Loading...
HomeMy WebLinkAboutContract 30107 U '`QTYSECRETARY NO . AMENDMENT No. 6 THE STATE OF TEXAS § CITY SECRETARY CONTRACT NO. (No M&C Needed) COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and Dunaway Associates, Inc., (Engineer) made and entered into City Secretary Contract No. 27112, (the Contract) which was authorized by the City Council by M&C 18759 on the 2"d day of October, 2001; and subsequently revised by five amendments; and WHEREAS, the Contract involves engineering services for the following project: DESIGN WATER AND SANITARY SEWER LINES FOR GREENWAY MODEL BLOCK ADDITION WHEREAS, it has become necessary to execute Amendment No. 6 to said Contract to include an increased scope of work and revised maximum fee; SEPARATE WATER AND SANITARY SEWER FOR GREENWAY INDUSTRIAL PARK INTO TWO INDEPENDENTLY ADVERTISED CONSTRUCTION PROJECTS NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in the proposal letter dated June 27, 2004, a copy of which is attached hereto and incorporated herein. The cost for the additional professional services to be performed by the Engineer totals $13,294.00. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid the Engineer for all work and services under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed $407,961.80. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this r-21L I day of ���, 2004, in Fort Worth, Tarrant County, Texas. AT T: Contract huthori zatiom S via Glover Y�-- /1tss� City Secretary Date APPROVAL RECOMMENDED: OV i A. Douglas Rademaker, P.E. Marc Ott Director, Department of Engineering Assistant CityLager Dunaway Associates, Inc. ENGINE By: ' Associate Name: Brian Darby, P.E., 1501 Merrimac Circle, Suite 100 Fort Worth, TX 76107-6572 APPROVED AS TO FORM AND LEGALITY: Gary Steinberger Assistant City Attorney f -']AL IEC07 ' 4W DUNAWAY ASSOCIATES, INC. ENGINEERS • MANNERS • SURVEYORS DAI No. 2001089 June 27, 2004 Mr. Fred Ehia, P.E. City of Fort Worth Department Of Engineering Fort Worth, Texas 76102 Reference: Amendment No. 6 - REVISED Greenway Addition Model Block Water Project No. PW 53-060530176130 Sewer Project No. PS 58-070580175450 Dear Mr. Ehia: Dunaway Associates, Inc. is pleased to present this revised Amendment No. 6 for the following additional services that are beyond our original scope of services. • Updates to plans, specs & OPCC to split project • Reproduction • One Public Meeting • As directed, we will not perform any of the following for this portion of the project and they are not included in this scope of services: o Coordination, bidding, and construction assistance. o Bid advertisement/opening/tabulation/recommendation o Coordination meetings o Pre-construction Conference o Pre-Bid Meeting o Final observation o Shop Drawing Review 1 1,yJg�1;� :;1yy�v44��L��144N��I?RAI', 1601 MERRIMAC CIRCLE • SUITE 100 • FORT WORTH,TEXAS 76107-6572 • (817)3361121 • METRO(817)429.2135 • FAX(817)335-7437 • Amendment No. 6 June 27, 2004 Page 2 A summary of the proposed budget for this proposal is as follows: Basic Fee Updates to plans, specs&OPCC to Split Project $ 8,000.00 Reproduction $ 4,794.00 Bid advertisement, opening, tabulation, recommendation $ - Coordination meetings $ - Pre-Construction Conference $ - Pre-Bid Meeting $ - Public Meeting $ 500.00 Final Observation $ - Sho Drawing Review $'I U I AL PROPOSED AMENDMENT $ 13,2 Please review the enclosed information and do not hesitate to call me if you have any questions or require additional information regarding this proposal. Sincerely, DUNAWAY ASSOCIATES, INC. Brian S. Darby, P.E. Associate 2001089 Amendment#6 FEhia 04-0527 KMC.doc FF1 IAL ON `Qq1r jEUIMP1.11 ��jjgq rls F:' A1H) I66M..