Loading...
HomeMy WebLinkAboutContract 32909 AMENDMENT NO. 2 STATE OF TEXAS $ CITY SECRETARY CONTRACT NO., 9LLO_ (No M&C Needed) COUNTY OF TARRANT b WHEREAS, the City of Fort Worth (City) and Teague Nall and Perkins, (Engineer) made and entered into City Secretary Contract No. 27966, (the Contract) which was authorized by the City Council by M&C C-19206 on the 27th day of August, 2002 and subsequently revised by one previous amendment; and WHEREAS, the Contract involves engineering services for the following project: Sanitary Sewer Rehabilitation Contract LII (52) WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1 . Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated September 27, 2005, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $4,100.00. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $316,150.00. 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. 1 EXECUTED on this the day of , 2005, in Fort Worth, Tarrant County, Texas. ATTEST: NO M&C REQUIRED Marty Hendri , City Secr tary APPROVAL RECOMMENDED: APP hUk��� A. Douglas Rademaker, P.E . Marc Ott Director, Department of o ' Assistant) ssistant ity Manager Engineering TEAGUE NALL AND PERKINS INC. ENGINEER BY= Name:Tv Hilton, P.E. Principal 1100 Macon Street Fort Worth, TX 76102 APPROVED,�.S TO FORM AND LEGALITY: Assists C Attorney -2- yE.. --Responsive-ServicerRefiable Results. D TEAGUE NALL AND PERKINS jW � ENGINEERS ♦ SURVEYORS ♦ CONSULTANTS September 27, 2005 Mr. Rakesh Chaubey, P.E. Project Manager Department of Engineering City of Fort Worth 900 Monroe Street, Suite 201 Fort Worth, TX 76102 RE: Sanitary Sewer Rehabilitation Contract LII (52) Sewer Project No. PS58-070580175070 D.O.E. Project No. 3763 Fee Proposal for Contract Amendment No. 2 Dear Mr. Chaubey: Teague Nall and Perkins, Inc. is submitting this fee proposal for Amendment No. 2 to the contract for the above referenced project based on additional services requested. The following is a brief description and cost for the additional services provided on this project: 1. Additional services to re-design sewer lateral L-1981 The alignment of the sewer must be revised to accommodate a new strip shopping center. The additional services include design and preparation of plans. Subtotal Re-design of Sewer Lateral L-1981: $2,000 2. Additional Services to prepare Right-of-Entry and Easement Documents Two easement parcels must be revised as a result of the new alignment of the sewer. The rates used to calculate the appropriate compensation are the same as what was used in the original contract and are specified below: • Permanent Utility Easements 2 each @ $700 per each = $ 1,400 • Temporary Construction Esmts. 2 each @ $350 per each = $ 700 Subtotal Preparation of Right-of-Entry and Easement Documents: $2,100 Total Contract Amendment No. 2: $4,100: . - 1100 Macon Street Fort Worth,Texas 76102 817.336.5773 phone 817.336.2813 fax www.tnp-online.com r For additional services provided pursuant to this Amendment No. 2, we request compensation in an amount not to exceed $4,100.00. Such payment shall be made in accordance with the payment terms specified in the Contract. Summary of Contract Fee: Original Contract Amount: $290,300 Amendment No. 1 (Not-to-Exceed): $ 21,750 Amendment No. 2 (Not-to-Exceed): 4,100 Revised Contract Amount (Not-to-Exceed): $316,150 Thank you for consideration of this contract amendment request. If you have any questions, please do not hesitate to call me. Sincerely, TEAGUE NALL AND PERKINS, INC. Alan Holly, P.E. 12�J�1� of bra? 7�f 2