Loading...
HomeMy WebLinkAboutContract 29409 AMENDMENT NO. 3 TO AGREEMENT FOR ARCHITECTURAL DESIGN SERVICES FIRE STATION 8 STATE OF TEXAS 4/C CITY SECRETARY CONTRACT NO. COUNTY OF TARRANT WHEREAS, The City of Fort Worth and Komatsu Architecture, Inc. (Architect) made and entered into City Secretary Contract No. 26721 (The Contract) which was authorized by the City Council by M&C C-18453 the 13th day of February 2001; and WHEREAS, The Contract was amended by Amendment 1 to compensate the Architect for services to plan storm drainage improvements from the Rosedale PASS Project; and WHEREAS, Amendment No. 2 reimbursed the Architect for additional topographic survey due to purchase of the adjacent railroad property; and WHEREAS, additional services were required as a result an increase in the size and complexity of the project, coordination of utilities, site selection planning, and accessibility design. NOW THEREFORE, City and Architect, action herein by and through their duly authorized representatives, enter into the following agreement that amends the Contract: Revise SECTION I - SERVICES OF THE ARCHITECT, to read as follows: 1.1 The City hereby contracts with Architect as an independent contractor, and the Architect hereby agrees to perform, within the professional standards normally accepted in the State of Texas, professional services in connection with the following general scope of work: 1.1.1 Design of Fire Station 8. Station will be a four bay, three-company station located on the corner of 12th Avenue and Rosedale. Project includes facility, site paving and utilities and grade adjustments on 12`h and Beckham. Storm drain relief line to serve Rosedale drainage will be designed and constructed by City under separate agreements. 1.1.2 Changes of Scope by Amendment: 1.1.2.1 Amendment 1: Planning of storm water improvements to accommodate the drainage from Rosedale Avenue. Design of storm drainage through the site and off the property is not included. 1.1.2.2 Amendment 2: Provide additional topographic survey to incorporate additional areas due to the purchase of adjacent railroad property. 1.1.2.3 Amendment 3: Provide site planning for an additional site, coordination with TxDOT on the Rosedale PASS project, management and coordination associated with the selection and evaluation of alternative sites, and redesign to resolve TDLR's refusal to accept the City's alternative design" Revise Paragraph 1 of SECTION V COMPENSATION TO ARCHITECT to read as follows: 1. "The total compensation for all of the assignments to be performed by Architect as described in CHARACTER AND EXTENT of ARCHITECT'S SERVICES, including all amendments, shall be a fixed fee of$226,124 plus up to $6,500 in special services and expenses. a. Compensation is as follows: i. Original Agreement: $196,328 fixed fee plus up to $6,500 in special services and fees. ii. Amendment 1: Increased fixed fee by $4,962 iii. Amendment 2: Increased fixed fee by$3,334 iv. Amendment 3: Increase fixed fee by$21,500" QQ Page 1 All other provisions of this Contract that are not expressly amended herein shall remain in full force and effect. )) EXECUTED this thecj ff th day of / 2003, in FortWorth Tarrant Coun_ as By: By: ,Karl Koma'su, Pre ident Marc Ott - Komatsu Architecture, Inc. Assistant City Manager Recommend A pprpv 1 A By: APPROV D TO FO M AND LEGALITY Director ran portation and Public Works By: Assistant Attorney A T: By: ' City Secretary 1 "d— r -ontract Authori action Date Page 2