Loading...
HomeMy WebLinkAboutContract 32402 COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No Tarrant County Care, Ltd./Griffin Construction Co. WHEREAS, A , hereinafter called "Developer", desires to make certain improvements toALTAMe-51 TFA-(1--14d an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a municipal corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: 1. General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Contract as if copy herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder. B. The requirements of the Policy shall govern this Community Facilities Agreement, provided, however, that any conflict between the terms of this Community Facilities Agreement and the Policy shall be resolved in favor of this Agreement. C. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy. D. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy. E. The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. TrailAddn-NewerCFA4%andUtilities07140dfutureimpexception.doc F. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injurids or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damazes are caused, in whole or in part, by the alleged nealiQence of the City of Fort Worth, its officers, servants, or employees. G. Developer shall install or adjust all of the required utilities to serve the development or to construct the improvements required herein. H. In the event that City participation exceeds $25,000, Developer agrees that no street construction or storm drainage will begin prior to City Council approval of this Community Facilities Agreement. (Article 104.100, Ordinance 7234). I. Developer agrees that no lot shall be occupied under a certificate of occupancy until the improvements required herein have been constructed (Article 104.100, Ordinance 7234). This section shall not apply to the construction of future improvements. J. Developer hereby releases and agrees to indemnify and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this contract. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer required to construct current and future improvements provided for in this agreement. TrailAddn-NewerCFA4%andUtilities071404futureimpexception.doc L. Developer agrees to construct proposed improvements as shown on the exhibits attached hereto. The following exhibits are made a part hereof: Water (A)None; Sewer (A-1) None; Paving (B)Attached Storm Drain (B-1) Attached; Street Lights and Signs (C) Attached. M. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. II. Street and Storm Drain Facilities A. The Developer(s) agree to install or to cause to have installed, the street, storm drainage, street lighting, street name sign and other community facilities improvements shown as "current improvements" on the attached Exhibits B, B1, and C. B. As shown below in the "Summary of Cost for Street and Storm Drain Facilities", the Developer shall fund its share of "current improvements" and shall pay to the City for its share of the cost of street, storm drainage, street lighting, street name signs as shown on the attached Exhibits B, B 1, and C. The estimated total cost of current improvements and related support services specified in this agreement, including design, construction and inspection is estimated to $11,284.62. TrailAddn-NewerCFA4%andUtilities071405futureimpexception.doc IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and saidD velo Thas executed this instrument in triplicate, at Fort Worth,Texas this the�day of 2005. Approval Recommended: Transportation and Public Works Department Robert Goode, P. E. Director ty o 'rt o I / 1 NO M&C REQUIRED Marc Ott - -- Assistant City Manager ATTEST: Marty Hendrix City Secretary Approv as to F RECEIVED L Assistant omey v' DEVF± R- a ant County Care, Ltd. T����A B y: . IV LR 2- L L�- R' hjBr Griffin II, Manager ATTEST: CONTRACTiffin Construction Co. By: RicG iffi I, _ resident Ari-Ifin ConstructionCo. : Corp. Sec. TrailAddn-NewerCFA4%andUtilities071405futureimpexception.doc SUMMARY OF COST Altamesa Trail Addition Item Developer City Cost Total Cost Cost A. Construction $ - 1. Streets $2,159.60 2,159.60 2. Storm Drainage $8,691.00 8,691.00 3. Street Lights $ - 4. Street Name Signs $ - B. Engineering Design $ C. Construction Engineering and Management by DOE $ $ 4% 434.02 434.02 TOTALS 11,284.62 $ - 11,284.62 Notes: 1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets. 2. Developer's column for Item C represents four percent (4%) cost for construction inspection fees and materials testing. The City will pay additional inspection fee over 4%. 3. City not preparing plans and specifications. TrailAddn-NewerCFA4%andUtiI ities07140-9kfutureimpexception.doe COST ESTIMATE FOR STORM DRAINAGE IMPROVEMENTS ITEM APPROK DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT (Furnish and install, including all appurtenant work,complete in glace, the following items I. 151 L.F. 2I-inch RCP Per Linear Foot: Forty_Dollars And Zero Cents $ 40.00 $ 6,040.00 2. 1 EA. 4-feet diameter Storm Drain Manhole: Two Thousand Five Hundred Dollars And Zero Cents $ 2,500.00 $ 2,500.00 3. 151 L.F. Trench Safety One Dollar And Zero Cents $ 1.00 $ 151.00 TOTAL AMOUNT BID $ 8,691.00 COST ESTIMATE FOR PAVEMENT IMPROVEMENTS ITEM APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT (Furnish and install, including all appurtenant work,complete in place,the following items) I. 11.4 L.F. Sidewalk Fourteen Dollars And Zero Cents $ 14.00 $ 159.60 2. 1 EA. Pavement Repair Two Thousand Dollars And Zero Cents $ 2000.00 $ 2000.00 TOTAL AMOUNT BID $ 2,159.60 TOTAL AMOUNT BID WATER $ 0.00 TOTAL AMOUNT BID SEWER $ 0.00 TOTAL AMOUNT BID STORM DRAIN $ 8,691.00 TOTAL AMOUNT BID PAVING IMPROVEMENTS $ 2,159.60 GRAND TOTAL AMOUNT BID $ 10,850.60 STORM SEWER LINE EXTENSION 'A LOT 2, BLOCK 1 ALTAMESA TRAIL ADDITION op GRANT ENGINEERING PAGE 1 0 F 4 SCALE: 1 " = 40' 0 10 20 50 100 P � Q P � � Q CONSTRUCT 4' WIDE x 11 .4' SIDEWALK v u� CONSTRUCT CONST. 2-45' ELLS 151 ' OF 21 " STA. 11 +53.38 RCP 1� CONSTRUCT 4' S-�A• SQUARE DROP 0p MANHOLE xlRIM ELEV. = 845.00 FL ELEV. = 840.46 0o \b�EXISTING 4' SQUARE DROP 00 MANHOLE 25 J� FROM BACK OF CO y� 21 CURB ONS 2 P• 10�� C s T R A C T 1 D 4 2 . 727 ACRitlo STORM SEWER FILE NO. W-238 00 U) 00 LOT 2 , BLOCK 502 W E 0 G W 0 0 D A D D I T 1 0 N 10' WIDE STRIP INCLUDED IN LOT 2, VOLUME 3 88 - 137 , PAGE 57 BLOCK 1, AETAMESA TRAIL ADDITION STORM SEWER LINE EXTENSION C LOT 2, BLOCK 1 ALTAMESA TRAIL ADDITION GRANT ENGINEERING SCALE: 1" = 40' PAGE 1 OF 4 L- 0 10 20 50 100 P 'lox P � � - Q CONSTRUCT 4' WIDE uo x 11 .4' SIDEWALK �0�`S�i CONSTRUCT CONST. 2-45' ELLS 151 ' OF 21 " STA. 11+53.38 s1 CONSTRUCT 4 \ �3 RCP SSP SQUARE DROP DD MANHOLE RIM ELEV. = 845.00 FL ELEV. = 840.46 OD EXISTING 4' SQUARE DROP MANHOLE 25' r � FROM BACK OF co 2� 41 CURB GO S\A 10 TRACT 1 D 4 -t 2 . 727 ACR STORM SEWER FILE NO. W-238 >n c LOT 2 , BLOCK 502 WEDGWOOD A 0 D I T 1 0 N 10' WIDE STRIP INCLUDED IN LOT 2, V 0 L U Al E 3 8 8 - 1 3 7 , W A G E 5 7 BLOCK 1, ALTAMESA TRAIL ADDITION