Loading...
HomeMy WebLinkAboutContract 30602 COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. IAZ_ WHEREAS, Southwest Lodging, Inc., hereinafter called "Developer", desires to make certain storm drain improvements to Lot 5, Block 9B, Northern Crossing Addition, an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a municipal corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: That said Developer, acting herein by and through Lyle LaBou, its duly authorized owner, and the City, acting herein by and through Marc Ott, its duly authorized Assistant City Manager, for and in consideration of the covenants and conditions contained herein, do hereby agree as follows: I. General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Contract as if copy herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder. B. The requirements of the Policy shall govern this Community Facilities Agreement, provided, however, that any conflict between the terms of this Community Facilities Agreement and the Policy shall be resolved in favor of this Agreement. C. Developer shall provide financial security in conformance with paragraph 6, Section 11, of the Policy. D. The Developer shall award all contracts for the construction of community facilities in accordance with Section H, paragraph 7 of the Policy. E. The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section 11, of the Policy. CFA NORTHERN CROSSING STORM DRAIN ON TANA CROSS F. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. G. Developer shall install or adjust all of the required utilities to serve the development or to construct the improvements required herein. H. In the event that City participation exceeds $25,000, Developer agrees that no street construction or storm drainage will begin prior to City Council approval of this Community Facilities Agreement. (Article 104.100, Ordinance 7234). I. Developer agrees that no lot shall be occupied under a certificate of occupancy until the improvements required herein have been constructed (Article 104.100, Ordinance 7234). J. Developer hereby releases and agrees to indemnify and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this contract. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer required to construct current and future improvements provided for in this agreement. L. Developer agrees to construct proposed improvements as shown on the exhibits attached hereto. The following exhibits are made a part hereof: CFA NORTHERN CROSSING STORM DRAIN ON TANA CROSS Water (A) None; Sewer (A-1) None; Paving (B) none; Storm Drain (B-1) attached; Street Lights and Signs (C) none. II. Street and Storm Drain Facilities A. The Developer(s) agree to install or to cause to have installed, the street, storm drainage, street lighting, street name sign and other community facilities improvements shown as "current improvements" on the attached Exhibits B 1. B. As shown below in the "Summary of Cost for Street and Storm Drain Facilities", the Developer shall fund its share of "current improvements" and shall pay to the City for its share of the cost of street, storm drainage, street lighting, street name signs as shown on the attached Exhibits B1. The estimated total cost of current improvements and related support services specified in this agreement, including design, construction and inspection is estimated to $5,304.00 Item Developer City Cost Total Cost Cost A. Construction 1. Streets $ - $ - $ - 2. Storm Drainage $ 5,100.00 $ - $ 51100.00 3. Street Lights $ - $ - $ - 4. Street Name Signs $ - $ - $ B. Engineering Design $ - $ - $ C. Construction Engineering and Mana ement by DOE 2% $ 204.00 $ - TOTALS $ 5,304.00 $ - $ 5,304.00 Storm Drain Improvements only. Notes: CFA NORTHERN CROSSING STORM DRAIN ON TANACROSS IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed this instrument in triplicate, at Fort Worth,Texas this the flay of 200 .j Approval Recommended: Transportation and Public Works Department 0 Robert Goode,P. E. Director ATTEST: City Of Fort Worth B MARTY HENDR Marc Ott City Secretary Assistant City Manager Approved as to Form: Njalo( C;C" contract Authorization Assistan ity Attorney Date ATTEST: DEVELOPER South w Lodgi , Inc. By: Corporate Secretary Lyle aBou, Owner CFA NORTHERN CROSSING STORM DRAIN ON TANA CROSS 1 A @ >t aWo. z 5 I , 1 • `i tt i4G^Sd 8 t r `t f� � '��' 0 / ` 8 / ■ /• �- _ iii � �I --i� 3 ( '; ��� ..�:� 'jam � �`'i •\ • \®`b Fi k E E tt 4 jq� t pS (yi � fit��yy'^ ppgR7��vg. 9 �A]']# EL� •;�'1 � E ■ ��{t li Ili�� R S E QCD .�.. 's N nb +frtyw ' t ! d t tl ■ R ■ e�Lie d�� �� p$>�� �[[a � ���?� �, t H t4� �f ��sg C�^� ■�9�Q(� I 1 ' � Q I 1 I p�� sm -i 3 �I,_ !-1 � '� %•�t Sal I� . , e a 'i � �'e.--s-�w o■r l v r r•I I• 1�4 a t t I N ;90'1• ;tc: P {^�=aF1 wa: '. I i ' ■ . I 1 I 1 i d.:-• IN 2 I .\ w n Z 1z 2i: 10 I IL Nni ai qj d vi- -5.1. 7hiM. R41 H- OC Y2 CLerD Ha IP Sig W vie CN CD Kit 6 141 M111 15 IF9 ill mg;N"N fit i ............. ------- -------- I z; I f rlSe sJ`' �`N f i It jlj-. Nov 10 03 01 : 41p Cleburne Utility 817-558-6703 F. 2 11/07/03 Bid No. Proposal From: Cleburne Utility Construction.Inc, 1429 OR 426 Cleburne,TX 76031 Office (817)558-1590 Fax (817)558-6703 Proposal For. Budget Most Hotel CRY of Fort Worth Item Quantity Unit Description Unit Price Total r.tvaw 1 100 If 21"RCP Storm sewer pipe $60.00 $6,000,00 2 70 If 18"RCP Storm sewer pipe $57.00 $3,990.00 3 1 ea 2'x2'rratr.inlet $1,500.00 51.500.00 4 1 ea 3'x T Grate inlet $1,910.00 $1,910.00 $93,400.00 City ROW 1 30 I( 21-CL III RCP Storm sewer pipe $60.001 31,800.00 2 1 ea Connect 11-MCP 10 exlsttng 54"RCP $1.000,00 S1,OOo.I)D 3 1 Is Concrete pavement repair(one panel only) $2,300.001 $2,300.00 $5,100.00 Price includes:Lapor,equipment.materials and haul oh. Price excludes'Bond,inspection fees,permits,Impact fees,capital recovery fees,lap fees,orosion control,proctors or densities Ploaee noto.The pitvAmvnt reolacement is for one panel only. This price is based on Completing work while we are working on city contract. i HfUl L,4. 5 9L I O X e Nov 10 03 01r41p Cleburne Utility 817-558-E703 p . 3 u I 11111.n 11 '011 1 1 '1 — I b I 1 lailgr;r �^ 1 ..1, f Y , y •I ' � ✓ � rl III l n iu 7,r 111 f U r L ,II • ty `1, 1 I Ir+y�lr-:rs reyuireci whene}�er �3 i '' '" I{I rll?I'"f),;II1(.( Iraffir., reclUired 11) 11'r;r' S.":►I11(' �1(lE'. nl o " r; r�.1•l1^,InrnCr•.,,I,...'..I Y 0 „� �,lu•�1- x,1,1111,.,..1 I I,�.' .. ` N1:Iy 11r 11-11,i,. .1 1'. 1 I i;igg('rs Shall he in constant r Ir Iri f ,rl I"I..•... Ind 11) cx)nl i-Ii✓1. ,•, N(Ic:rrnrjr(,.hraliny uound rin(y)nr slations r11U51 be 11� 1i111,lrcrl r71 rlighl. ROAD WDrt1C i T I Itis; 111;111 i SLIhmiiled (Or TC�'. I cellily lhi.; 1)1;111 will i,h r1 wil If)[ OW (11111r;.:111'I I ' III •I, 1 I i ;inn Hint o11 chanhelizing.devires will conform le.) "1:;11111 1%tl M"Ilrtr." ;r.t '.II ..',1l • •I. 11,.. I• 1 ui CITY OF FORT WORTH TYPICAL TWO WAY STREE (- TRANSPORTATION _ LANE CLOSURE AND hi 101 1(, 1n�nRKS ,_.See Irvr.lsr. siclr. Inr c;r.l,rr,v rlr,rf-:,nf1 I)(:•/ir ff