HomeMy WebLinkAboutContract 32007 AMENDMENT NO. 1 STATE OF TEXAS § CITY SECRETARY CONTRACT NO. (M&C]needed) COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and Transystems Corporation Consultants (Engineer) made and entered into City Secretary Contract No. 29785 (the Contract)which was authorized by the City Council by M&C C-19937 on the 20th day of January, 2005; and WHEREAS, the Contract involves engineering services for the following project: Engineering Contract for Sanitary Sewer Rehabilitation Contract LXXX (69) Village Creek Drainage Basin (Enchanted Bay). WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated April 6, 2005, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $56,480.00 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of$305,264.00 3. All other provisions of the contract, which are not expressly amended herein, shall remain in full force and effect. Isle ORI -SIAL Wil EXECUTED on this the day of `J� (� , 20 in Fort Worth, Tarrant County, Texas. APPROVAL RECOMMENDED: ROVED: A.Douglas Rademaker, P.E. Marc Director, Department of Assist nt City Manager Engineering TranSystems Corporation Consultants ENGINEER ATTEST: 9 ti 2- Marty4iendfix, City Secretary By: Name: Raul Pena III P.E. � Regional Vice-President - -rtract Authorization AP OVED AS TO FORM AND LEGALITY: Ga teinberger Assistant City Attorney TZwS'YSTEAAS CQ2P0l�AT/O/V/i',�— C O N 5 U L T A N T 5 AMENDMENT NO. 1 SUMMARY OF FEE April 6, 2005 Gopal Sahu, P.E. Department of Engineering City of Ft. Worth 1000 Throckmorton Street Fort Worth, Texas 76102 Reference to: Scope of Services Enchanted Bay Area TranSystems Project No. P202030059 Dear Mr. Sahu, As requested, attached please find a detailed breakout of our request for additional fee. TranSystems will develop plans and specifications as necessary for the proposed sewer line from the proposed laterals along Strickland Rd., Vista Farley Rd., and Laster Rd. to the proposed lift station in "The Waterfront at Enchanted Bay" development. In addition, the relocation of an 8" water line along Kay Dr. from Strickland Rd. to the K-Mar Mobile Home Park. We propose to complete the proposed work in accordance with the following fee schedule which includes one public meeting and exhibits: Design approximately 1,340 If of 8" and 10" sewer. Estimated Construction Costs (Sewer line — no special junction structures): SUB TOTAL: $89,920.00 Design approximately 2,500 of 8" water line. Estimated Construction Costs (Water Line): SUB TOTAL: $125,840.00 TOTAL .__$215,760.00 G:\FW03\D059\ProjectMgmt\Contracts\ammcndmentammend INcombination 1&2\addend 1 breakout rnv.doc Basic Engineering Design Services- TSPE Curve A $ 215,760 x 11.5% x 0.85= $ 21,090.00 Special Services Lump Sum $ 35,390.00 Coordinate alignment with Carter and Burgess $ 4,000.00 *Structural Design of 3 structures (Gojer) $ 13,000.00"* Structure Layouts and Meetings with City $ 4,000.00 *Survey for Benchmarks within Development (ANA) $ 1,900.00 *Survey for Subsurface Utility Engineering (ANA) $ 1,500.00 *Subsurface Utility Engineering (QUE) $ 1,950.00 Sub-consultant Management $ 2,640.00 Meeting with City $ 500.00 *Easements in Waterfront of Enchanted Bay $ 5,400.00 (12 @ $450.00) Reimbursable $ 500.00 Note: 1. "* " indicates the task is assigned to be completed by M/WBE 2. Fees for the surveying benchmarks, surveying subsurface utility engineering, subsurface utility engineering, and sub-consultant management were previously approved. 3. " ' An amount of $2,070.00 was in the original contract for design of small structures. This amount was deducted from our total request for this task. This fee is for the additional cost to structurally design 3 large junction boxes. AMENDMENT NO.1 - TOTAL LUMP SUM $ 56,480.00 Original Contract Fee $248,784.00 Amendment No. 1 $ 56,480.00 CONTRACT - TOTAL LUMP SUM $305,264.00 We will be using ANA Consultants LLC to provide surveying services, Gojer Associates for structural design and Quality Utility Engineering (QUE) for the subsurface utility engineering. This will result in a 42% portion of Amendment No. 1 being performed by approved M/WBE firms. If you have any questions or require additional information please give me a call. Sincerely, TranSystems Corporation Consultants oseph ACMasterson, P.E. Senior Associate G:kPW03100391ProjecrMgmtlContractilammendmentlammend Ilcombination 1&2Wddend!breakour rev.doc I � r. City of Fort Worth, Texas Mayor and Council Communication .:. COUNCIL ACTION: Approved on 5/31/2005 - Ord. #16460-05-2005 .r..f.r...x::::::fr..........:C..:1.::....4nv...xx.{..n.:.n............................n.........:.......f....x...f...n....fnr.:..:.ffi..::AC..J,.n:.{{?•iif/..xrffl.•i:•>:8x.r�{..fx":%?-ii:^i:W.n ... ....... DATE: Tuesday, May 31, 2005 LOG NAME: 30ENCHBAY 1 REFERENCE NO.: **C-20768 SUBJECT: Adopt Appropriation Ordinance and Authorize Execution of Amendment No. 1 to City Secretary Contract No. 29785 with Transystems Corporation Consultants for Sanitary Sewer Rehabilitation LXIX Village Creek Drainage Basin ..... w............n.»r/.rrx.....:r.v:.v...x::::....w::.l-.-J v..v... vv::r.--...wnv::n.....................r....i::4:-:iS-i:i:i:Vfu:Si<1i::A0' 1.................. ...Y....r•v.-r:x... .v... .m.-. ..... :.:.v....f........r...:...............x:................ /::..:::xx::rxnv::f/..::•:W.:.:::...........w •firi.:.... .. .. .. RECOMMENDATION: It is recommended that the City Council: 1. Authorize the transfer of $56,480 from the Water and Sewer Operating Fund to the Water Capital Project Fund, in the amount of$20,330 and the Sewer Capital Project Fund in the amount of$36,150; 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriation in the Water Capital Project Fund in the amount of $20,330 and the Sewer Capital Project Fund in the amount of $36,150 from available funds; and 3. Authorize the City Manager to execute Amendment No. 1 to City Secretary Contract No. 29785 with Transystems Corporation Consultants for additional services to Sanitary Sewer Rehabilitation Contract LXIX Village Creek Drainage Basin in the amount of $56,480, thereby increasing the total contract amount to $305,264. DISCUSSION: On January 20, 2004 by M&C C-19937, the City Council authorized the City Manager to execute an engineering agreement with Transystems Corporation Consultants for Sanitary Sewer Rehabilitation Contract LXIX Village Creek Drainage Basin to prepare plans and specifications for a fee not to exceed $248,784. Amendment No. 1 provides for the design of an additional 1,340 linear feet of 8-inch sanitary sewer along David Strickland Road, Vista Farley Road and Laster Road. The sanitary sewer will connect to a lift station located at the nearby Waterfront at Enchanted Bay development, which will provide service to the residents in the Sun Valley neighborhood. This amendment also includes the design for the replacement of approximately 2,500 linear feet of existing water line in Kay Drive to allow installation of a new 54-inch sanitary sewer line and the acquisition of 12 easements for the project. The engineer will also design three junction structures to connect between the two existing large diameter sewers to facilitate future maintenance. These services were not included in the original contract and are the result of further detailed evaluation by the engineer at City staffs request. City staff considers the proposed fee of $56,480 to be fair and reasonable for the additional services to be performed. Transystems Corporation Consultants is in compliance with the City's M/WBE Ordina ice by committing to an additional 45% M/WBE participation on this Amendment No. 1, Logname: 30ENCHBAY 1 - Page 1 of 2 This project is located in COUNCIL DISTRICT 5. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that upon approval and competion of recommendation one and the adoption of the attached appropriation ordinance, funds will be available in the current capital budgets, as appropriated, of the Water Capital Projects Fund and the Sewer Capital Projects Fund. TO Fund/Account/Centers FROM Fund/Account/Centers 1&2)PS58 472045 070580176170 $36,150.00 3)PS58 531200 070580176170 $36,150.00 2)PS58 53120 070580176170 $36,150.00 1)PE45 538070 0709020 $36,150.00 1&2)PW53 472045 060530177980 $20,330.00 1)PE45 538070 0609020 $20,330.00 2)PW53 531700 060530177980 $20,330.00 3)PW53 531200 060530177980 $20,330.00 Submitted for City Manager's Office bk Marc Ott (8476) Originating Department Head: A. Douglas Rademaker (6157) Additional Information Contact: A. Douglas Rademaker (6157) yr��N •'�'Y.''_r"'1'1. ' Logname: 30ENCHBAY 1 Page 2 of 2