ 10,250
A-1. Sewer Line Design $ 7,200
B. Survey $ 5,400
Il. Design of Sarah Jane Ln. Water Line Extension
A. Design $ 6,025
B. Survey $ 0
Total $ 28,875
M/WBE Utilization:
Due to time constraints, the City has directed TNP to use its own forces to complete these
additional services more quickly.With this amendment,the overall M/WBE commitment will now be
20.1%, dropping below the City's M/WBE goal of 22.0%.
Summary of Contract Fee:
Original Contract Amount: $ 240,000
Amendment No. 1 $ 6,700
Amendment No. 2 $ 28,875
Revised Contract Amount $ 275,575
l
Ms.Susan Schwinger,P.E.
July 10,2014
Page 3 of 3
Thank you for consideration of this contract amendment request. If you have any questions,please
do not hesitate to call me.
Sincerely,
TEAGUE NALL AND PERKINS, INC.
Andrew Luce, P.E.
Project Manager
m
o�1JW EAU Z
°� m(�T'90d�O�1N(J W C1�TO NCI W(JTVO»
� 2-mT2�3 nm` =d mN�c v_3.c��2w2v3.c�mn
'�mnm°r my v°mn�Omv°mn_m°_
a m33 NN
IN
-i
4
_ Ifi amv
3; -
-
5 —p
N O G
O
,N D
oa _ ZO
m�'nr Z
m m N D �
m m n m
a. 3 0
r= 3 m o A C
° zD<.ACn
c m m D�
0 Q S
E n z
_z N Z
N o
in
;5 qd
_ cO
£m
� 2 �
_ °3
o�
r�
_ W N
a m
0
r3 m
04 om K
z 1
°F\mm -
t�v� ?�im23 zi _
3 N
�bi _ O