Loading...
HomeMy WebLinkAboutContract 30203 AMENDMENT NO. 1 STATE OF TEXAS $ CITY SECRETARY CONTRACT NO. No M&C Needed) COUNTY OF TARRANT $ WHEREAS, the City of Fort Worth (City) and A.N.A Consultants, L.L.0 (Engineer) made and entered into City Secretary Contract No. 29018 (the Contract) which was authorized by the City Council by M&C C-19700 on the 12th day of August, 2003; and WHEREAS, the Contract involves engineering services for the following project: Engineering contract for Water and Sanitary Sewer Replacement Contract, 2002 STM-O. WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contract: 1 . Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated June 8, 2004 , a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $24 ,793.00. 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $181,886.00. qRIGINAL 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the I Li-�')- day of :i)YL , 2004 , in Fort Worth, Tarrant County, Texas. ATTEST: Contract Authorization Sy via Glover Its Acting City Secretary Date APPROVAL RECOMMENDED: PROVED: A. Douglas Rademaker, P.E. Marc A. btt Director, Department of Assistant City Manager Engineering A.N.A Consultants, L.L.C. ENGINEER BY Name:Mark N. Assaad, P.E. Vice President 1701 River Run, Suite 610 Fort Worth, TX 76107 APPROVED AS TO FORM AND LEGALITY: Gary Steinberger Assistant City Attorney -2- A+ �� Worth,Texas River Run DALL4S � A������3�' Suite 610 CoNsFort Texas 76107 ULTANTS, L.L.C. (817)335-9900 ENGINEERS*SUR VE YORS*PLA NNERS Fax(817)335-9955 June 8, 2004 Mr. Rakesh Chaubey, P.E. Project Manager City of Fort Worth-Department of Engineering 901 Monroe Street, Ste 201 Fort Worth, Texas 76102 Re: Amendment No, 1 Water and Sanitary Sewer Replacement Contract 2002 STM-0 Water Project No. PW53-060530176610 Sewer Project No. PS58-070580175940 D.O.E. No. 3991 South Hills Avenue from University Drive to Trail Lake Drive W. Spurgeon Street from Hemphill Street to College Avenue Townsend Drive from W. Spurgeon Street to Yates Street Westcrest Drive from Wayside Drive to Edgecliff Road Dear Mr. Chaubey: Due to numerous breaks in the existing 12" water line in Fuller Street the City has requested ANA Consultants to include the replacement of the 12" water line in Fuller Street from Mc Cart to Gordon Avenue, the City has requested the City has requested this line segment be added to A.N.A. Consultants current contract for STM-O. The following summary for Amendment No. 1 is presented for your review: • Design of approximately 1,750 If 12" water line • Design of approximately 750 If 8" water line This request for additional services are not part of our existing contract and will exceed our current scope of work for this project. A.N.A. Consultants, L.L.C. is recommending that our current contract be amended to include these additional services and corresponding fee adjustments. The following summary for Amendment No. 1 is presented for your review: • Estimated Construction Costs for All Lines = $ 171,680.00 Basic Engineering Fee based on % of construction (T.S.P.E. Curve %) (TSPE Curve 10% x 0.85 = 8.5 %) $ 14,593.00 GAJOB10300301contractlAmend 1 Request 05-12-04.doc Engineering Excellence 1701 River Run DALL4SL�A Suite 610 Fort Worth,Texas 76107 FORT WORTH NTS, L.L.C. (317)335-9900 CONSULTA ENGINEERS*SVRI'EYORS*PLANNERS Fax(817)335-9955 • Basic Services Total $ 14,593.00 Basic Design Fee (2,500 If 8" & 12"Water Line) $ 17,200.00 • Special Services Total $ 9,270.00 Basic Design Surveys(2,500 If) $ 7,500.00 Railroad Permit $ 1,500.00 10% for Sub-consultant Services $ 270.00 • Reproduction* Total $ 930.00 Plats and Deeds $ 200.00 13 Sets of Preliminary Plans (utility clearance) $ 200.00 40 Sets of Construction Plans $ 500.00 1 Set of Mylars $ 30.00 * Estimated total of 5 sheets. TOTAL LUMP SUM AMENDMENT No. 1 $ 24,793.00 Water Design Fee $ 24,793.00 (100.0%) Sewer Design Fee $ 0.00 (0.0%) The following is a revised Project Fee Summary to include Amendment No. 1: Original Contract $ 157,093.00 Amendment No. 1 $ 24,793.00 Total $ 181,886.00 All current contractual requirements shall apply to the Amendment No.1 services. In order to meet our M/WBE goal for this project, we will be using our current Sub-consultant, L.A. Blueline to participate in reprographic services for Amendment No. 1 services for the amount of$ 1,984.00. This will result in an 8% portion of this Amendment No. 1. If you have any questions or require additional information, please give me a call. Sincerely, A.N.A. Consultants, L.L.C. "-)- C-"t^4A­e'- Richard D. Contreras Principal Attachment Exhibit B-1 Cost Estimate Exhibit C Location Map G:\JOB\030030\contract\Amend 1 Request 05-12-04.doc Engineering Excellence 9 12 9 6 I1 IR 11 p 15 • 11 ZI 2BO E 5 12 E, BOYCE AVE. 6" 6" 4'C 9R , 5 W 26 5 1 CO 1 2 3 4 5 5 1 2 3 5 6 3 ci L3A O F 99 I}6 F F FUL 0 AV 99 SPURGEONF V 1 I 2- 1 ARV 1 24 1 24 a (V 2 23 2 = 23 O 2 23 2 23 2 23 m F 0 12 u 3 12 W 3 22 0 3 22 3 22 u$ '1362 4 21 ISR 6R ip 21 'O 4 21 Ip 21 10 21 O b 4 10 H 20 20 20 w o S a 5 20 S — — 7 T9 III 19 6 19 6 19 6 19 FE IX 8 19 73R 'C1 1171 7 18 7 18 7 18 J A 18 7 la 6 B U i0 B . 17 8 17 8 17 0 6 17 A d G 16 9 6R 'QUA f6 9 16 in 9 16 16 8 88315 10 w b 1g 6 15 17 14 3 14 11 14 11 14 II G 23 4 p 12 3 13 12" CI 1 r- ------- - - ---- ---- ---- ---- ---- 4 2 23 2 1 1 2 23 2 23 23 3 22 k-4 3 OI 1 3 22 3 22 22 i° 4 21 1 1 25PROP V 20 5 1 1 g 6 1 I 19 6 t9 6 19 6 19 ARV 1 I 7 18 7 IRI 1 I WA T` 18 7 18 7 IB 7 18 n B 1 1 H 17 8 O 17 9 16 g W I I PROP _!!6 9 16 9 16 3 I6 W10 15 10 c I I 15 'o IS m 15 10 15 11I4 VI 11 i I 11 14 W 11 14 yy 11 14 yj 12 13 t11 1 WA 13 12 ST 1} 6 12 13 < 12 13 MARTIN LYNDON 1 24 IR 1--J ' 24 1 24 1 24 G t 24 F 2 23 2 uj 2 23 2 23 2 23 8 2 23 136 3 22 3 Q 3 22 3 22 3 22 3 22 4 21 9 21 4 21 4 21 4 21 5 20 5 5 20 20 5 20 5 20 19 5 6 19 19 19 io 7 18 7 A 7 in 18 18 18 6 17 OL• 6 17 8 8 17 8 17 9 16 9 W 9 i6 W 9 16 9 16 9 16 W 5 p 15 10 K l0 IS Z m t5 10 15 t0 G 14 U I1 G 1t I4 }^ II 14 a. 11 B 11 G Ia 883 13 3 12 } 9z R 13 4 YA $IS 12 ST. 12 3 13 12" CI 1"ARV 12" CI 1 24 1 m 24 1 2a Ll 2a232 23 x 23 23 04 22 3 22 3 22 22 21 A T TACHMENT "C" (SHEET 1) (COUNCIL DISTRICT 9) FULLER STREET (Mc CART ST. TO GORDON ST.) WA TER MAIN 1MPRO VEMEN TS WATER & SEWER REPLACEMENT CONTRACT 2002 STM-0 SCALE 1" - 400' W TR 2048-368 A ANA CONSULTANTS MAPSCO 90M & 91J A1701 RIVER RUN 2SUrTE 610/FORT WORTH,TR 76107 W TR PROD. NO. PW53-060530176610 • sux92Tvo,� (817133,`990WFNf:(8171335--9955 SWR PROD. NO. PS58-070580175940 DOE N0. 3991 00304w&actlkXH8RS.dgn 08!0832004 10:47:02 AM