WHEREAS, The City of Fort Worth and Komatsu Architecture, Inc. (Architect) made and entered into City
Secretary Contract No. 26721 (The Contract) which was authorized by the City Council by M&C C-18453
the 13th day of February 2001; and
WHEREAS, The Contract was amended by Amendment 1 to compensate the Architect for services to
plan storm drainage improvements from the Rosedale PASS Project; and
WHEREAS, Amendment No. 2 reimbursed the Architect for additional topographic survey due to purchase
of the adjacent railroad property; and
WHEREAS, additional services were required as a result an increase in the size and complexity of the
project, coordination of utilities, site selection planning, and accessibility design.
NOW THEREFORE, City and Architect, action herein by and through their duly authorized
representatives, enter into the following agreement that amends the Contract:
Revise SECTION I - SERVICES OF THE ARCHITECT, to read as follows:
1.1 The City hereby contracts with Architect as an independent contractor, and the Architect hereby
agrees to perform, within the professional standards normally accepted in the State of Texas,
professional services in connection with the following general scope of work:
1.1.1 Design of Fire Station 8. Station will be a four bay, three-company station located on the corner
of 12th Avenue and Rosedale. Project includes facility, site paving and utilities and grade
adjustments on 12`h and Beckham. Storm drain relief line to serve Rosedale drainage will be
designed and constructed by City under separate agreements.
1.1.2 Changes of Scope by Amendment:
1.1.2.1 Amendment 1: Planning of storm water improvements to accommodate the drainage from
Rosedale Avenue. Design of storm drainage through the site and off the property is not
included.
1.1.2.2 Amendment 2: Provide additional topographic survey to incorporate additional areas due to
the purchase of adjacent railroad property.
1.1.2.3 Amendment 3: Provide site planning for an additional site, coordination with TxDOT on the
Rosedale PASS project, management and coordination associated with the selection and
evaluation of alternative sites, and redesign to resolve TDLR's refusal to accept the City's
alternative design"
Revise Paragraph 1 of SECTION V COMPENSATION TO ARCHITECT to read as follows:
1. "The total compensation for all of the assignments to be performed by Architect as described in
CHARACTER AND EXTENT of ARCHITECT'S SERVICES, including all amendments, shall be a
fixed fee of$226,124 plus up to $6,500 in special services and expenses.
a. Compensation is as follows:
i. Original Agreement: $196,328 fixed fee plus up to $6,500 in special services
and fees.
ii. Amendment 1: Increased fixed fee by $4,962
iii. Amendment 2: Increased fixed fee by$3,334
iv. Amendment 3: Increase fixed fee by$21,500" QQ
Page 1
All other provisions of this Contract that are not expressly amended herein shall remain in full force and
effect. ))
EXECUTED this thecj ff th day of / 2003, in FortWorth Tarrant Coun_ as
By: By:
,Karl Koma'su, Pre ident Marc Ott -
Komatsu Architecture, Inc. Assistant City Manager
Recommend A pprpv 1
A
By: APPROV D TO FO M AND LEGALITY
Director ran portation and
Public Works By:
Assistant Attorney
A T:
By: '
City Secretary
1 "d—
r
-ontract Authori action
Date