Loading...
HomeMy WebLinkAboutContract 30108 AMENDMENT NO. 1 STATE OF TEXAS $ CITY SECRETARY CONTRACT NO. (No M&C Needed) COUNTY OF TARRANT $ WHEREAS, the City of Fort Worth (City) and EJES, Inc. , (Engineer) made and entered into City Secretary Contract No. 29587, (the Contract) which was authorized by the City Council by M&C C-19957 on the 10th day of February 2004; and WHEREAS, the Contract involves engineering services for the following project: Engineering contract for the design of Water and Sanitary Sewer Replacement Contract 2001 STM-J. WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated June 2, 2004, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $23, 565 .72 . 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $106, 948 .72 . 0,FFIC1A,I IF..E02b, 3 . All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. r , j ! • EXECUTED on this the = - day of ( ,(j l_� 2004, in Fort Worth, Tarrant County, Texas. A T: s 1 Contract Authorizatioia nY1 ylvia Glover'kill ting City Secretary � Date APPROVAL RECOMMENDED: A�,gROVFJ) I A. Douglas Rademaker, P.E. Marc A. Ott Director, Department of Assistan _ City Manager Engineering EJES Inc. ENGINEER By: Name: Edwin B. Jones, P.E. President 5009 Brentwood Stair Road Fort Worth, TX 76112 APPROVED AS TO FORM AND LEGALITY: Gary Steinberger Assistant City Attorney ,.�ICIA- L � l � f -2- r , IIn,, t, I N C O R P O R A T E D Service with Excellence June 2, 2004 Mr. Mike Domenech, P.E. Project Manager City of Fort Worth Department of Engineering 900 Monroe, Suite 201 Fort Worth, Texas 76102 RE: Request for Amendment No. 1 Water and Sanitary Sewer Replacement Contract 2001, STM-J, DOE 4276 EJES Project No. 10-400-01 Dear Mr. Domenech: This letter is in response to your request for additional engineering design services. Detailed breakdown and summary of estimated fees are attached. A description for additional work is as follows: During the concept review meeting it was decided by the City to add four sanitary sewer laterals, L-6248, L- 6398, L-6591 and L-7439 and add top of curb (T/C) plan and profile drawings for all streets which involved replacement of sewer and water lines to the project scope. The proposed plans will be incorporated in the preliminary submittal of the project and will include maximum of additional nineteen (19) new plan and profile sheets. Our engineering fee estimates for this work includes the following: "Preparation of construction plans for sanitary sewer lines (2,139 LF) " Preparation of construction plans for top of curb (6,674 LF) The additional efforts are considered outside our original scope of work, and we therefore request a contract amendment to increase the lump sum fee amount by twenty three thousand five hundred ($23,500.00). See attached EJES fee estimate. Original Contract Lump Sum Amount: $83,383.00 Amendment No. 1: $23,565.72 Total Revised Amount: $106,948.72 If you have any questions or need additional information concerning this request, please feel free to call me at(817)457-5575. Sincerely, EJES INC. �2''""'� Tanvir(Tony) Islam, P.E. Fort Worth Operations Manager , - � TI Enclosure r: r, CORPORATE OFFICE: 9696 Skillman Street•Suite 220•Dallas,Texas 75243•Phone(214)343-1210•Fax(214) -3885 5009 Brentwood Stair Road•Suite 101 201 Johnston Street•Suite 303 9151 Interline Drive•Suite 5B 2718 Jewello Avenue Fort Worth,Texas 76112 Alexandria,Louisiana 71301 Boton Rouge,Louisiona 70809 Shreveport,Louisiana 71109 (817)457-5575•Fox(817)457-5578 (318)443-1901 •Fox(318)443-1904 (225)926-4746•Fox(225)926-6552 (318)631-1243•Fax(318)631-1241 CITY OF FORT WORTH EJES Project No.10-400-01 AMENDMENT NO.1 COST SUMMARY Pae 1 of 2 CONTRACTING ENTITY TITLE OF PROJECT EJES, Inc. Water and Sanitary Sewr Repl.Contract 2001 STM-J,DOE 4276 1. LABOR HOURS RATEMOUR EST.COST(S) Project Manager 26.0 $85.76 $2,229.76 Project Engineer 49.0 $80.00 $3,920.00 Sr. Engineer 71.0 $69.06 $4,903.26 CADD Technician 231.0 $49.47 $11,427.57 Clerical 24.0 $22.87 $548.88 TOTALS 401.0 $23,029.47 TOTAL LABOR $23,029.47 4. TRAVEL QtY. Unit Rate Personal Car Milage 250 Miles $0.34/Mile $85.00 Parking 8 Events $6.00/Event $48.00 TOTAL $133.00 5. SUB-CONSULTANTS(LOPEZGARCIA GROUP) DESIGN A.Design of Top of Curb and Sanitary Sewer lateral TOTAL DESIGN $2,750.00 REPRODUCTION(HUGO TREVINO&ASSOCIATES) Qt ii Unit Sets Rate A.Plan Plotting/Reproduction 1.60%Submittal 19 Sheet 20 $2.50 $950.00 2.90%Submittal 19 Sheet 5 $2.50 $237.50 3.Final Submittal/Final Review 19 Sheet 2 $2.50 $95.00 TOTAL REPRODUCTION $1,282.50 6. TOTAL SUB-CONSULTANTS COST $4,032.50 7. FEE 10%of SUB-CONSULTANTS $403.25 8. TOTAL COST(LABOR+TRAVEL) $23,162.47 9. TOTAL CONTRACT COST(LABOR+TRAVEL+10%SUBCONSULANTS COST) $23,565.72 DATE: May 28,2004 SIGNATURE OF PREPARER: Tanvir on Islam,P.E. EJES NO.10-40401 Page No. 1 of 2 5/28/2004 N CD Co N V V' V f� Y to - 00 ch N N ao Q J r' v v v o cv o of o H H O Lu �cfl ��� 64 � LU LL Y O (A � m Cl) � CO M Lo co co OD co d N CNV V LO U � OL h apLO Qi r ~ LOC) QD o � � chv U ❑ Lov � � LL FA L � UImCp N Nc o M Ir W v ch oo co � v co � ,)IID QD v O Z L p QCDo O C4 W V c- CO V CO N CD Qto a En h 0) O 0 M (') N V aD N V N U]00 N W w Z d N N a n 3 F o aw a ci t w o aWZ2 � OQ' eQO m LLJ2 J d IxaWUw UJ io 3 ooa = O Q m M m = o LU a a t U) LU w a wQ t: ( 3 CY) z v � h a, J W � F C 4 M 3 7 rn 4) Cl) Lf) s IT o Z C (j) h J Q J 0 Q LO Z -0 N Q U o m m N ❑ o � o 06 R J gY 2 0 U m Q CL m m C c J c E c N N @ N o c O c 5 0 O Q .V Z3 co TCn RO piEcn d ma c cc6 0 Y O d OFL N o U IZD W � 47 •-� C) fA E 3 r EDD c`4 Oco o 0 c U C o m ]# 1pryn 5p7t 30 v mO w p C .v _N o C .:: iii z U w Q m ❑ Q m U m Q