Loading...
HomeMy WebLinkAboutContract 30204 Ci 1 Y Rp,CT NO Y•� CONT AMENDMENT NO. 5 STATE OF TEXAS 3 CITY SECRETARY CONTRACT (No M&C Needed) COUNTY OF TARRANT 3 WHEREAS, the City of Fort Worth (City) and Kimley-Horn and Associates, Inc . Consulting Engineers, (the "Engineer" ) made and entered into City Secretary Contract No. 26995 (the Contract) which was authorized by the City Council by M&C C-18677 on the 24th day of July, 2001; and WHEREAS, the Contract involves engineering services for the following project : Water pressure analysis and design of water line for four localized area. WHEREAS, it has become necessary to execute Amendment No. 5 to said Contract to include an increased scope of work and revised maximum fee; "THE ADDITIONAL DESIGN OF WATER LINE AND MAKE A CONNECTION OF EXISTING WATER LINE WITH THE PROPOSED WATER LINE" NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract : 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated April 30, 2004, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $2, 995 . 00 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not ex7e ,. t: a --sum- f $201, 686 . 90 - - - - - 3 . All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect . EXECUTED on this the }� day of 2004 , in Fort Worth, Tarrant County, Texas. APPROVAL RECOMMENDED: APPROV A. Douglas Rademaker, P.E. Marc Ott Director, Department of Assistant City Manager Engineering Kimley-Horn and Associates, Inc. ENGINEER AT ;E: S lvia Glove ,4City Secretary By: Name: Glenn A. Gary, P.E. Vice President 801 Cherry Street,unit 11 , Suite 1100 contract Authorization Fort Worth, Tx.102 Date APPROVED AS TO FORM AND LEGALITY: Gary Steinberger Assistant City Attorney 2 ❑�❑ Kimley-Horn and Associates, Inc. April 30, 2004 Suite 1025 801 Cherry Street,Unit 11 Mr. Fred Ehia P.E. Fon worth,Texas 76102.6803 Project Manager City of Fort Worth Engineering Department 1000 Throckmorton Street Fort Worth,TX 76102 Re: Fort Worth—Pressure Analysis&Design—Camelot Water Line Additional Services—Revisions of the Construction Documents Contract Amendment No. 5 KHA No. 061018016 Dear Fred: The City of Fort Worth has requested that Kimley-Horn revise the construction documents to serve a property on the North West corner of Crowley Road (FM 73 1) and West Everman Parkway from the South Side III pressure plane. These items were not included in the Kimley-Horn scope for this project. The following is a description of the scope for this item: Crowley Road The ENGINEER will revise the plan and profile sheet for Crowley Road (Sheet 4 of the plans) and prepare an opinion of probable construction cost to show the connection of the existing 8-inch water into the proposed 12-inch South Side III water line. The ENGINEER will also coordinate these improvements with TxDOT and prepare and submit a traffic control plan for their review. When signed, this letter will serve as an increase to our contract for these additional services. The total design fee for the Camelot design will increase from$79,941.90 to$82,936.90. The total scope for both the study and design will increase from$198,691.90 to$201,686.90 which is$2,995.00 above the total authorized amount for this project of$198,691.90. A summary of the amendment number 5 recommendations are as follows: • Crowley Road $2,995.00 Total Increase $2,995.00 The services for this contract are on a reimbursable basis with a total authorized fee of$198,691.90. The following is a breakdown of the budget for this project: ■ TEL 817 335 6511 FAX 817 335 5070 I(Inliey-Horn Mn Fred Ehia,April 30,2004,Page 2 and Associates, Inc. • Analysis and Report (three study areas) $ 95,000.00 • Analysis and Report(two study areas) $ 23,750.00 • Camelot Design and Bidding $ 55,830.00 • Camelot Permanent Easements $ 2,200.00 • Additional Design Tasks $ 15,600.00 • Revisions to the Contract Documents $ 4,600.00 • Pre-Construction and Public Meeting $ 1,711.90 • Revisions to the Contract Documents $ 2,995.00 Total $201,686.90 • Total Authorized Budget $198,691.90 • Total Tasks $201,686.90 Fee Above the Authorized Amount $2,995.00 If you concur in all the foregoing and wish to direct us to proceed with the additional services, please have authorized persons execute both copies of this document in the spaces provided below, retain one copy and return the other to me. We appreciate the opportunity to be of continued service to the City. Please contact us if we need to provide any further information. Very truly yours, KIMLEY-HORN AND ASSOCIATES, INC. Glenn A. Gary, P.E. Vice President GAG/CTD Copy to: Mr. Doo Kim, P.E., Fort Worth Water Department P.\061018.016\P p p\Addi t lona IA mdt 5.doe Agreed to this day of , 2003. CITY OF FORT WORTH, TEXAS By: (Print or Type Name) Title: