HomeMy WebLinkAboutContract 32905 COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No., I P
� _Z1
WHEREAS, ALL-STORAGE CAMP BOWIE ASSOCIATES, LP.,
hereinafter called "Developer", desires to make certain improvements to ALL-
STORAGE CHAMBERLIN ARLIGNTON HEIGHTS ADDITION, an addition to
the City of Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and
the Developer do hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy")
dated March 2001, approved by the City Council of the City of Fort
Worth, is hereby incorporated into this Community Facilities Contract
as if copy herein verbatim. Developer agrees to comply with all
provisions of said Policy in the performance of its duties and
obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of
this Community Facilities Agreement and the Policy shall be resolved
in favor of this Agreement.
C. Developer shall provide financial security in conformance with
paragraph 6, Section II, of the Policy.
D. The Developer shall award all contracts for the construction of
community facilities in accordance with Section I1, paragraph 7 of the
Policy.
Chamberlin_Arlington_Heights_Addn[l.]._Newer_CFA_4_nd_Utilities_10_28_05
E. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the
Policy.
F. The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to
any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by
said Developer, his contractors, subcontractors, officers, agents or
employees, or in consequence of any failure to properly safeguard the
work, or on account of any act, intentional or otherwise, neglect or
misconduct of said DEVELOPER, his contractors, sub-contractors,
officers, agents or employees, whether or not such injuries, death or
damages are caused, in whole or in part, by the alleged negligence of
the City of Fort Worth, its officers, servants, or employees.
G. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
H. In the event that City participation exceeds $25,000, Developer agrees
that no street construction or storm drainage will begin prior to City
Council approval of this Community Facilities Agreement. (Article
104.100, Ordinance 7234).
1. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been
constructed (Article 104.100, Ordinance 7234).
J. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this contract.
K. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to
Chamberlin_Arlington_Heights_Addn[:I]._Ilwer CFA_4_nd_Utilities_10_28_05
L. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part
hereof. Water (A)None; Sewer (A-1) None; Paving (B)Attached
Storm Drain (B-1) Attached; Street Lights and Signs (C) Attached.
M. City shall not be responsible for any costs that may be incurred by
Developer in the relocation of any utilities that are or may be in
conflict with any of the community facilities to be installed hereunder.
II. Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibits B, B1, and C.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibits B, B1,
and C. The estimated total cost of current improvements and related
support services specified in this agreement, including design,
construction and inspection is estimated to $27,849.20.
Chamberlin Arlington Heights Addn.-Newer3CFA 4% and Utilities 10 28 05.doc _
SUMMARY OF
COST
Chamberlin Arlington Heights Addition
Item Developer City Cost Total Cost
Cost
A. Construction $
1. Streets $23,605.00 23,605.00
2. Storm Drainage $0.00 $ -
3. Street Lights $3,300.00 3,300.00
4. Street Name Signs $0.00 $
B. Engineering Design $
C. Construction Engineering
and Management by DOE $ $
4%) 944.20 944.20
TOTALS 27,849.20 $ - 27,849.20
Notes:
1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets.
The developer is responsible for installation of sidewalk and a separate financial
guarantee is required in the form of a bond or check for the cost of the sidewalk.
2. Developer's column for Item C represents four percent (4%) cost for construction
inspection fees and materials testing. The City will pay additional inspection fee over
4%.
3. City not preparing plans and specifications.
Chamberlin Arlington Heights Addn.-Newei4CFA 4% and Utilities 10 28 05.doc "-
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager,
attested by its City Secretary, with the corporate seal of the City affixed, and said Developer
has executed this instrument in triplicate, at Fort Worth, Texas this the FIRST day of
NOVEMBER, 2005.
Approval Recommended:
Transportation and Public Works
Department
Robert Goode, P. E.
Director
ity o ort o
9t ;
NO M&C IdLQUIRED Marc Ott
Assistant City Manager
ATTEST:
Marty Hendrix
City Secretary
Approved as to Form:,_— -; RECEIVED
Assista� ty Xttorney
ATTEST: DEVELOPER
AJA 419 By: s
Corporate Secretary Name:
Name:-ONC, All-Storage Camp Bowie Associates, L.P.
Its GP All-Storage Camp Bowie, Inc.
Chamberlin_Arlington_Heights_Addn[l]._N wer_CFA 4_nd_Utilities_10_28_05
UNIT IV: PAVING
APPROX. DESCRIPTION OF ITEMS WITH Bf]ILPURI
NIT TOTAL
ITME NO. UANTITY UNIT PRICES WRITTEN IN WORDSCE AMOUNT
(Furnish & install, including all appurtenant work,complete in place, the following items)
8" Reinforce Concrete Pavement,complete and
in place. TWENTY SEVEN DOLLARS AND
1 70 11 S.Y. JIZERO CENTS $27.00 $1,890.00
6" Lime Stabilized Subgrade, complete and in
place. TWO DOLLARS AND TWENTY-
2 70 1 S.Y. IFIVE CENTS $2.25 $157.50
6" Concrete curb& 18" gutter,complete and in
place. SEVEN DOLLARS AND FIFTY
3 1 185 L.F. ICENTS $7.50 1 $1,387.50
4' Sidewalk,complete and in place.
4 915 L.F. FOURTEEN DOLLARS AND ZERO CENTS $14.00 $12,810.00
Type I Sidewalk Ramp,complete and in place.
THREE HUNDRED FIFTY DOLLARS AND
5 4 EA. ZERO CENTS $350.00 $1,400.00
Sawcut and pavement removal. TEN
6 560 S.F. DOLLARS AND ZERO CENTS $10.00 $5,600.00
8" HMAC Pavement(3" Type "D" Surface on
5" Type "B" Surface),complete and in place.
7 12 S.Y. THIRTY DOLLARS AND ZERO CENTS $30.00 $360.00
TOTAL AMOUNT BID PAVING: $23,605.00
r
WA4035 All-Storage Chamberlin Arlington Heights Addition
UNIT III: STORM DRAINAGE
APPROX. DESCRIPTION OF ITEMS WITH BID UNIT TOTAL
ITEM NO. UANTITY UMT PRICES WRITTEN IN WORDSI PRICE AMOUNT
(Furnish & install, including all appurtenant work,complete in place,the following items)
TOTAL AMOUNT BID STORM DRAINAGE: $0.00
WA4035 All-Storage Chamberlin Arlington Heights Addition
I. STREET LIGHT COST ESTIMATE
QUANTITY UNIT COST TOTAL COST
INTERSECTIONS 0 EA $ 2, 000 $0, 000 . 00
MID-BLOCK RESIDENTIAL 0 EA $ 2, 000 $0, 000 . 00
CHANGE OF DIRECTION RESIDENTIAL 0 EA $ 2, 000 $0, 000 . 00
MID-BLOCK COLLECTOR 0 EA $ 2, 000 $0, 000. 00
MID-BLOCK ARTERIAL PARKWAY 0 EA $ 2, 500 $0, 000 . 00
MID-BLOCK ARTERIAL MEDIAN 0 EA $ 2, 500 $0, 000 . 00
RELOCATE EXISTING LIGHT 2 EA $ 1, 500 $3, 000 .00
Subtotal $3,000 . 00
City' s Cost $00,000 .00
Developer' s Subtotal $3,000. 00
10% Contingency $300 . 00
Project Total $3,300 .00
Adjacent Developer' s Cost $00 ,000 . 00
Developer' s Cost $3,300 . 00
2% Inspection Fee $00 ,000 .00
CFA CODE #2005135
DEVELOPER' S COST: $3,300 . 00
CHAMBERLIN ARLINGTON HEIGHTS ADDITION
October 17, 2005
Fort Worth, Texas
November 28, 2005
PAGE I OF Exhibit C
II . STREET LIGHTS WORK DESCRIPTION:
1. The Developer shall provide for the installation of streetlights at the
approximate locations shown in Exhibit "C", immediately after final
acceptance of the street construction, in accordance with engineering plans
and specifications approved by the Transportation and Public Works
Department.
2 . Streetlights on residential and /or collector streets can be installed
using overhead or underground conductors with the approval of the Director
of Transportation and Public Works.
3. The City will install all the streetlights that use overhead or underground
conductors on residential, and collector streets. The developer agrees to
pay the city the amount shown below prior to the City starting its design
efforts.
4 . Streetlights on arterial streets shall be installed with underground
conduit and conductors.
5. The Developer agrees to dedicate all easements required for the
installation and maintenance of the street lights and to provide for the
installation of any electrical transformers required for the proper
operation of the street lights
6. The estimated cost of this street light installation is detailed on page 1
of exhibit C and is summarized below, the street lights will remain the
property of, and will be maintained by the City of Fort Worth.
DEVELOPER' S COST: $3,300 .00
CHAMBERLIN ARLINGTON HEIGHTS ADDITION
October 17, 2005
FORT WORTH, TEXAS
CFA CODE #2005135
Page II of Exhibit C
III
"STREETLIGHTS"
RELOCATE TWO STREET LIGHTS ON LOVELL 2
CHAMBERLIN ARLINGTON HEIGHTS ADDITION
Page III of Exhibit C
- - �
WEST FREEWAY IH 30
LOCKE
0
z LOVELL
~ O
m 0°
SITE�,P w
w Z
af 0
0
O
VICINITY MAP
NOT TO SCALE
I ❑7. _ _
(/i Z
N
=�Y in
I— l n U = N
y ! ~_Z p~p r.
W_j pq W o
r ^ Q'�L7= N o
H I I LD m M N
W ZJN.I Z f ii v
' I__L_ _j a' I Z W ' v
Z I Cu U <�Z(� W 3
QQ¢JQ A w �
-U 1 J
\L -i Q u z
a J A y W
LLJW M p a J
W
cL
9") =U
LD ~� UprWU X
IT JLLI
o
I—I OU
Yall OD}
U 00 y
pM-(-U pp 0�
J -1-o Z
Pq� 2J p U N
M p00LDPQ U Z Oj 00
-100 W U '-' PQ 00 I
(') M=�D Q Z L7 M
.� (U a Q z W OD
DNpZpN (-� . H I lZ
ft- LD �¢ > H PQ -
O X
L7= H Ind
I n M L Z a _ l�
F- �D�QN� d-
LL_
OJ p p li �J WO CN1 r Q
W �I M J>~Zp> N3 3 J W
I I I ( � l J JJ00
(� p Z�LLI Lj Z a a H p ~ tQ
l l�i \ J 4 LJ (�p W C] p W Cu
U U Q J DI:
� r�
/� ( ' I Q L.(/)=J li p L. �r CT
\L � � E W L7I-2UQ Wp � ..
Z(�0 (� Qr W � N
El —1 —1 LLJ' lq-zQ H W
(�� �y� PCI W�-,W Z F- Z w O
U I I -I --'-� l�_ Q l� U s
a
Z
p In
0
N
W \
a d'
77
1i1��HLNON 8 ts4 no.g a^ Z
s• o
p 3
` Y
PiE
Ki��3aa y 3 aQ I F .25 •-'
13 90
zea Y E z s �s �
� 4 f k'g o����1 m 'q<' G
nmFn �••� w,�uw,R.,'�Ww.'�.. a i n Oil
=
mCJS? 3 ��tiao o G
LZ 101 ^^_ o z I
�WQ a
F+•1�q g ^ O O9'� U
O§^ N '�,� �• U Fin n - g i rz,ri ZZ
11Lw V ¢
3 _ z a
N E 4 W S' I RAIM
� a N
w ,n0 5
��
I J=mO
I
M .""91AO N f
' � NM ko �I o 'anb mane D9)
� � I° •ZS NO2i�3
rr
4R Q
goo 00
00
to
ep+Z Yu I r -o=
-Mwou-me 2t 0=1
oagu
b ry IWW++l VIS �G 'J'
ad l I Fg o°
•• ��i�W o Om o- vai ; I � w ZD •7Q� � ��N�
o;
G Q lD
•• � cO N I LYSOL-w Q Z r <
K
0_ Iri
29'K W YLS Z U U
" I. ,f S,v9Z - 3 •,Iv,GL.00 S
C,
0i�nm
Y¢^� F€<
o 0: U
00,569-4LL ft
\• 00+0 YLS
• ' •\ Olt