Loading...
HomeMy WebLinkAboutContract 30903 AMENDMENT NO. 1 STATE OF TEXAS b CITY SECRETARY CONTRACT NO. (No M&C Needed) COUNTY OF TARRANT $ WHEREAS, the City of Fort Worth (City) and CH2M Hill, Inc . , (Engineer) made and entered into City Secretary Contract No. 28977, (the Contract) which was authorized by the City Council by M&C C-19675 on the 29th day of July 2003 ; and WHEREAS, the Contract involves engineering services for the following project: Engineering contract for the design of Southside II Water Transmission Main from Rolling Hills Treatment Plant to the Crowley Road/Risinger Road Intersection. WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated October 6, 2004, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $8, 700 . 00 . 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $622, 649 .00 . ORIGINAL 3 . All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the I _ day of l�l�� �� 1 2004, in Fort Worth, Tarrant County, Texas. ATTEST: r�, f ChContract Authoriaatiox Marty Hend x, City Se retary Date APPROVAL RECOMMENDED: APPROV lr A. Douglas Rademaker, P.E. Marc . Ott Director, Department of Assist nt City Manager Engineering CH2M Hill,Inc. ENGINEER By: K� Name: Gordon Koblitz, P.E. Vice-President 210 W. 6th Street, Suite 1205 Fort Worth, TX 76102 APPROVED AS TO FORM AND LEGALITY: Gary Stei'ftberger Assistant City Attorney 22266-6 -2- ATTACHMENT A - AMENDMENT NO. 1 CHM ML 2SQWEST 6T"STREET SUITE 1208 FORT WORTH,TX 76142 Poona:817-670-1129 Fax:817-878-M3 October G,2004 Mike Domeriech,F.E. Fort W ortij Eng neering Department 900 Monroe'Street,Suite 201 Fort Worth.,TX 76102 Subject: Soufhside H Water Transmission Main Surge Analysis Proposal Dear Mr Domei7edt ` Per your request,we have.prepared a Scope of Services to perform a.surge analysis for-the Southside ll Water Transmission Main from Rolling Hills Water TreattmntI'lant to the-Crowley load/Rsinger_Road Intersection. The following describes the proposed.Surge Analysis Scope and Cost Task t.Vats Gathering Obtain the following data from the City and/or other sources in order to perform the surge analysis: • Pump curves at Rolling Hills WTP • Sump elevation(or range of elevations)at the WTP • Downstream.boundarycondidons (anticipated pressure(s)at Crowley/Risinger connection). • Maximum flow anticipated in the transmission main • Any additional,information reqs Bred by the modelers to perform an adequate surge analysis. 'ask 2 Surge Modeling Perform surge modeling on the approximate 7 miles of 48"and 54"Southside II WTM,from the Rolling Hills WTP to the connection near Crowley and Risinger Roads. Task 3:Technical Memo Document the surge modeling procedures,all boundary conditions and assumptions used in the model,the-results from the surge model,and recommendations for surge protection on the. Southside II WTM. Schedule We will attempt to obtain all data within one week of notice to proceed,with the understanding that response from outside parties may be beyond our control.Upon obtaining all the data required,we will perform the surge modelling and produce the final technical.memo within 14 calendar days. Our total proposed fee for performing the work is=$8,700.00. If you have Any questions or require additional information,please do nothesitate to contact.us. Sincerely,. CH2M HILL z)j, L"' Douglas Biglen,P E. Project Manager Surge Analysis aoposal,doc