HomeMy WebLinkAboutContract 32403 COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS,_Potomic Heights Development Corp., hereinafter called "Developer", desires to make certain improvements to Hunters Field addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a municipal corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: I. General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Contract as if copy herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder. B. The requirements of the Policy shall govern this Community Facilities Agreement, provided, however, that any conflict between the terms of this Community Facilities Agreement and the Policy shall be resolved in favor of this Agreement. C. Developer shall provide financial security in conformance with paragraph b, Section II, of the Policy. D. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy. E. The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. ,.�:, .. r. •:_tel-.?.. Hunters Field-Newer CFA 4% and Utilities 09 07 05 If F. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employee& G. Developer shall install or adjust all of the required utilities to serve the development or to construct the improvements required herein. H. In the event that City participation exceeds $25,000, Developer agrees that no street construction or storm drainage will begin prior to City Council approval of this Community Facilities Agreement. (Article 104.100, Ordinance 7234). I. Developer agrees that no lot shall be occupied under a certificate of occupancy until the improvements required herein have been constructed (Article 104.100, Ordinance 7234). J. Developer hereby releases and agrees to indemnify and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this contract. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer required to construct current and future improvements provided for in this agreement. Hunters Field-Newer CFA 4% and Utilities Q9 07 05 L. Developer agrees to construct proposed improvements as shown on the exhibits attached hereto. The following exhibits are made a part hereof. Water (A)None; Sewer (A-1) None; Paving (B)Attached Storm Drain (B-1) Attached; Street Lights and Signs (C) Attached. M. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. II. Street and Storm Drain Facilities A. The Developer(s) agree to install or to cause to have installed, the street, storm drainage, street lighting, street name sign and other community facilities improvements shown as "current improvements" on the attached Exhibits B, Bl, and C. B. As shown below in the "Summary of Cost for Street and Storm Drain Facilities", the Developer shall fund its share of "current improvements" and shall pay to the City for its share of the cost of street, storm drainage, street lighting, street name signs as shown on the attached Exhibits B, B1, and C. The estimated total cost of current improvements and related support services specified in this agreement, including design, construction and inspection is estimated to $641,441.75. Hunters Field-Newer CFA 4% and Utilities 09 07 05 SUMMARY OF COST Hunters Field Item Developer City Cost Total Cost Cost A. Construction $ - 1. Streets $411,468.30 411,468.30 2. Storm Drainage $168,668.00 168,668.00 3. Street Lights $37,400.00 37,400.00 4. Street Name Signs $700.00 700.00 B. Engineering Design $ C. Construction Engineering and Management by DOE $ $ (4%) 23,205.45 23,205.45 $ $ TOTALS 641,441.75 $ - 641,441.75 Notes: 1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets. The developer is responsible for installation of sidewalk and a separate financial guarantee is required in the form of a bond or check for the cost of the sidewalk. 2. Developer's column for Item C represents four percent (4%) cost for construction inspection fees and materials testing. The City will pay additional inspection fee over 4%. 3. City not preparing plans and specifications. Hunters Field-Newer CFA 4% and Utilities 49 07 05 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Develo .er has executed this instrument in triplicate, at Fort Worth, Texas this theQo—day of _ _, 2005. Approval Recommended: Transportation and Public Works Department Robert Goode, P. E. Director ity o Worth vx J NO M&C REQUIRE! Marc Ott Assistant City Manager ATTEST: f r \ , Marty Hendrix City Secretary Approv s to F t Assistant icy orney ATTEST: DEVELOPER Potomic Heights Develo rnent Corp. Co rate Se ary T. David Skinner, President Hunters Field-Newer CFA 4% and Utilities 69 07 05 PAY APPROXIMATE UNITS DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE BID SECTION C- STORM DRAIN 1. 66 L.F. 21"Class III R.C.P. Pipe, including trench excavation and backfill, complete in place for the sum of 'Corvy Dollars & f 1,7, G yo.40 /Cents per Linear Foot y�'oO $0.00 2. 200 L.F. 24"Class III R.C.P. Pipe, including trench excavation and backfill, complete in place for the sum of Fo't y-e':rA t Dollars & >96 as-oo Cents per Linear Foot dy8 00 $0.00 3. 143 L.F. 27" Class III R.C.P. Pipe, including trench excavation and backfill, complete in place for the sum of Ivo F,'Pi-y- Pive. Dollars& oo �7 X65.00 SSS. ' 'Cents per Linear Foot $0.00 4. 59 L.F. 30"Class III R.C.P. Pipe, including trench excavation and backfill, complete in place for the sum of No S%xfy- two Dollars & z ao Ir3, oo to /Cents per Linear Foot $0.00 5. 200 L.F. 3'X2' Box Pipe, including trench excavation and backfill, complete in place for the sum of One 17und,-,d ten Dollars & �2.2'000.a0 (Cents per Linear Foot $0.00 6. 474 L.F. 5'X3' Box Pipe, including trench excavation and backfill, complete in place for the sum of Dollars & f/81S. 47,, 6040.00 NO O 'Cents per Linear Foot $0.00 P-11 PAY APPROXIMATE UNITS DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE BID SECTION C- STORM DRAIN 7. 5 Ea. Standard 10' Curb Inlets with erosion control for the sum of 7-wo tAousa,,c/ Dollars & 8/0,000.op �2,Doo.o ,vo Cents per Each $0.00 8. 1 Ea. Standard 15' Curb Inlets with erosion control for the sum of Thee -&Ao"_fck Dollars & ��ppo.00 ,,.o Cents per Each �j000.00 $0.00 9. 1 Ea. Standard 4'x4' Manholes Complete in Place for the sum of TweAfy.eLYA-t Aanc/re Dollars & f2,80o.00 ,vo Cents per Each /Z Poo.0c $0.00 10. 1 Ea. Standard Type 6 Manhole Complete in Place for the sum of TArrt4—A.'ve Ac nclrej Dollars & t3soo.o 0 �o Cents per Each �`3Sao 00 $0.00 11. 1 Ea. Standard 4'x8' Manholes Complete in Place for the sum of Faur tA��sa„�/ Dollars & ,Ooo.00 ,+,o Cents per Each dy000.ao $0.00 12. 1 Ea. Standard 6'x8' Manholes Complete in Place for the sum of F:ye 'Ehousahc/ Dollars & 9 �s;000 .00 S,°ao.o0 yo Cents per Each $0.00 13. 1 Ea. Type II PSET-CD Headwall 24” R.C.P. Complete in Place for the sum of F. A'tee,� A�tnd/pc� Dollars & ,Soo.o0 A-10 Cents per Each aGSoo.o $0.00 14. 1 Ea. Type II PSET-SP Headwall 33" R.C.P. Complete in Place for the sum of E'4Ateerr Awtc6reo Dollars & x/800.00 0 Cents per Each ���DO'0 $0-00 P-12 - = 10 + � i PAY APPROXIMATE UNITS DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE BID SECTION C-STORM DRAIN 15. 605 L.F. Trench Safety System One, Dollars & t�pS.00 .vo Cents per Linear Foot ° $0.00 16. 10 C.Y. Washed Gravel for Pipe Bedding for the sum of On e Dollars & /O.00 Cents per Cubic Yard $0.00 17. 1 L.S. Storm Water Management for the sum of Dollars & �,2, 000.oa Mo ,7,eoo.a /Cents per Lump Sum $0.00 18. 1 L.S. Testing for the sum of One tAousa-.4 Dollars & poo.00 " �/,000.o lCents per Lump Sum $0.00 TOTAL SECTION C-STORM DRAIN /G� G�8.00 PAY APPROXIMATE UNIT DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE BID SECTION - E- PAVING 1. 17388 S.Y. 6" Lime Stabilized Subgrade (includes Preparation of Subgrade), complete in place for the sum of 6n e- Dollars & t X32,167 F0 £; Cents per S.Y. 8S 0.00 2. 261 Tons Lime for Subgrade (30#/S.Y.)" complete in place for the sum of 1-9.nv tv - e;gAi Dollarsf r.?S, S78•00 Cents per Ton 98 oa 1000 3. 16354 S.Y. 6" Reinforced Concrete Pavement (Includes Joint Sealer and 7" Standard Attached Concrete Curb) Measured Back to Back'Complete Twu, v Dollars '.20 �S -1339,3 YS.so Se✓enf - Cents per S-Y $0-0 P-13 PAY APPROXIMATE UNIT DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE BID SECTION - E- PAVING 4. 100 L.F.. 3" P.V.C. Conduit complete in place for the sum of Seven Dollars & f7oo.o0 N o Cents per L.F. 7-°° $0.00 5. 2 Ea. Pull Boxes complete in place for the sum of One h,,niced Dollars 6200.00 �/Oo-oo AID Cents per %o 00 6. 15 S.Y. 8" Rock on Filter Fabric Complete in Place E,afi6v Dollars X z0o•o0 Cents er S.Y. f8o•00 0.00 7. 29 L.F. Barricade for the sum of r&-tv- p;ve Dollars ii, 0/s. 00 NO Cents per L.F. f 357'00 $0.00 8. 29 L.F. Concrete Header for the sum of Forty Dollars f/ /60.00 14/0 Cents per S.F. 11/0-000.00 9. 316 S.F. Brick Pavers for the sum of %we/ve- Dollars 13, 79,1.0° Cents per S.F. r/Z'°° 0.00 5. 86 L.F. 4' Sidewalk for the sum of n Dollars 1/0-00 ° Cents per L.F. $0.00 10. 17 Ea. Adjust Manholes for the sum of One A 4 ,1,4 Dollars r/, 700.00 No Cents per Ea. /OO 0° 0.00 11. 15 Ea. Adjust Gate Valves for the sum of v Dollars 7So.00 1So-00 NoCents ppr Ea 12. 1 L. S. Storm Water Management for the sum of %hree thoccSantl Dollars Qeoo•oo NO 3 000.00 SUB-TOTAL STREET IMPROVEMENTS ` v6.?.30 P-14 City of Fort Worth requires a minimum of 30#/S.Y. The Paving Contractor will be responsible for a lime series test as directed by the City of Fort Worth Construction Inspection Department. SUMMAR Section A Water System Section B Sanitary Sewer System r Z(p(p 2!`/. 75 Section C Storm Drain System /G 8, 668400_ Section E Paving Y `f J / y,,l R. 30 Total Amount Bid / 035, 517- SSS Within ten (10) days after acceptance of this Proposal, the undersigned will execute the formal contract and will deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the faithful performance of the Contract. The attached bid security in the amount of 5% is to become the property of the City of Fort Worth, Texas, in the event the contract and bond or bonds are not executed and delivered within the time above set forth, as liquidated damages for the delay and additional work caused thereby. The undersigned bidder certified that he has been furnished at least one set of the General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, and that he has read and thoroughly understands all the requirements and conditions of those General Documents and the specific Contract Documents and appurtenant plans. The successful bidder shall be required to perform the work in accord with the following publications, both of which are incorporated herein and made a part hereof for all purposes: The General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, which may be purchased from the Water Department. The Standard Specifications for Street and Storm Drain Construction which may be purchased from the Department of Transportation & Public Works. The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors, or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as amended by City Ordinance No. 7400. P-15 The Bidder agrees to begin construction within calendar days after issue of the work order, and to complete the contract within working days after beginning construction as set forth in the written work order to be furnished by the Owner. (Complete A or B below, as applicable:) A. The principal place of business of our company is in the State of Nonresident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. Non resident bidders in the State of , our principal place of business, are not required to underbid resident bidders. C B. The principal place of business of our company or our parent company or majority owner is in the State of Texas. I (we) acknowledge receipt of the following addenda to the plans and specifications, all of the provisions and requirements of which have been taken into consideration on preparation of the foregoing bid: Addendum No. 1 (Initials) Addendum No. 3 (Initials) Addendum No. 2 (Initials) Addendum No. 4 (Initials) Respectfully submitted, Conatser ConsiriAcLr )n a,L.P. By: _.. ' i' Jerry Conatser,President of Title Conatser Management Group,Inc,G.P. Address /Do. sox /.S`V Ll8 Fort A. TX 76 9 Telephone: 9/7-3311-/7L/3 (Seal) Date: 1Y1 , 30, zoos P-16 I . STREET LIGHT COST ESTIMATE QUANTITY UNIT COST TOTAL COST INTERSECTIONS 4 EA $ 2, 000 $8, 000.00 MID-BLOCK RESIDENTIAL 7 EA $ 2, 000 $14, 000 . 00 CHANGE OF DIRECTION RESIDENTIAL 6 EA $ 2, 000 $12, 000 . 00 MID-BLOCK COLLECTOR 0 EA $ 2, 000 $0, 000 . 00 MID-BLOCK ARTERIAL PARKWAY 0 EA $ 2, 500 $0, 000. 00 MID-BLOCK ARTERIAL MEDIAN 0 EA $ 2, 500 $0, 000. 00 RELOCATE EXISTING LIGHT 0 EA $ 1, 500 $0, 000.00 Subtotal $34 ,000 .00 City' s Cost $00,000.00 Developer' s Subtotal $34 ,000.00 10% Contingency $3,400. 00 Project Total $37,400 . 00 Adjacent Developer' s Cost $00,000.00 Developer' s Cost $37,400. 00 2% Inspection Fee $00,000.00 CFA CODE #2005111 DEVELOPER' S COST: $37,400. 00 HUNTERS FIELD Fort Worth, Texas September 7, 2005 PAGE I OF Exhibit Com; r.t �f II . STREET LIGHTS WORK DESCRIPTION: 1 . The Developer shall provide for the installation of streetlights at the approximate locations shown in Exhibit "C", immediately after final acceptance of the street construction, in accordance with engineering plans and specifications approved by the Transportation and Public Works Department. 2 . Streetlights on residential and /or collector streets can be installed using overhead or underground conductors with the approval of the Director of Transportation and Public Works . 3. The City will install all the streetlights that use overhead or underground conductors on residential, and collector streets . The developer agrees to pay the city the amount shown below prior to the City starting its design efforts . 4 . Streetlights on arterial streets shall be installed with underground conduit and conductors. 5. The Developer agrees to dedicate all easements required for the installation and maintenance of the street lights and to provide for the installation of any electrical transformers required for the proper operation of the street lights 6. The estimated cost of this street light installation is detailed on page 1 of exhibit C and is summarized below, the street lights will remain the property of, and will be maintained by the City of Fort Worth. DEVELOPER' S COST: $37,400. 00 HUNTERS FIELD September 7, 2005 FORT WORTH, TEXAS CFA CODE #2005111 Page II of Exhibit C III "STREETLIGHTS" INTERSECTIONS RENDON CROWLEY RD & HUNTERS FIELD 1 HUNTERS CROSSING IN & HUNTERS FIELD 1 HUNTERS NOLL DR & HUNTERS VALLEY 1 HUNTERS VALLEY & HUNTERS CABIN 1 MID BLOCK HUNTERS CROSSING IN 2 HUNTERS KNOLL DR 2 HUNTERS MILL TRI, 2 HUNTERS CABIN CT 1 CHANGE OF DIRECTIONS HUNTERS CROSSING IN 2 HUNTERS KNOLL DR 1 HUNTERS CABIN CT 2 HUNTERS MILL TRL 1 HUNTERS FIELD Page III of Exhibit C IV STREET NAME SIGNS 1. The City of Fort Worth will install the street name signs upon final approval of the street construction. The street name signs will remain the property of, and will be maintained by, the City of Fort Worth. 2. The Developer will pay for the street name sign installations required for this development to the extent of $100.00 per intersection. This unit cost will be revised annually by the Department of Transportation and Public Works to reflect prevailing costs of materials and labor. 3. This development creates the following seven (7) intersections at a cost to the Developer of $700.00: E Rendon Crowley Rd & Hunters Field Hunters Crossing Lane & Hunters Field Hunters Crossing Lane & Hunters Knoll Dr (NW) Hunters Crossing Lane & Hunters Knoll Dr (SE) Hunters Knoll Dr & Hunters Valley Hunters Valley & Hunters Cabin Ct Hunters Cabin Ct & Hunters Mill Tr Hunters Field CFA code: 2005111 August 20, 2005 0 m z Z o 0 CROCKETT NICOLr WAY NE SON er O ek F n n A � O FARM TO MARKET #1187 0 0 z m z = A f/ D f~ r7 = O n x 2 p DOROTHY ITY p LIMIT U r5 JA KI N U ING LM ~ WHISPERING A S c a D m RED OAK HARD-GROVE LOCATION MAP HUNTER ' S FIELD v � I I I I HUNTERS z I I I I CROSSING x N I 1 rn �o I I I I o r M I I I I HUN ERS � KNO L i I I I U I I I HUN ERS x CABIN , Z z w M EEEI -� M r rn i FI I I I \ LIQ L— F F EXHIBIT "B" STREETS INC. HUNTERS FIELD M1N�Ipl le�e�700U-00]O rnoee 017/060-1000 No.017/060-t-%00 !.."inelloe.imee ecoffcmi—i � 1 "R i IrA I I I HUNT RS I x ' I I I CRO SING I ' s I I C I OFI I I 27 `I I I I II _ 1 I I I I HUN ERS KNO L I � HUN C A B NrA I � I I I I I I I r I r 6 k2" I fTl 1 1 I J I I Ll -LI T III I� I ., EXHIBIT "B-1" STORM DRAIN HUNTERS FIELD Ilpl la llbpyn M. binl$lo&IenOf 1000-0070 lone 01?/000-1000 f0.OV/000-?"a 1-0 meM10en-,weeifOCOmcosl.nel