HomeMy WebLinkAboutContract 32402 COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No
Tarrant County Care, Ltd./Griffin Construction Co.
WHEREAS, A , hereinafter called "Developer", desires to make certain
improvements toALTAMe-51 TFA-(1--14d an addition to the City of Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and
the Developer do hereby agree as follows:
1. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy")
dated March 2001, approved by the City Council of the City of Fort
Worth, is hereby incorporated into this Community Facilities Contract
as if copy herein verbatim. Developer agrees to comply with all
provisions of said Policy in the performance of its duties and
obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of
this Community Facilities Agreement and the Policy shall be resolved
in favor of this Agreement.
C. Developer shall provide financial security in conformance with
paragraph 6, Section II, of the Policy.
D. The Developer shall award all contracts for the construction of
community facilities in accordance with Section II, paragraph 7 of the
Policy.
E. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the
Policy.
TrailAddn-NewerCFA4%andUtilities07140dfutureimpexception.doc
F. The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injurids or damages sustained by any persons (including death) or to
any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by
said Developer, his contractors, subcontractors, officers, agents or
employees, or in consequence of any failure to properly safeguard the
work, or on account of any act, intentional or otherwise, neglect or
misconduct of said DEVELOPER, his contractors, sub-contractors,
officers, agents or employees, whether or not such injuries, death or
damazes are caused, in whole or in part, by the alleged nealiQence of
the City of Fort Worth, its officers, servants, or employees.
G. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
H. In the event that City participation exceeds $25,000, Developer agrees
that no street construction or storm drainage will begin prior to City
Council approval of this Community Facilities Agreement. (Article
104.100, Ordinance 7234).
I. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been
constructed (Article 104.100, Ordinance 7234). This section shall not
apply to the construction of future improvements.
J. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this contract.
K. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to
construct current and future improvements provided for in this
agreement.
TrailAddn-NewerCFA4%andUtilities071404futureimpexception.doc
L. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part
hereof: Water (A)None; Sewer (A-1) None; Paving (B)Attached
Storm Drain (B-1) Attached; Street Lights and Signs (C) Attached.
M. City shall not be responsible for any costs that may be incurred by
Developer in the relocation of any utilities that are or may be in
conflict with any of the community facilities to be installed hereunder.
II. Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibits B, B1, and C.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibits B, B 1,
and C. The estimated total cost of current improvements and related
support services specified in this agreement, including design,
construction and inspection is estimated to $11,284.62.
TrailAddn-NewerCFA4%andUtilities071405futureimpexception.doc
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager,
attested by its City Secretary, with the corporate seal of the City affixed, and saidD velo Thas executed this instrument in triplicate, at Fort Worth,Texas this the�day of
2005.
Approval Recommended:
Transportation and Public Works
Department
Robert Goode, P. E.
Director
ty o 'rt o
I / 1
NO M&C REQUIRED Marc Ott -
-- Assistant City Manager
ATTEST:
Marty Hendrix
City Secretary
Approv as to F RECEIVED
L
Assistant omey
v'
DEVF± R- a ant County Care, Ltd.
T����A
B y: . IV LR 2- L L�-
R' hjBr Griffin II, Manager
ATTEST:
CONTRACTiffin Construction Co.
By:
RicG iffi I, _ resident
Ari-Ifin ConstructionCo. : Corp. Sec.
TrailAddn-NewerCFA4%andUtilities071405futureimpexception.doc
SUMMARY OF
COST
Altamesa Trail Addition
Item Developer City Cost Total Cost
Cost
A. Construction $ -
1. Streets $2,159.60 2,159.60
2. Storm Drainage $8,691.00 8,691.00
3. Street Lights $ -
4. Street Name Signs $ -
B. Engineering Design $
C. Construction Engineering
and Management by DOE $ $
4% 434.02 434.02
TOTALS 11,284.62 $ - 11,284.62
Notes:
1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets.
2. Developer's column for Item C represents four percent (4%) cost for construction
inspection fees and materials testing. The City will pay additional inspection fee over
4%.
3. City not preparing plans and specifications.
TrailAddn-NewerCFA4%andUtiI ities07140-9kfutureimpexception.doe
COST ESTIMATE FOR STORM DRAINAGE IMPROVEMENTS
ITEM APPROK DESCRIPTION OF ITEMS WITH UNIT TOTAL
NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT
(Furnish and install, including all appurtenant work,complete in glace, the following
items
I. 151 L.F. 2I-inch RCP Per Linear Foot:
Forty_Dollars
And Zero Cents
$ 40.00 $ 6,040.00
2. 1 EA. 4-feet diameter Storm Drain Manhole:
Two Thousand Five Hundred Dollars
And Zero Cents
$ 2,500.00 $ 2,500.00
3. 151 L.F. Trench Safety
One Dollar
And Zero Cents
$ 1.00 $ 151.00
TOTAL AMOUNT BID $ 8,691.00
COST ESTIMATE FOR PAVEMENT IMPROVEMENTS
ITEM APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL
NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT
(Furnish and install, including all appurtenant work,complete in place,the following
items)
I. 11.4 L.F. Sidewalk
Fourteen Dollars
And Zero Cents
$ 14.00 $ 159.60
2. 1 EA. Pavement Repair
Two Thousand Dollars
And Zero Cents
$ 2000.00 $ 2000.00
TOTAL AMOUNT BID $ 2,159.60
TOTAL AMOUNT BID WATER $ 0.00
TOTAL AMOUNT BID SEWER $ 0.00
TOTAL AMOUNT BID STORM DRAIN $ 8,691.00
TOTAL AMOUNT BID PAVING IMPROVEMENTS $ 2,159.60
GRAND TOTAL AMOUNT BID $ 10,850.60
STORM SEWER LINE EXTENSION 'A
LOT 2, BLOCK 1
ALTAMESA TRAIL ADDITION op
GRANT ENGINEERING
PAGE 1 0 F 4
SCALE: 1 " = 40'
0 10 20 50 100
P
� Q
P � �
Q CONSTRUCT 4' WIDE
x 11 .4' SIDEWALK
v u�
CONSTRUCT CONST. 2-45' ELLS
151 ' OF 21 " STA. 11 +53.38
RCP
1� CONSTRUCT 4'
S-�A• SQUARE DROP
0p MANHOLE
xlRIM ELEV. = 845.00
FL ELEV. = 840.46
0o
\b�EXISTING 4'
SQUARE DROP 00
MANHOLE 25
J� FROM BACK OF CO
y� 21 CURB
ONS 2 P• 10��
C s T R A C T 1 D 4
2 . 727 ACRitlo
STORM SEWER FILE NO. W-238 00
U)
00
LOT 2 , BLOCK 502
W E 0 G W 0 0 D A D D I T 1 0 N 10' WIDE STRIP
INCLUDED IN LOT 2,
VOLUME 3 88 - 137 , PAGE 57 BLOCK 1, AETAMESA
TRAIL ADDITION
STORM SEWER LINE EXTENSION C
LOT 2, BLOCK 1
ALTAMESA TRAIL ADDITION
GRANT ENGINEERING
SCALE: 1" = 40' PAGE 1 OF 4 L-
0 10 20 50 100
P
'lox
P � �
- Q CONSTRUCT 4' WIDE
uo x 11 .4' SIDEWALK
�0�`S�i CONSTRUCT CONST. 2-45' ELLS
151 ' OF 21 " STA. 11+53.38
s1 CONSTRUCT 4
\ �3 RCP SSP SQUARE DROP
DD MANHOLE
RIM ELEV. = 845.00
FL ELEV. = 840.46
OD
EXISTING 4'
SQUARE DROP
MANHOLE 25'
r � FROM BACK OF co
2� 41 CURB
GO S\A 10 TRACT 1 D 4
-t 2 . 727 ACR
STORM SEWER FILE NO. W-238
>n
c
LOT 2 , BLOCK 502
WEDGWOOD A 0 D I T 1 0 N 10' WIDE STRIP
INCLUDED IN LOT 2,
V 0 L U Al E 3 8 8 - 1 3 7 , W A G E 5 7 BLOCK 1, ALTAMESA
TRAIL ADDITION