HomeMy WebLinkAboutContract 31102 COMMUNI'T'Y FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.,;[I-
WHEREAS, The Burlington Northern and Santa Fe Railway Company (BNSF),
hereinafter called "Developer", desires to make certain improvements to 1801 Intermodal
Parkway, an addition to the City of Fort Worth, Texas; and
WHEREAS,the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
That said Developer, acting herein by and through Ray Herman, its duly
authorized representative, and the City, acting herein by and through Marc Ott, its duly
authorized Assistant City Manager, for and in consideration of the covenants and
conditions contained herein, do hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated
March 2001, approved by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Contract as if copy
herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of this
Community Facilities Agreement and the Policy shall be resolved in favor
of this Agreement.
C. Developer shall provide financial security in conformance with paragraph
6, Section II, of the Policy.
D. The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy_
E. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the Policy.
(SFA REVISED FORMAT WITH 4%doe 1
F. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers,
agents and employees from all suits, actions or claims of any character,
whether real or asserted, brought for or on account of any injuries or
damages sustained by any persons (including death) or to any property,
resulting from or in connection with the construction, design, performance
or completion of any work to be performed by said Developer, his
contractors, subcontractors, officers, agents or employees, or in
consequence of any failure to properly safeguard the work, or on account
of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub-contractors, officers, agents or
employees, whether or not such injuries, death or damages are caused,
in whole or in part, by the alleged negligence of the City of Fort Worth,
its officers, servants, or employees.
G. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
H. In the event that City participation exceeds $25,000, Developer agrees that
no street construction or storm drainage will begin prior to City Council
approval of this Community Facilities Agreement. (Article 104.100,
Ordinance 7234).
I. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been constructed
(Article 104.100, Ordinance 7234).
J. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications and
cost estimates supplied by the Developer for this contract.
K. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to construct
current and future improvements provided for in this agreement.
L. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part hereof:
CFA RFVTSFD FORMAT WTTH 4%.doc 2
} Water(A)None; Sewer (A-1)None; Paving(B) attached; Storm Drain (13-
1)none; Street Lights and Signs (C)none.
II. Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibit B.
B. As shown in the "Summary of Cost for Street Facilities", the Developer
shall fund its share of"current improvements" and shall pay to the City for
its share of the cost of street, storm drainage, street lighting, street name
signs as shown on the attached Exhibits B. The estimated total cost of
current improvements and related support services specified in this
agreement, including design, construction and inspection is estimated to
$
Notes:
1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets.
The developer is responsible for installation of sidewalk and a separate financial
guarantee is required in the form of a bond or check for the cost of the sidewalk.
2. Developer's column for Item C represents four percent(4%) cost for construction
inspection fees and materials testing. The City will pay additional inspection fee over
4%.
3. City not preparing plans and specifications.
1
CFA RFVTSFT7 FORMAT WITH 4%.doc i ==
SUMMARY OF COST
1801 Intermodal Parkway
BNSF RR
Item Developer City Cost Total Cost
Cost
A. Construction $
1. Streets $14,965.50 $ 14,965.50
2. Storm Drainage $0.00 $ -
3. Street Lights $0.00 $ -
4. Street Name Signs $0.00 $ -
B. Engineering Design $ -
C. Construction Engineering
and Management by DOE 4% $ 598.62 598.62
TOTALS $ 15,564.12 $ - $ 15,564.12
CFA CODE: 4
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executedin quadruplicate in its name and on its behalf by its Assistant City Manager,
attested by its City Secretary, with the corporate seal of the City affixed, and saideveloper
has executed this instrument in triplicate,at Fort Worth, Texas this the�ly of� C�
,2004.
Approval Recommended:
Transportation and Public Works
ATTEST: Department
Robert Gilode, P. E.
Marty Hendrix Director
City Secretary
ity o Wo
� :,n�rcct Autiiorizatio� /
- Marc 6tt
late Assistant City Manager
Approved as to Form:
Assistant City Attorney
ATTEST. DEVELOPER
By:
Corporate Secretary
CFA RF,VTSRD FORMAT WITH 4%.dnc 4 yry�'nllj b"^^(IIIi Mu
i
BNSF-1801 Intermodal Parkway Request for CFA
Summary of Cost for Street Facilities for Right Turn Lane Construction
Bid Item# Bid Item Description Unit Quantity Unit Price Cost
City of Fort Worth Cost $0.00
Developer(BNSF)Cost
29 Sawcuth-emove existing pavement incl.curb S.Y. 13.00 $6.50 $84.50
and gutter
36 Refl.Pvmnt.N&g.Type U(4")(White and LF 174 $0.50 $87.00
Yellow
110 Pavement direction arrow(Right Turn)-Type I EA 1 $250.00 $250.04
115 Excavation,including disposal and hauling CY 90 $12.00 $1,080.00
Concrete Pavement 12"Thick -Class P-4400
PSI(including monolithic 6"curb,
1 17 reinforcement,dowels,sawcutting&sealant for SY 272 $45.00 $12 240.00
joints,CIP)
118 Lime Treated Subgrade 9"Thick(150 lbs per SY 272 $4.50 $1,224.00
CY-Slurry Placement-TxDOT Spec 260)
Total= $14,965.50
Inspection Fee(4%of Construction Cost)= $598.62
Construction Estimate for Right Tum Lane.)ds Page 1 of 1 8/11/2004
1J/IV[UIMI 9ve-4i nA shles
F7'
v
0.00
2+00
y [[---rrt—,
- I ,
15:1 TAPER
r'
ra61
O,
—r w w w )
1 III
4D----4AN------SAN SAF—;AX—moi AF AF / IAF i AN `AM `AF $AN------.AM------S AN-5 ANSAM `AM
15:1 TAPER
ao ,
121
p ;RIGHT EXISTING PROPOSED
PROPOSE
TURN/DEQELLANE ENTRANCE LANES TURNING LANE
--�
Q '
SAWCUT LINE
__EXIST. GRADE E 2%
7L —I /''�
L_L—
J TURNING LANE TYPICAL SECTION
N.T.S.
El
O PVI
W
� I
z
—
20' PUBLIC UTILITY ,EASEMENT
7 R�150, 15` PUBLIC UTILITY EASEMENT
1 ? 0' CITY 0 r
ROW LINE
FORT WORTH ROW
I
SHEET P�E�oF�Te ,1 BURLINGTON NORTHERN SANTA
Exhibit B
RAILWAY COMPANY
*: *� Right Turn/Decel Lane Details
Of %DEREK D. IJEIER % ALLIANCE INTERMODAL
/�P• 8979
.............
.'�i 3950 FOSSIL CREEK BLVD. usw�[o D.D.MEIER
FACILITY HANSON SUITE 106 Bn
F�! J8 HUNT PARKING LOT FORT WORTH,TEXAS 75137 DRAWN D.D.AIEIER
ss AND ENTRANCE ROAD40.
WILSON AE�
A N 817-232-2248
���`���.�• h ' 817.232-4909 FAX By, P.J.PAMLA