Contract 29706-A4
• AMENDMENT NO. 4 STATE OF TEXAS S CITY SECRETARY CONTRACT NO.� -A4 (MSC Required) COUN'T'Y OF TARRANT S WHEREAS, the City of Fort Worth (City) and Kimley-Horn and Associates, Inc. , (Engineer) made and entered into City Secretary Contract No. 29706, (the Contract) which was authorized by the City Council by M&C C-20000 on the 23th day of March 2004 and subsequently revised by three previous amendments ; and WHEREAS, the Contract involves engineering services for the following project: Sanitary Sewer Rehabilitation Contract LXX (70) . WHEREAS, it has become necessary to execute Amendment No. 4 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1 . Article I , of the Contract is amended to include the additional engineering services specified in M&C C-23279, adopted by the City Council on the 13th day of January 2009, and further amplified in a proposal letter dated October 22, 2008, copies of which are both attached hereto and incorporated herein. The cost to City for the additional services to be performed. by Engineer total $117,742 .00. 2 . Article II, of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the gum of $695,017 .00. OFF.-AL RECORD Cl' .":i,;^;a 7ARY F -;,Y;•. 01 -27-09 P03 : 1 2 IN � ORIGINAL 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the�At—' day of 2009, in Fort Worth, Tarrant County, Texas . ATTEST: ; z&tio'a Marty Hen ix Cor.tr y ci puth.or City Secretary r;3rw: APPR AL RECOMMENDED: APPROVED: S. Frank Crumb, P.E . Fernando Costa Director, Water Department Assistant City Manager KIMLEY-HORN AND ASSOCIATES, INC. Engineer By: C Name:Glenn A. Gary, P.E . Sr. Vice President 801 Cherry Street, Suite 1025 Fort Worth, TX 76102 APPROVED TO FO AND ITY: Assistant t Attorney LOFA-.. , n f:,ORD -2- CC�; F _, �,s ut&(L tceview COUNCIL ACTION: Approved on 1/13/2009 -Ord. No. 18447-01-2009 DATE: 1/13/2009 REFERENCE NO.: C-23279 LOG NAME: 60AMEND470KH CODE: C TYPE NOW PUBLIC CONSENT HEARING: NO SUBJECT: Authorize Amendment No. 4 in the Amount of$117,742.00 to City Secretary Contract No. 29706 with Kimley-Horn and Associates, Inc., for Sanitary Sewer Rehabilitation Contract LXX on Tulsa Way, Williamsburg Lane, Monticello Drive and Potomac Avenue and Adopt Appropriation Ordinance RECOMMENDATION: It is recommended that the City Council: 1. Authorize the transfer of$125,742.00 from the Water and Sewer Operating Fund to the Water Capital Projects Fund in the amount of $92,410.00 and Sewer Capital Projects Fund in the amount of $33,332.00; 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water Capital Projects Fund in the amount of$92,410.00 and the Sewer Capital Projects Fund in the amount of$33,332.00, from available funds; and 3. Authorize the City Manager to execute Amendment No. 4 in the amount of$117,742.00 to City Secretary Contract No. 29706 with Kimley-Horn and Associates, Inc., for additional engineering services thereby increasing the contract amount to $695,017.00. DISCUSSION: On March 23, 2004, (M&C C-20000) the City Council authorized the City Manager to execute an Engineering Agreement (Agreement), with Kimley-Hom and Associates, Inc., in the amount of $408,450.00 for the design of Sanitary Sewer Rehabilitation Contract LXX (70). The agreement was subsequently revised by three amendments totaling $168,825.00 as follows: . Amendment No. 1 (M&C C-20334, October 12, 2004) in the amount of $62,629.50, provided for the necessary design to relocate an existing 30 inch sanitary sewer main to accommodate proposed rail line extension by Union Pacific Railroad at its Centennial rail yard facility as well as the rehabilitation of a sewer main located immediately downstream of the 30 inch sewer main; . Amendment No. 2 (M&C C-20486, January 1, 2005) in the amount of $39,935.50, provided for the necessary design to replace a severely deteriorated segment of sanitary sewer M- 199R* located underneath the runway of the Naval Air Force Station (NAS) Fort Worth Joint Reserve Base; . Amendment No. 3 (M&C C-21208. December 20, 2005) in the amount of $66,260.00 required the resurvey and redesign of sanitary sewer improvements that were proposed within the Union Pacific Railroad Yard due to significant changes in topography by the railroad company. Amendment No. 4 will provide for the following: . The relocation of sewer lateral L-2333 from private property between Tulsa Way and Camp Bowie Boulevard at the intersection with Montgomery Boulevard to public right-of-way on http://apps.cfwnet.org/cauncil_packet/mc review.asp?ID=10795&counciIdate=1/]3/2009 1/14/2009 M&C Review Tulsa Way; . The replacement of the severely deteriorated water mains on Monticello Drive (River Crest Drive to Hamilton Avenue), Potomac Avenue (Virginia Place and West 4th Street) and Williamsburg Lane (Bristol Road to Bailey Avenue); • Additional traffic control design on the project; and . Additional design survey and easement preparation on the project. Kimley-Horn and Associates, Inc., proposes to perform the necessary additional design work for a lump sum fee of$117,742.00. City staff considers this fee to be fair and reasonable for the scope of services proposed. In addition to the contract amount $8,000.00 (water: $5,000.00 and sewer: $3,000.00) is required for utility coordination and real property acquisition. M/WBE: Kimley-Horn and Associates, Inc., is in compliance with the City's M/WBE Ordinance by committing to 38 percent M/WBE participation for this Amendment No. 4. The City's goal on this amendment is 20 percent. This project is located in COUNCIL DISTRICT 7. FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that upon approval and completion of the above recommendations and the adoption of the attached appropriation ordinance, funds will be available in the current capital budget, as appropriated, of the Water and Sewer Capital Projects Funds. TO Fund/Account/Centers FROM Fund/Account/Centers 1&2)P253 476045 60717017OZZ $92,410.00 3)P258 531200 707170117051 $8,400.00 1 V21 3)P258 531200 707170117033 $5,483.00 P258 476045 7071701170ZZ �33�332.00 3)P258 531200. 707170117032 $16 449.00 Z)P253 531200 607170117032 $41_,_183.00 3)P253 531200 607170117051 $32,500.00 2)P253 531200 607170117033 $13.727.00 3)P253 531200 607170117033 $13.727.00 2)P253 541_100 607170117041_ 522 000.00 3)P253 531200 607170117032 $41,183.00 2)P253 531350.607170117042 $2,000.00 1 PE45 538040 0709020 $33,332.00 2)P253 531200 607170117051 $32,500.00 1)PE45 538040 0607020 $92,410.00 2)P253 531350 607170117073 $1,000.00 2)258 531200 7071.70117032 $16,449.00 449.00 2IP258 531200 707170117033 $5_483.00 2)P258 541100 707170117041 1 000.00 2IP258 531350 70.7070117042 $1,000.00 2)P258 531200 707170117051 $8,400.00 2)_P258_531350 7.071 701 1 7073 $1,000.00 Submitted for City Manager's Office by: Fernando Costa (6122) Originating Department Head_ S. Frank Crumb (8207) Additional Information Contact: Liam Conlon (6824) http://apps.cfwnet.org/counciI_packet/mc_revi ew.asp?ID=10795&counci 1 date=1/13/2009 1/14/2009 M&C; Review ATTACHMENTS 60AMEND470KH MAP.pdf 60AMEND470KHord..doc http://apps.cfwnet.org/council_packet/mc_review.asp?ID=10795&councildate=l/13/2009 1/14/2009 Kimley-Horn C and Associates, Inc. ■ October 22, 2008 Suite 950 801 Cherry Street,Unit 11 Fort Mr. Liam Conlon 76102 Worth,Texas 76102 Project Engineer City of Fort Worth Department of Engineering 1000 Throckmorton St. Fort Worth,TX 76102 Re: City of Fort Worth-Sanitary Sewer Rehabilitation Contract LXX (70) Additional Services— Sewer and Water Line Design—Amendment No. 4 KHA No. 061018025 City Project No. 00439 Dear Liam: Future development in the area bounded by Camp Bowie Blvd., Tulsa Way St., Watonga St. and Montgomery St. will be affecting the existing sanitary sewer in this area. Parts of the Tulsa Way Townhomes and Camp Bowie Office Building are to be constructed on top of the 6-inch sanitary sewer L-2333. The City of Fort Worth (City) has instructed Kimley-Horn to perform design services to relocate L-2333, abandon the existing L-2333 that will be under the proposed facilities, and provide new service laterals for the affected facilities as shown in Alignment Exhibit E1. In addition, the City has informed Kimley-Horn of several water line breaks that have been reported. These line breaks include the 8-inch water line located along Monticello Dr. between River Crest Dr. and Hamilton Ave., the 6/8-inch water lines located along Potomac Ave. between Virginia Pl. and West 4`h St., and the 6-inch water line located along Williamsburg Ln. between Bristol Rd. and Bailey Ave (See Alignment Exhibit 2). The City has instructed Kimley-Horn to perform design services to replace these water lines and re-connect affected services. Starting in April of this year, the City requested we begin providing a monthly progress report and attend a monthly progress meeting as part of the City's ongoing Sanitary Sewer Overflow (SSO) program, initiated by TCEQ for this project. The City has requested Kimley-Horn to prepare the work described above as part of the Sanitary Sewer Rehabilitation Contract LXX (70). We, therefore, respectfully request an amendment to our contract to provide services related to resolving these issues as outlined in the following items: ■ TEL 817 335 6511 FAX 817 335 5070 ❑�❑ Kimley-Horn and Associates, Inc. Mr. Liam Conlon,October 22,2008,Page 2 Summary of Services Item 1 (Relocation of 6-inch Sanitary Sewer L-2333) • Routing and alignment for two line segments totaling approximately 600 linear feet(LF)of Sanitary Sewer L-2333. • Survey, Level B SUE for sewer service locates, easement preparation, field investigations, and preliminary design for the proposed sanitary sewer improvements as shown in Alignment Exhibit E1. • Final Design services for the proposed sanitary sewer improvements. • Traffic Control. Item 2 (Replacement of 6/8-inch Water Lines on Monticello,Potomac,and Williamsburg) • Routing and alignment for the following water line improvements: o Monticello—Approximately 3,750 LF o Potomac—Approximately 2,000 LF o Williamsburg—Approximately 1,050 LF • Survey, field investigations, and preliminary design for the proposed water line improvements as shown in Alignment Exhibit E2. • Final Design services for the proposed water line improvements. • Traffic Control. Item 3 (Additional Traffic Control design for L-1884, L-7251, and L-3602 to be included in the Part 4 Bidding Package) • Additional Traffic Control plans will be included in the Part 4 bidding package that were not included as part of the original scope of work. Item 4(Additional Reproduction and Construction Phase Services to be included in the Part 4 Bidding Package) • Reproduction costs associated with the additional footage of sanitary sewer and water line that will be included in the Part 4 bidding package. Item 5 (Monthly Project Status Meetings) • Preparing for and attending monthly project status meetings as instructed by the City of Fort Worth. ❑�� Kimley-Horn and Associates, Inc. Mr. Liam Conlon,October 22,2008,Page 3 Detailed Scope of Services and Associated Fees The scope of services associated with each item is as follows: Item I (Relocation of 6"Sanitary Sewer L-2333): $8,300 Kimley-Horn $1,000 Kimley-Horn (Traffic Control) $8,400 Survey and Easements $ 840 10% Subconsultant fee $18,540 Total (Water$0, Sewer $18,540) • Task 1 -Routing and alignment based on the lines identified in Alignment Exhibit El for the proposed sanitary sewer improvements. $3,500 o Collect data of record drawings of City and franchise utilities located near the proposed alignment. o Review data and compare to field observations. o Prepare an exhibit containing existing conditions and showing the recommended alignment of the sanitary sewer and easement on an aerial map and City block map. • Task 2 - Survey, Level B SUE for sewer service locates, and easement preparation and for the proposed sanitary sewer improvements as shown on Alignment Exhibit E1. $8,400 o Survey along proposed alignment will include: ■ Establish horizontal and vertical control for the project area. ■ Property Ownership Research ■ Topographic Survey of approximately 600 LF along the proposed sanitary sewer route. o Prepare easement documents for the section of line that will be located along private property (1 permanent, 1 temporary). • Task 3 - Prepare a preliminary design for the proposed 8-inch sanitary sewer. The preliminary design will include an opinion of probable construction cost and schedule for bidding, award and construction of approximately 600 LF of improvements. $2,500 • Task 4 - Final design services for the proposed sanitary sewer improvements. $2,300 o After City approval of the preliminary design described in Task 2, Kimley-Horn will prepare final design for approximately 600 LF of relocation of 8-inch sanitary sewer. Final plans and specifications will be prepared in accordance with the current scope of services. ❑�❑ KimleyHorn and Associates, Inc. Mr. Liam Conlon,October 22,2008,Page 4 • Task 5—Traffic Control Plan. $1,000 o As part of the final design services we will include traffic control plan detail sheet along Tulsa Way. Item 2 (Replacement of 6/8-inch Water Lines on Monticello, Potomac, and Williamsburg): $43,400 Kimley-Horn $2,400 Kimley-Horn (Traffic Control) $32,500 Survey and Easements $ 3,250 10% Subconsultant fee $81,550 Total (Water$81,550, Sewer $0) • Task 1 — Survey and field investigations for the proposed water line improvements as shown on Alignment Exhibit E2. $35,750 o Survey along proposed alignment will include: ■ Establish horizontal and vertical control for the project area. ■ Property Ownership Research ■ Topographic Survey of approximately 6,800 LF along proposed water line route. • Task 2 - Prepare a preliminary design for approximately 6,800 LF of proposed 8-inch water line relocations. The preliminary design will include an opinion. of probable construction cost and schedule for bidding, award and construction of the improvements. $24,900 • Task 3 —Final design services for the proposed water line improvements as instructed by the City of Fort Worth. $18,500 o After City approval of the preliminary design described in Task 3, Kimley-Horn will prepare final design for approximately 6,800 LF of relocation of 8-inch water line. Final plans and specifications will be prepared in accordance with the current scope of services. • Task 4—Traffic Control Plan. $2,400 o As part of the final design services we will include a traffic control plan sheets for a lane closures along Monticello, Potomac, and Williamsburg. We will also include traffic control plan sheets for typical intersection crossings that would be required for the following intersections: ■ Monticello and Virginia ■ Monticello and Dorothy ■ Monticello and Lenox ■ Monticello and Bristol ■ Monticello and Hamilton Kimley-Horn and Associates, Inc. Mr. Liam Conlon,October 22,2008,Page 5 ■ Potomac and Virginia ■ Potomac and Dorothy ■ Potomac and Lenox ■ Potomac and W. 4"' ■ Williamsburg and Bristol ■ Williamsburg and Lenox ■ Williamsburg and Bailey Item 3 (Additional Traffic Control design for L-1884, L-7251, and L- 3602 to be included in the Part 4 Bidding Package) $9,000 Kimley-Horn (Traffic Control) (Water $0, Sewer $9,000) • Task 1 -Additional Traffic Control plans are required for the following locations: o L-1884—University Drive- Detail sheets will be required along University Drive between Hamilton and W. 4`'' Street. o L-7251 —Montgomery St— Detail sheets will be required along Montgomery St between Collinwood and Linden. o L-3602—Hulen St—A detail sheet will be required for the intersection of Hulen and Houghton. Item 4 (Additional Reproduction and Construction Phase Services to be included into the Part 4 Bidding Package) $3,320 Reproduction Expenses $ 332 10% Subconsultant Fee $3,652 Total (Water $3,360, Sewer $292) • Task 1 -Reproduction costs associated with the additional footage of sanitary sewer and water line that will be included in the Part 4 bidding package. $3,320 o The City has instructed Kimley-Horn to include the additional water plan sheets, water details, and sanitary sewer plan and profile sheets to the Part 4 Bidding Package. Item 5 (Monthly Project Status Meetings): $5,000 Kimley-Horn (Water $2,500, Sewer $2,500) • Task 1 —Preparing for and attending fourteen (14) monthly project status meetings from April 2008 to May 2009 as required by the City. Kimley-Horn and Associates, Inc. Mr. Liam Conlon,October 22,2008,Page 6 We recommend that the City increase the budget by $117,742 for these additional services. From the additional services listed above, the recommended breakdown for water and sewer services is as follows: Description Water Sewer Total Item 1 (Relocation of 6-inch Sanitary $ 0 $18,540 $18,540 Sewer L-2333 _ Item 2 (Replacement of 6/8-inch Water Lines on Monticello, Potomac, and $81,550 $ 0 $81,550 Williamsbur Item 3 (Additional Traffic Control design for L-1884, L-7251,and L- 3602 $0 $9,000 $9,000 to be included in the Part 4 Bidding Package) _ Item 4 (Additional Reproduction and Construction Phase Services to be $3,360 $292 $3,652 included into the Part 4 Bidding Package) Item 5 (Monthly Project Status $2,500 $2,500 $57000 Meetings _ Total $87,410 $30,332 $117,742 The following table summarizes the Fee per Work Phase breakdown: Work Phase Water Sewer Total 32 $41,183 $16,449 $57,632 33 $13,727 $5,483 $19,210 51 $32,500 $8,400 $40,900 Total F$87,410 $30,332 $117,742 The following table summarizes our recommended budget revisions by Item (please see attached Fee Breakdown for an hourly breakdown of each item): Description Item 1 Item 2 Item 3 Item 4 Item 5 Total Preliminary Construction $15,240 $60,650 $0 $ 0 $5,000 $80,890 Plans Final Construction Plans $3,300 $20,900 $ 9,000 $ 0 $ 0 $33,200 Pre-Construction Services $ 0 $0 $0 $3,652 $ 0 $3,652 Construction Phase $ 0 $ 0 $0 $0 $ 0 $ 0 Services Total $18,540 $81,550 $9,000 $3,652 $5,000 1 $117,742 �© Kimley-Horn and Associates, Inc. Mr. Liam Conlon,October 22,2008,Page 7 The following table summarizes our recommended budget revisions and shows the revised contract amount: Description Original Amend Amend. Amend. Amend. Revised Fee No. I No. 2 No. 3 No. 4 Contract Conceptual Engineering $ 142,959 $21,920.33 $ 0 $ 0 $ 0 $164,879.33 Preliminary Construction $ 125,358 $18,788.85 $13,700 $51,060 $80,890 $289,796.85 Plans _ Final Construction Plans $ 125,358 $18,788.85 $21,435.50 $11,3_00 $33,200 $210,082.35 Pre-Construction Services $1,750 $1,878.88 $3,600 $650 $3,652 $ 11,530.88 Construction Phase $13,025 $1,252.59 $1,200 $3,250 $ 0 $ 18,727.59 Services Total Project $408,450 1 $62,629.50 $39,935.50 $66,260 $117,742 $695,017.00 Kimley-Horn will subcontract a portion of these services to Gorrondona and Associates, Inc, an NVWBE sub-consultant. The amount we will be subcontracting is $44,220. This represents an M/WBE participation percentage of 38% for these additional services. With these Additional Services, our revised contract amount will be $695,017. This will revise our total contract M/WBE participation from $146,030 (25.3%) to 190,250 (27.3%). We appreciate the opportunity to be of continued service to the City. Please contact us if we need to provide any further information. Very truly yours, KIMLEY-HORN AND ASSOCIATES, INC. Glenn A. Gary, P.E. Sr. Vice President JRA/jra Attachments: (1) P'\061018.025\ppp\Amend-4\New_Amcnd_4\Scope_Fee_Amend 4—v7 doc O O O O O O O O O O O F LL H fT N N �- m h f m CV r w m LL OO O N � M v v 1A N M VOf N M M N N N w N w 0 N m m 8 Q m m m ry N N w w N Wu N w w N w N Cm � m o o 0 0 o S o � g oo ^� C)i mo v � oo N '. Po � tag mm na r7 w w N w Nw W mw w ry ry rA Nw a��} A w w w q J O J K0 0 0 o $ g o Q Q to m O p N N N N O O O w m 10 Q V O N 1�1 m N r N N w N N W w w ^N o V o oo to �c r0 c e �i ,o o ,n o m ory N O y a w e7 C me w w w a w w w w = 3 'O o z LL o 0 0 Z� �D tD O w V V V V N N N 0 b O O h O V N v V N N w c 0 � �"� 2•d f w w w w O O toil � a W n Q7 LL N Z V V o O p N ry O O p m O O M n t7 H 1")N O O N tD O 1D Il w N w ^w N N h ` Q N V O O N D7 7 N C 3 a 4 0 owOh oN ow - o oow oM ow ow oM ow CD +S 70 C C N 0D O O to m a LL n r� —_ N O m EO E m � _ a m m 3 c v n o m m o H C Q O C O o a J C m a � W Nm m W 9 mO N m a Wn 2 m m n m 0 m c y `o m w a c m s n m L w a c A A J m A o - c f O o m2 >w o =_ m A c J N m A Q N ; o m O C A Q m 3 O q q c ._ m q tea o c - m m V a o c c m m E m vIN O L u J a LL y 9 V Ivr N E C N' H O 0 o m o E o o u o n A o E o _o u o W fn F tJ N f fn to F Q 41 F 1.1 N F H N ~ N> F LL V1 f(1 to F LL N F 1- N ~ Y � h E E a m m f O O N N O O Y A m O O N b O O O O r m �D ID HLL A W n n U1 vi N N N M y y r N m LL fA H W M p p N O M N N Y e N O N m O O O O O O CN'1 M M O O N m N N y y M M M X N N N p W N L m DO O LL 0 0O g 0 O S V O 7 0 0 0 0 0 O O yy O N O �O aD m� N N M M N L A N N N N N A J J ,Q Q Y O 0 N O p 0 '0 O O a o� o o0 oC> o0 o� rtOim LLit a n Y v N N o 7 O I Jh O O O W a o 0,4, 00 0 0 0 �oo0 o � O = Y - c Z n N N 0 w UJ ¢ 8 R Q O O p O p O O p O p N H l0 N 4 am 10 o0 oN ow o N ow o0 0 0 N A L n m O _ � a N m J Z^ 1 CO+ m � Y 1 V m J V^ O 7 A J o a T 0 4 N Um �O L � P O m O H H L a Y v 3 o gE 12 Q o c C U _ n c U a r v o m.. . o Q t a oCL g a O o O r O O y H v Cm V c V p p O C N Q O a A m a W a u w v O W f v O W N n S H N ~ Y C r a l0 ~ u1 a N ~ H Y _ _ V) E E E a m m m Contract 70 Water Project No. PW53-W530177820 FO R T WO RT H Sewer Project No. PS58-070580176210 D.O.E No. 4315 KHA W. 061018025 Lertend Exsntic sAw1ARY 5L w[P ALIGNMENT EXHIBIT — E1 PROPOSED SAWARV SEWER R(PEACE./EN7 L-2333 EM" Kiml Horn we' 2036-3922036-39292 1• and Associates,Inc. Mapsco 75 an o...r as••,oeOR wew n moa tooarasn Couid Nffict 7 u 900 4«0 0 — LJ Y Ln V) 6+8 L-888'ACu ' z �\ 3+65", d'd� 0 AVE. + �9�'�0 (0 813 _ ---- 8 6x 10+65 6" A ' LC-5077'A ' +50E 6" 6+96E 1 2k��� 6+OOE 0 91 0 =Co 33 o / z fLG -J 0 cDO 16A f O Rip +� , 6', `L� U 6hk J '2434 to o A7 t + + g / � P ry — r4 N EV EV k, 3+038K= /7 AT ONG 19+ 1 OA D P ,•�n°�2 ` 2� q 2+03 NV) CO —J + J 1 + 2`,E k.D L— 1 129 10+32 r� 6" T L I NE----- -- - - --—-- I Contract 70 Water Project No. PW53--C60530777820 FORT WORTH Sewer Project No. PS58-070580176270 D.O.E. No. 4315 KHA No. 061018025 Legend CxIS71NG WA1(R LINE ALIGNMENT EXHIBIT - E2 CROPOS[D wI ISN[ VARIOUS WATER LINES PPOPO M w Kirnley Hom Wates Maps 2036-392 & 2036-3% SUL[ 1- 500 and Associates,Inc. Mapsco 61 & 62 WT oma.,x arr em n r•%n /•Im na»-eee Co[nd District 7 0 500 I000 14 .. wwrLL+10OD ~E SCITI[rCNI .- Ry . Of��.i 16' •C�. J•'Cwc. 1 ..1 la 16' Il' Nla-o® • , V e ; o LK dl m to 1pIT I CCL L D g • DR mot t` [ r w. , P97 CKAC CYC l U �i > I Cleo% OR ' • NIYeL ION e F s r[T1 • •rH y ie 1 • •'[S1 l �lq p e. e y YCS7 a erM m bo 7- r Sr e' e• o c my