HomeMy WebLinkAboutContract 30807 COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No. 7
WHEREAS, fo,4&)ol4l Qe oa F• hereinafter called
"Developer", desires to make certain improvements to
ll", //e y , an addition to the City of Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
That said Developer, acting herein by and through GQ 9 o, V a,*r, , its
duly authorized LXeC* /1'✓i 1b1'1-eC 101' and the City, acting herein by and
through Marc Ott, its duly authorized Assistant City Manager, for and in consideration of
the covenants and conditions contained herein, do hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated
March 2001, approved by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Contract as if copy
herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of this
Community Facilities Agreement and the Policy shall be resolved in favor
of this Agreement.
C. Developer shall provide financial security in conformance with paragraph
6, Section II, of the Policy.
D. The Developer shall award all contracts for the construction of community
facilities in accordance with Section H, paragraph 7 of the Policy.
E. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section H, of the Poficy.
CFA REVISED FORMAT WITH 4% 1
F. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers,
agents and employees from all suits, actions or claims of any character,
whether real or asserted, brought for or on account of any injuries or
damages sustained by any persons (including death) or to any property,
resulting from or in connection with the construction, design, performance
or completion of any work to be performed by said Developer, his
contractors, subcontractors, officers, agents or employees, or in
consequence of any failure to properly safeguard the work, or on account
of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub-contractors, officers, agents or
employees, whether or not such injuries, death or damages are caused,
in whole or in part, by the allered negligence of the City of Fort Worth,
its officers, servants, or employees.
G. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
H. In the event that City participation exceeds $25,000, Developer agrees that
no street construction or storm drainage will begin prior to City Council
approval of this Community Facilities Agreement. (Article 104.100,
Ordinance 7234).
I. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been constructed
(Article 104.100, Ordinance 7234).
J. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications and
cost estimates supplied by the Developer for this contract.
K. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to construct
current and future improvements provided for in this agreement.
L. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a pact hereof.
CFA REVISED FORMAT WITH 4% 2 - —---
Water (A)None; Sewer(A-1)None; Paving (B) attached; Storm Drain(13-
1) attached; Street Lights and Signs (C) attached.
H. Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibits B, B 1, and C.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibits B, 131,
and C. The estimated total cost of current improvements and related
support services specified in this agreement, including design,
construction and inspection is estimated to $IV-0,
7�a
Notes:
1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets.
The developer is responsible for installation of sidewalk and a separate financial
guarantee is required in the form of a bond or check for the cost of the sidewalk.
2. Developer's column for Item C represents four percent(4%)cost for construction
inspection fees and materials testing. The City will pay additional inspection fee over
4%.
3. City not preparing plans and specifications.
CFA REVISED FORMAT WITH 4% 3
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager,
attested by its City Secretary, with the corporate seal of the City affixed, and said Developer
has executed this instrument in triplicate,at Fort Worth,Texas this the day of
2004.
Approval Recommended:
ATTEST: Transportation and Public Works
Department
Marty Hend 'x
City Secretary
Robert Goode, P. E.
Director
Contract;. authorization
City Of Fort Worth
Marc Ott
Assistant City Manager
Approved as to Form:
Assistant City Attorney
ATTEST: DEVELOPER
By:
Corporate Secretary
E. '
q
CFA REVISED FORMAT WITH 4% 4
SUMMARY OF COST
Item Developer City Cost Total Cost
Cost
A. Construction $ -
1. Streets $120,778.50 $ 120,778.50
2. Storm Drainage $14,259.20 $ 14,259.20
3. Street Lights $11,000.00 $ 11,000.00
4. Street Name Signs $ 300.00 $ 300.00
B. Engineering Design $ -
C. Construction Engineering
and Management by DOE 4% $ 5,401.51 1 FT 5,401.51
TOTALS $ 151,739.21 $ - $ 151,739.21
CFA CODE: 4
tO 1 a
y
94
S,
ON ,maw,p
Qk
� — Y
� oo 00 U
O
co
� .� �.• �
p
00 ti
► ' 0
1
eo �
f
.09
sm
R
M �
- - v
z cr 3
� W
rnra>-
Na NQ 'v
3 3
l,NNdd IIVHdSV '1SIX3 wo fro
Hinos cw6a 3Nn3did a 0: a 0: a
Z_
a .�� a
La
o 0
o
Izi� N UUZ Y w
C4 slim 39m, W)
U Q Q O
w
r
O
� o
Z M
V
0
0
v Y ao V
o i3
W y
CID Q
m
M, .wa-a
.091
i
i
M i
i
M
s
nu
n,
n
� 1
.V
y
M I �
54
qN MIN"38W n�
Q �
00
� � Y
4
v U
� O
00
to
w
0
o
Q y
v Asa a.m. .09
- O
C4
N ^J oe
v 00
WET{ r�
J V
2J �}
in 0
3
a,W, $a
.L.MVd LIVHdSV 1SIX3 ff� 0:0
Hinos OVOS 3NI13dld a 0 a
DMG ASSOCL9 TES,INC
5908 End O'TraU
Fort Worth, TEXAS 76112
CLIENT: Habitat for Humanity PROJECT# 03-175
PROJECT Mosier Valley-Fort Worth Amir Ghalibaf,P.E.
CITY: Fort Worth ACREAGE: 6.3
DATE: June-04 LOTS: 26
ENGINEER'S PROBABLE COST PROJECTION
ITEM DESCRIPTION QUANTITY UNIT UNIT COST AMOUNT
C. On-Site Storm Drainage
1 24"RCP 161 LF $ 40.00 $ 6,440.00
2 Trench backfill 161 LF $ 12.00 $ 1,932.00
3 Std. 10'inlet 1 EA $ 2,200.00 $ 2,200.00
4 Grouted Rip-Rap 10 SY $ 120.00 $ 1,200.00
5 Concrete Flume 65 SY $ 22.00 $ 1,430.00
6 Contingency 10% $ 10,572.00 $ 1,057.20
Sub-Total $ 14,259.20
D. On-Site Street Paving
1 Unclassified sheet excavation 2000 CY $ 2.50 $ 5,000.00
2 Street fill per item 114 1200 CY $ 5.50 $ 6,600.00
3 6"Lime Subgrade 3960 SY $ 3.50 $ 13,860.00
4 Lime for Subgrade 60 ton $ 110.00 $ 6,600.00
5 5"HMAC 3600 SY $ 22.00 $ 79,200.00
6 7"Conc.Curb and 18"Gutter 2145 L.F. $ 3.50 $ 7,507.50
7 Conc.valley Gutter 25 SY $ 25.00 $ 625.00
8 Street light 5 EA $ 1,100.00 $ 5,500.00
9 Street Sign 3 EA $ 65.00 $ 195.00
10 Contingency 10% $ 13,860.00 $ 1,386.00
Sub-Total $ 126,473.50
175-final-Cost Estimate—Option A 2 of 3 8/26/2004
III.
"STREETLIGHTS"
INTERSECTIONS
PIPELINE RD & GARRETT ST 1
FRAZIER CT & GEORGE CT 1
MID- BLOCK
GARRETT ST 2
CHANGE OF DIRECTIONS
GARRETT ST 1
MOSIER VALLEY ADDITION
Page III of Exhibit C
I . STREET LIGHT COST ESTIMATE
QUANTITY UNIT COST TOTAL COST
INTERSECTIONS 2 EA $ 2, 000 $4, 000 . 00
MID-BLOCK RESIDENTIAL 2 EA $ 2, 000 $4, 000 . 00
CHANGE OF DIRECTION RESIDENTIAL 1 EA $ 2, 000 $2, 000.00
MID-BLOCK COLLECTOR 0 EA $ 2, 000 $0, 000 . 00
MID-BLOCK ARTERIAL PARKWAY 0 EA $ 2, 500 $0, 000 . 00
MID-BLOCK ARTERIAL MEDIAN 0 EA $ 2, 500 $0, 000. 00
RELOCATE EXISTING LIGHT 0 EA $ 1, 500 $0, 000 . 00
Subtotal $10,000.00
City's Cost $00, 000.00
Developer's Subtotal $10,000 .00
10% Contingencies $1,000.00
Project Total $0,000.00
Adjacent Developer's Cost $11,000.00
Developer's Cost $11,000.00
2% Inspection Fee $0,00.00
CFA CODE #2004134
DEVELOPER' S COST: $11,000.00
MOSIER VALLEY ADDITION
September 24, 2004
Fort Worth, Texas
September 24, 2004
PAGE I OF Exhibit C
II. STREET LIGHTS WORK DESCRIPTION:
1 . The Developer shall provide for the installation of streetlights at
the approximate locations shown in Exhibit "C", immediately after
final acceptance of the street construction, in accordance with
engineering plans and specifications approved by the Transportation
and Public Works Department.
2 . Streetlights on residential and /or collector streets can be
installed using overhead or underground conductors with the approval
of the Director of Transportation and Public Works .
3 . The City will install all the streetlights that use overhead or
underground conductors on residential, and collector streets. the
developer agrees to pay the city the amount shown below prior to the
City starting it' s design efforts.
4 . Streetlights on arterial streets shall be installed with underground
conduit and conductors .
5 . The Developer agrees to dedicate all easements required for the
installation and maintenance of the street lights and to provide for
the installation of any electrical transformers required for the
proper operation of the street lights
6. The estimated cost of this street light installation is detailed on
page 1 of exhibit C and is summarized below, the street lights will
remain the property of, and will be maintained by the City of Fort
Worth.
DEVELOPER'S COST: $11,000.00
MOSIER VALLEY ADDITION
September 24, 2004
FORT WORTH, TEXAS
CFA CODE #2004134
Page II of Exhibit C
IV
STREET NAME SIGNS
1. The City of Fort Worth will install the street name signs upon final
approval of the street construction. The street name signs will remain
the property of, and will be maintained by, the City of Fort Worth.
2. The Developer will pay for the street name sign installations required
for this development to the extent of $100.00 per intersection. This
unit cost will be revised annually by the Department of Transportation
and Public Works to reflect prevailing costs of materials and labor.
3. This development creates the following three (3) intersections at a cost
to the Developer of$300.00:
Garrett St & Pipeline Rd S
Garrett St & George Ct
Frazier Ct & George Ct
Mosier Valley Addition
CFA code: 2004134 September 14, 2004