Loading...
HomeMy WebLinkAboutContract 31209 CITY SECRETAR'CONTRACT No () City Secretary Contract No. 27151 AMENDMENT NO. 1 TO ENGINEERING CONTRACT FOR STAGECOACH PUMP STATION CONSTRUCTION MANAGEMENT STATE OF TEXAS § COUNTY OF TARRANT § WHEREAS, on August 21, 2001, the City of Fort Worth, the "City", and Chiang, Patel & Yerby, Inc., the "Engineer", made and entered into City Secretary Contract No. 27151, which was duly authorized by the City Council by M&C C-18719 on August 21, 2001, and WHEREAS, the Contract involves the engineering services for the construction management for the Stage Coach Pump Station; WHEREAS, the "City" and "Engineer" desire to amend City Secretary Contract No. 27151. NOW, THEREFORE, that the City of Fort Worth, a municipal corporation situated in Tarrant County, Texas, acting herein by and through its duly authorized City Manager, hereinafter called "City", and Chiang, Patel & Yerby, Inc., acting and herein by and through its duly authorized President, hereinafter called "Engineer", hereby make and enter into the following agreement which amends the Contract: 1. Article 1, Section 1 of the Contract is amended to include the additional engineering services specified in Attachment D-1, a copy of which is attached hereto and incorporated herein. The cost for the additional services to be performed by the Engineer is $57,630.00. 2. Article III of the Contract is amended to provide for an increase in the maximum fee to be paid to the Engineer for all work and services performed under the Contract as specified in Attachment D-2, a copy of which is attached hereto and incorporated herein, so that the total fee paid by the City for all work and services shall not exceed the sum of$186,699.45. 3. The Engineer acknowledges its commitment to obtain an additional 15% Minority/Women Owned Business Enterprise (M/WBE) Participation for this amendment. The Engineer's commitment for the original contract remains unchanged. 4. All other provisions of the Contract, which are not expressly amended herein, shall remain in force and effect. Amendment 1 Page-1a July 29,2004 Contract No.27151 AUTHORIZATION EXECUTED in the City of Fort Worth this day of ,)GCem 4.>e r- , A.D., 2004. ATTEST: CITYQF FO WORT r' r By fry Marty Hendrix M rc 0, As i an City Manager City Secretary APPROVED: CHIANG, TEL & YERBY, INC. L By J Gt/S. Frhitk Crumb, P.E William E. Carroll, P.E. Acting Director, Water Department APPROVED A TO FOR AND LEGALITY: ATTEST- Q�a G ry Steinberger Assistant City Attorney Secretary 0,-Du4&� Contract`Authorization 1' Date j Amendment 1 Page-2 04 Contract No.27151 ATTACHMENT "D-1" AMENDMENT TO ATTACHMENT A"SCOPE OF SERVICES" This amendment to Attachment "A" Scope of Services for the Stagecoach Pump Station for the City of Fort Worth Water Department incorporates supplemental services items which provide: 1) additional construction management services due to extending the original 8 month project duration to 17 months, and 2) additional construction management services relating to correction of defective construction items discovered after Final Inspection of the project. Supplemental Services Task Additions Attachment A - Task 5 Supplemental Services is hereby amended by the addition of the following items: a. Engineer shall provide additional construction management services for the time period extending from the original 8-month project duration to 17 months. The 17-month time period is from the construction contractor's Notice to Proceed dated February 25, 2002, until the Final Inspection date of July 22, 2003. b. Engineer shall provide additional construction management services for the correction of defective construction items discovered after Final Inspection of the project. These services began in October 2003, and were completed on April 13, 2004. c. Should additional defective items be discovered after April 13, 2004, another contract amendment to continue the Engineer's construction management services will be needed. Amendment 1 Page-3 LJtv1 -W'.200#J• Contract No.27151 ATTACHMENT "D-2" COMPENSATION FOR ADDITIONAL SERVICES AS PART OF AMENDMENT#1 I SUPPLEMENTAL ENGINEERING SERVICES For construction management services under Amendment No. 1, the "City" shall pay the "Engineer" a lump sum fee of$57,630. A. Payment: Partial payment shall be made monthly upon receipt of an invoice from the Engineer based on the percent complete of each task outlined in the following Basis of Payment. B. Basis of Payment: For Item 5a, the lump sum fee is $30,000. For item 5b, the lump sum fee is $27,630. II ADDITIONAL SERVICES For additional services provided outside the scope defined in Attachment D-1, as approved by amendment to this Agreement, the "City" will pay the "Engineer" for labor, other incidental direct costs, and subconsultants on the same basis as described below. A. Labor: The Engineer shall be compensated for the services of his personnel on the basis of Salary Cost times a multiplier of 3.0 for the time such personnel are directly utilized on the work. Typical billing rates are shown in Exhibit B-3. Salary cost is defined as the cost of salaries of engineers, technicians, word processors, surveyors, clerks, laborers, etc., security contributions, unemployment, excise and payroll taxes, and insurance benefits, sick leave, vacation, and holiday pay applicable thereto. The salaries of any personnel assigned are subject to reasonable modification by the Engineer throughout the term of this Agreement; however, such modification will not affect the upper limit value of this Agreement. B. Other Incidental Direct Costs: The Engineer shall be compensated at cost plus 10% for all costs other than salary costs that are incurred pursuant to this Agreement, but which are not normally included as part of the Engineer's overhead. These costs include: air fare, automobile rental, mileage charges, parking, tolls, taxi, meals, lodging, telephone, printing and reproduction costs, computer and work processors, postage and mailing costs, and other miscellaneous costs incurred specifically for this project. C. Subconsultant Services: For all subconsultant services, the Engineer shall be compensated at the actual subconsultant cost plus 10%. D. Payment: Partial payment shall be made monthly upon receipt of an invoice from the Engineer, prepared from the books and records of the Engineer, outlining the amount of hours worked by each employee, the employee's name and classification, and the employee's billing rate along with itemized charges for subconsultant services and other incidental direct costs performed during the period covered by said invoice. This amendment to Exhibit "B-2" Hourly Billing Rates — 2001 of Attachment "B" Compensation for the Stagecoach Pump Station for the City of Fort Worth Water Department incorporates revised billing rates for the amendment supplemental services items 71 F Amendment 1 Page-4 eV 9 "_:. �_ July 29,2004 Contract No.27151 ? - EXHIBIT "B-3" CHIANG, PATEL & YERBY, INC. HOURLY BILLING RATES —2004 Classification of Personnel Range of Billing Rates WHO Principal $150 - $215 Project Manager/Construction Manager $120 - $170 Registered Engineer $ 90 - $150 Graduate Engineer $ 60 - $ 85 Technician $ 55 - $ 75 Word Processor (Clerical) $ 45 - $ 65 Testing Technician $ 50 - $ 60 Welding Inspector $ 55 - $ 70 Amendment 1 Page-5 _ July 29,2004 Contract No.27151 'j� City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 11/16/2004 DATE: Tuesday, November 16, 2004 LOG NAME: 60STAGECOACH REFERENCE NO.: **C-20404 SUBJECT: Authorize Amendment No. 1 to the Engineering Agreement with Chiang, Patel & Yerby, Inc. for Construction Management and Inspection of Stagecoach Pump Station Improvements RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute Amendment No. 1 to the engineering agreement with Chiang, Patel & Yerby, Inc. for the construction management and inspection of Stagecoach Pump Station Improvements, thereby increasing the amount of the agreement by $57,630.00, from $129,069.45 to $186,699.45. DISCUSSION: On August 21, 2001 (M&C C-18719) the City Council authorized the City Manager to execute an engineering agreement with Chiang, Patel & Yerby, Inc. for construction management and inspection of the Stagecoach Pump Station Improvements. The contract scope was to provide construction management and inspection during the construction phase of the new Stagecoach Pump Station. Amendment No. 1 is required to extend the construction management and inspection services of Stagecoach Pump Station from the original 11 month project duration to 15 months. The project is located in COUNCIL DISTRICT 7. Chiang, Patel & Yerby, Inc. is in compliance with the City's M/WBE Ordinance by committing to an additional 15% M/WBE participation on this Amendment No. 1. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the Water Capital Projects Fund. TO Fund/Account/Centers FROM Fund/Account/Centers P160 531200 060160160020 $57,630.00 Submitted for City Manager's Office by: Marc Ott (8476) Originating Department Head: S. Frank Crumb (Acting) (8207) Additional Information Contact: S. Frank Crumb (Acting) (8207) Logname: 60STAGECOACH Page 1 of I