HomeMy WebLinkAboutContract 44102-CO2 CITY SECRETAIW 1 &af2.., FORT WORTH., City of Fort Worth CONTRACT NO. G Change Order Request Project Namel Avondale-Haslet Road-East From Water Tank Site to Willow Creek=rive Sec# F44102 Client Project#(s) 01414 Project Description Paving,drainage and street light improvements Contractorl Conatser Construction TX,LP Change Order# 0 Date 8/25/2014 City Project Mgr.I Leon Wilson City Inspector Tom Miller Dept. TPW Water Sewer Contract Time Totals (CD) Original Contract Amount $1,988,779.45 $0.00 $0.00 $1,988,779.45 270 Extras to Date $220,674.05 $220,674.05 231 Credits to Date $0.00 Pending Change Orders(in M&C Process) $0.00 Contract Cost to Date $2,209,453.50 $0.00 $0.00 $2,209,453.50 501 Amount of Proposed Change Order $78,005.20 $0.00 $0.00 $78,005.20 60 Revised Contract Amount $2,287,458.70 $0.00 $0.00 $2,287,458.70 561 Original Funds Available for Change Orders $59,660.00 $59,660.00 Remaining Funds Available for this CO $0.00 $0.00 $0.00 Additional Funding(if necessary) $78,005.20 1 $78,005.20 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 15.02% MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $2,485,974.31 JUSTIFICATION(REASONS)FOR CHANGE ORDER This change order changes the section of the asphalt transition at the east end of the project to 4"of Ty B and 2"of surface mix over 6"of lime treated subgrade with a sealcoat over the area to tie together the old and the new.This change order also adds a guard rail along the south side of the road,just east of the RR tracks to address concerns of adjacent homeowners.This change order adds conduit,wire and pull boxes for street lighting. The overhead lines for the street lighting shown in the original design was not feasible due the clearances necessary for the railroad tracks. �-'C oZ�a.Xtn n a�O0°°a°loo'ly 0. A7 7 o A ° 0 d _. M ��S 9 d 00 0J ° a af'y J. Ka ity ecretaq �aa *o°°°°°° � .� -" It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. Contractor's Company Name Contractor(Name) Contract Signature Date Conatser Construction TX,LP -- — - - I 16946 r n Su o - ` Project anager/Program Manager Date vJ or,C ntraAssis ep) Date rife cting eparfment Dept) Date j Assistant CilrAmma Date Assist t City Manager Council Action(if required) M&C Number M&C Date Approved CITY FT. `- o 3 2 2 ƒ 2 = 3 / t a 2 _ @ $ % A _p o 2 5 5 G e E e 5 ® / X 2 ® m m G \ ® r y o ° » q / \ \ / ° $ 0 ° / ® \ & 2 § 0 m c m e@ § e 7 / ® q ° Q 7 7 / \ j E - & & /@ a 9 2 / 0 ? < 7 ƒ 2 \ 7 7 w o G S' e r o E o _ % 7 f ® / * � 0 / } \ / / ƒ 0 / m w G m & m $ ƒ / ± R > k = 2 \ / / k ) / / $ , « \ c c CO _ 71 2 ° \ \ § 7 (D f ■ CD 2 (n Co 2 77° O ® 00, E ƒ ( o _ $ c 0- C CL O / 3 ƒ w a w a w a w a » 9 0 I e I rr ƒ @ f * $ * » » » » t $ $ ? w = _ % % 3 » 7 \ . \ / w = % & e A % / # M % @ 9 9 9 9@ 9 e @ @ @ @ @ @ @ @ @ g ± H % > % % % \ / \ \ - - « - - 16.9 / 9 _ ƒ R \ R / $ 9 . 9 / 0 / ~ 0 o a o o c a e o ' C) c c o c c o c o - G 2 / 8 0 . m n v ao m O EA cn Q m D Q .=r O 3 d 0'U N O N C cr O CCDD N d CD d O 69 SO 90 O O O EA E9 O CJ1 O O U7 N O O N O O O O n o (D c7 0 ^7 � O A o C7 CD -� cu' ° (D' z .. n� r (7 o D o °� _< o Q v O (7 n) _ o v � v � m CD v �U O o Q v (n Q. � I ?< m m c r T O 0 0 n CD 3 p1 0 v D C 3 n o `CD O C' °m �- o o m -1 ,' CA CD 3 a (D n CD = o n co o CD N 0 Q c�D .� o (p N v � (D 'G C1 00 � N � C`1 N O_ A P O N O N S 7 ((DD O Q (D 0 (D (D r-F O O N v Oq (D N O -f, N C O' ol O_ CD O N G N (D O cn N EA CD O O O O O O O O O E M/WBE Breakdown for this Change Order MWBE Sub Type ofService Amoun#for this CD Robert Granados Trucking Material Hauloff $4,000.00 Total 4,p00-0 Previous Change Orders 1 1/16/2014 $15,000.00 Total $"15,004 flU K z: I 4 g i p� i t