HomeMy WebLinkAboutContract 45926 mil° d SEC Z CSJ#: 0902-48-869,Fed. #: STP 2014(162)TE
CONTRACT ill®. istrict# 02-Fort Worth
Code Chart 64# 15000
Project: Trinity"Trails Clear Fork
—East Bank Extension
Federal Highway Administration
CFDA#20.205
Not Research and Development
STATE OF TEXAS §
COUNTY OF TRAVIS §
LOCAL TRANSPORTATION PROJECT
ADVANCE FUNDING AGREEMENT
For a Transportation Enhancement (TE) Project
This Local Project Advance Funding Agreement (LPAFA) is made by and between the State
of Texas, acting by and through the Texas Department of Transportation, called the "State", and
the City of Fort Worth, acting by and through its duly authorized officials called the "Local
Government".
WITNESSETH
WHEREAS, a Master Agreement between the Local Government and the State has been
adopted and states the general terms and conditions for transportation projects developed
through this LPAFA; and,
WHEREAS, the Local Government prepared and submitted to the State a nomination form for
consideration under the Transportation Enhancement Program for the project which is briefly
described as Trinity Trails Clear Fork— East Bank Extension, called the Project; and
WHEREAS, the Texas Transportation Commission (the Commission) passed Minute Order
Number 113642 dated July 25, 2013 awarding funding for projects in the 2012 Program Call of
the Transportation Enhancement Program, including the Project; and
WHEREAS, the rules and procedures for the selection and administration of the Transportation
Enhancement Program are established in 43 TAC Sections 11.200 et seq.; and
WHEREAS, the governing body of the Local Government has approved entering into this LPAFA
by resolution or ordinance dated which is attached to and made a part of
this LPAFA as Attachment A;
NOW, THEREFORE, in consideration of the premises and of the mutual covenants and
agreements of the parties hereto, to be by them respectively kept and performed as hereinafter
m set forth, it is agreed as follows:
rn AGREEMENT
a
1. Period of the Agreement
CAM The period of this LPAFA is as stated in the Master Agreement, without exception.
0
.P OFFICIAL RE-CORD
Cilry SECRETARY
AFA—LPAFA TE Page 1 of 14
RECEIVED 10 W4
CSJ#: 0902-48-869, Fed. #: STP 2014(162)TE
District#02-Fort Worth
Code Chart 64# 15000
Project: Trinity Trails Clear Fork
—East Bank Extension
Federal Highway Administration
CFDA 420.205
Not Research and Development
2. Termination of this LPAFA
The termination of this LPAFA shall extinguish all rights, duties, obligations, and liabilities of
the State under this LPAFA. This LPAFA shall be terminated under the conditions as stated
in the Master Agreement or for the conditions, and in the manner, described in this LPAFA.
A. If the potential termination of the LPAFA is due to the failure of the Local Government to
fulfill its contractual obligations, the State will notify the Local Government that possible
breach of contract has occurred. The Local Government should make every effort to
remedy the breach within a period mutually agreed upon by both parties.
B. If the Local Government withdraws from the Project after the LPAFA is executed, it shall
be responsible for all direct and indirect Project costs as identified by the State's cost
accounting system.
C. A Project may be eliminated from the program as outlined below. If the Project is
eliminated for any of these reasons, this LPAFA will be appropriately terminated. A project
may be eliminated from the program if:
1. The Local Government fails to satisfy any requirements of the program rules cited as
43 TAC §11.200 et seq.
2. The implementation of the Project would involve significant deviation from the activities
as proposed in the nomination form.
3. The Local Government withdraws from participation in the Project.
4. This is a construction project and construction has not been let by August 31, 2016.
5. This is not a construction project and project activities have not been completed by
N/A
6. The State determines that federal funding may be lost due to the Project not being
implemented and completed.
7. Funds are not appropriated, in which case this LPAFA shall be terminated immediately
with no liability to either party. Payment under this LPAFA beyond the current fiscal
biennium is subject to availability of appropriated funds.
8. The Local Government fails to attend progress meetings at least twice yearly, as
scheduled by the State.
3. Amendments
Amendments of this LPAFA shall be made as described in the Master Agreement, without
exception.
4. Scope of Work, Use of Project, and Project Location
The scope of work for the Project, which is shown in Attachment B, the Project Location Map,
described in the nomination form and as approved by the Texas Transportation Commission,
consists of: Three improvements on the Trinity Trails Clear Fork— East Bank Extension from
Mistletoe Heights neighborhood to Parkview Avenue with Vickery Boulevard connection.
1. The development of an accessible trail on the east bank of the Trinity River from the
business and entertainment district adjacent Parkview Avenue to the Vickery Avenue
Bridge
AFA—LPAFA TE Page 2 of 14 Rev. 01/17/2014
CSJ#: 0902-48-869, Fed.#: STP 2014(162)TE
District#02-Fort Worth
Code Chart 64# 15000
Project: Trinity Trails Clear Fork
—East Bank Extension
Federal Highway Administration
CFDA#20.205
Not Research and Development
2. An accessible connection on the west bank of the Trinity River from the Vickery
Avenue Bridge to the existing trail
3. Modifications to the Vickery Bridge sidewalk and railing to meet current accessibility
and building code requirements
The purpose of this Transportation Enhancement project is to provide a safe accessible route
to the Trinity River trails system from the business and entertainment district, all area
residents will benefit from the less congested local roads with a reduction in vehicle emissions
and creating an opportunity for recreational use of commuting via non-motorized modes of
transportation.
Any project changes proposed must be submitted in writing by the Local Government to the
State. Changes may also require an amendment to the LPAFA and the approval of the
Federal Highway Administration (FHWA), the State, or the Commission. Any changes
undertaken without written approval and agreement amendment may jeopardize not only the
federal funding for the changes, but the federal funding of the entire Project.
5. Right of Way and Real Property Acquisition
Right of way and real property acquisition shall be the responsibility of the Local Government,
as stated in the Master Agreement unless otherwise provided below:
A. Right of way and real property acquisition shall be the responsibility of the Local
Government. Title to right of way and other related real property must be acceptable to the
State before funds may be expended for the improvement of the right of way or real
property. If the Local Government is the owner of any part of the Project site under this
LPAFA, the Local Government shall permit the State or its authorized representative
access to occupy the site to perform all activities required to execute the work.
B. The Local Government will comply with and assume the costs for compliance with all the
requirements of Title II and Title III of the Uniform Relocation Assistance and Real
Property Acquisition Policies Act of 1970, Title 42 U.S.C.A. Section 4601 et seq., including
those provisions relating to incidental expenses incurred by the property owners in
conveying the real property to the Local Government, and benefits applicable to the
relocation of any displaced person as defined in 49 CFR Section 24.2(g). Documentation
to support such compliance must be maintained and made available to the State and its
representatives for review and inspection.
C. The Local Government shall assume all costs and perform all work necessary to obtain
needed evidence of title or right of use in the name of the Local Government to the real
property required for development of the Project. The evidence of title or rights shall be
acceptable to the State, and be free and clear of all encroachments. The Local
Government shall secure and provide easements and any needed rights of entry over any
other land needed to develop the Project according to the approved Project plans. The
Local Government shall be responsible for securing any additional real property required
for completion of the Project.
D. The State will not reimburse the Local Government for any real property acquired before
execution of this LPAFA and before federal spending authority is approved.
AFA—LPAFA TE Page 3 of 14 Rev. 01/17/2014
CSJ#: 0902-48-869,Fed. #: STP 2014(162)TE
District#02-Fort Worth
Code Chart 64# 15000
Project: Trinity Trails Clear Fork
—East Bank Extension
Federal Highway Administration
CFDA#20.205
Not Research and Development
E. The Local Government shall prepare real property maps, property descriptions, and other
data as needed to properly describe the real property and submit them to the State for
approval prior to the Local Government acquiring the real property. Tracings of the maps
shall be retained by the Local Government for a permanent record.
F. The Local Government agrees to make a determination of property values for each real
property parcel to be purchased with federal funds by methods acceptable to the State
and to submit to the State a tabulation of the values so determined, signed by the
appropriate Local Government representative. The tabulations shall list the parcel
numbers, ownership, acreage, and recommended compensation. This tabulation shall be
accompanied by an explanation to support the determined values, together with a copy of
the documentation and reports used in calculating each parcel's value. Expenses incurred
by the Local Government in performing this work may be eligible for reimbursement after
the Local Government has received written authorization by the State to proceed with
determination of real property values. The State will review the data submitted and will
base its reimbursement for parcel acquisitions on these in determining the fair market
value.
G. Condemnation shall not be used to acquire real property for this enhancement Project.
H. Reimbursement for real property costs will be made to the Local Government for real
property purchased in an amount not to exceed eighty percent (80%) of the cost of the real
property purchased in accordance with the terms and provisions of this LPAFA.
Reimbursement will be in an amount not to exceed eighty percent (80%) of the State's
predetermined fair market value of each parcel, or the net cost of each parcel, whichever
is less. In addition, reimbursement will be made to the Local Government for necessary
payments to appraisers for expenses incurred in order to assure good title. Any costs
associated with the relocation of displaced persons and personal property, as well as
incidental expenses incurred in acquiring property to implement a TE project, will be the
responsibility of the Local Government and current property owner at no cost to the State.
I. If the Project requires the use of real property to which the Local Government will not hold
title, a separate agreement between the owners of the real property and the Local
Government must be executed prior to execution of this LPAFA. The separate agreement
must establish that the Project will be dedicated for public use for a period of time
commensurate with the federal investment, but not less than 10 (ten) years after
completion. The separate agreement must define the responsibilities of the parties as to
the use of the real property and operation and maintenance of the Project after
completion. The separate agreement must be approved by the State prior to its execution.
A copy of the executed separate agreement shall be provided to the State.
J. The Local Government agrees to execute individually or produce a legal document as
necessary to provide for the Project's continued use from the date of completion, and
agrees to cause the same to be recorded in the land records of the appropriate
jurisdiction.
K. Local governments receiving federal funds must retain an inventory of funded items and
monitor projects in accordance with 23 CFR 710 and 49 CFR 18, and with the procedures
provided in the State's Local Government Project Procedures manual.
AFA—LPAFA TE Page 4 of 14 Rev. 01/17/2014
CSJ#: 0902-48-869,Fed.#: STP 2014(162)TE
District#02-Fort Worth
Code Chart 64# 15000
Project: Trinity Trails Clear Fork
—East Bank Extension
Federal Highway Administration
CFDA#20.205
Not Research and Development
The Local Government agrees to monitor the Project to ensure: (1) continued use of the
property for approved activities, and (2) the repayment of the federal funds, as
appropriate.
1. The Local Government agrees to the review of their Project accounts and site visits by
the State during the development of the Project at any time;
2. Upon Project completion, the State will continue to perform periodic visits to confirm
the Project's continued use and upkeep.
L. Forty five (45) days prior to any construction contract let date, the Local Government shall
provide a certification to the State that all real property has been acquired.
6. Utilities
The Local Government shall be responsible for the adjustment, removal, or relocation of utility
facilities in accordance with applicable State laws, regulations, rules, policies, and
procedures, including any cost to the State of a delay resulting from the Local Government's
failure to ensure that utility facilities are adjusted, removed, or relocated before the scheduled
beginning of construction. The Local Government will not be reimbursed with federal or state
funds for the cost of required utility work, unless specified in the Transportation Enhancement
Nomination form and approved by the State. The Local Government must obtain advance
approval for any variance from established procedures. Before a construction contract is let,
the Local Government shall provide, at the State's request, a certification stating that the
Local Government has completed the adjustment of all utilities that must be adjusted before
construction begins.
7. Environmental Assessment and Mitigation
A. Environmental assessment and mitigation will be carried out as stated in the Master
Agreement, unless otherwise specified in the Transportation Enhancement Nomination
form and approved by the State. These costs will not be reimbursed or credited towards
the Local Government's financial share of the Project unless specified in the nominating
form and approved by the State.
B. Forty five (45) days prior to any construction contract let date, the Local Government shall
provide a certification to the State that all environmental problems have been remediated.
Additionally, before the advertisement for bids, the Local Government shall provide to the
State written documentation from the appropriate regulatory agency or agencies that all
environmental clearances have been obtained.
8. Architectural and Engineering Services
Architectural and engineering services will be provided by the Local Government.
Compliance with Texas Accessibility Standards and the Americans with Disabilities Act (ADA)
will be as stated in the Master Agreement. In procuring professional services, the parties to
this Agreement must comply with federal requirements cited in 23 CFR Part 172 if the Project
is federally funded and the Local Government will be seeking reimbursement for these
services; and with Texas Government Code 2254, Subchapter A, in all cases. Professional
services contracts for federally funded projects must conform to federal requirements.
AFA—LPAFA—TE Page 5 of 14 Rev. 01117/2014
CSJ#: 0902-48-869,Fed. #: STP 2014(162)TE
District#02-Fort Worth
Code Chart 64# 15000
Project: Trinity Trails Clear Fork
—East Bank Extension
Federal Highway Administration
CFDA#20.205
Not Research and Development
A. The architectural contract documents shall be developed in accordance with the standards
of the American Institute of Architects, the U.S. Secretary of the Interior's Standards for
Historic Preservation Projects, Standards and Guidelines for Archeology and Historic
Preservation, the National Register Bulletin Number 36: Guidelines for Evaluating and
Registering Historical Archeological Sites and in consultation with the State Historic
Preservation Officer, as applicable. The engineering plans shall be developed in
accordance with the State's applicable Standard Specifications for Construction and
Maintenance of Highways, Streets and Bridges and the two American Association of State
Highway Transportation Officials' (AASHTO) publications, "A Policy on Geometric Design
of Highways and Streets"and "Guide for the Development of Bicycle Facilities,"as
applicable. All contract procurement procedures and documents must adhere to the
applicable requirements established in the Standard Specifications for Construction and
Maintenance of Highways, Streets and Bridges. The use of other systems of specifications
shall be approved by the State in writing in advance.
B. When architectural and engineering services are provided by or through the Local
Government, the Local Government shall submit any plans it has completed to the State
for review and approval. The Local Government may also submit the plans to the State for
review anytime prior to completion. The Local Government shall make the necessary
revisions determined by the State. The Local Government will not let the construction
contract until all required plans have received State approval.
C. When architectural and engineering services are provided by or through the State, then
the following applies:
The State is responsible for the delivery and performance of any required architectural or
preliminary engineering work. The Local Government may review and comment on the
work as required to accomplish the Project purposes. The State will cooperate fully with
the Local Government in accomplishing these Project purposes to the degree permitted by
state and federal law.
9. Construction Responsibilities
A. The Local Government shall advertise for construction bids, issue bid proposals, receive
and tabulate the bids, and award and administer the contract for construction of the
Project. Administration of the contract includes the responsibility for construction
engineering and for issuance of any change orders, supplemental agreements,
amendments, or additional work orders that may become necessary subsequent to the
award of the construction contract. In order to ensure federal funding eligibility, projects
must be authorized by the State prior to advertising for construction.
B. All contract letting and award procedures must be approved by the State prior to letting
and award of the construction contract, whether the construction contract is awarded by
the State or by the Local Government.
C. All contract change order review and approval procedures must be approved by the State
prior to start of construction.
D. Upon completion of the Project, the party constructing the project will issue and sign a
"Notification of Completion" acknowledging the Project's construction completion.
AFA—LPAFA TE Page 6 of 14 Rev. 01/17/2014
CSJ#: 0902-48-869,Fed. #: STP 2014(162)TE
District#02-Fort Worth
Code Chart 64# 15000
Project: Trinity Trails Clear Fork
—East Bank Extension
Federal Highway Administration
CFDA#20.205
Not Research and Development
E. For federally funded contracts, the parties to this LPAFA will comply with federal
construction requirements cited in 23 CFR Part 635 and with requirements cited in 23 CFR
Part 633, and shall include the latest version of Form "FHWA-1273" in the contract bidding
documents. If force account work will be performed, a finding of cost effectiveness shall
be made in compliance with 23 CFR Part 635, Subpart B.
F. Any field changes, supplemental agreements, or revisions to the design plans that may
occur after the construction contract is awarded will be mutually agreed to by the State
and the Local Government prior to authorizing the contractor to perform the work. Prior to
completion of the Project, the party responsible for construction will notify the other party
to this LPAFA of the anticipated completion date. All parties will be afforded the
opportunity to assist in the final review of the construction services performed by the
contractor.
10. Project Maintenance
A. Upon completion of the Project the Local Government will be responsible for maintaining
the completed facility for public use. The property shall be maintained and operated for
the purpose for which it was approved and funded for a period of time commensurate with
the federal investment or State rules, whichever is greater. Should the Local Government
at any time after Project completion decide it can no longer maintain and operate the
Project for its intended purpose, the Local Government shall return the federal funds in
accordance with CFR federal recapture requirements. Should the Local Government
consider conveying the property, the State and FHWA must be notified prior to the sale,
transfer, or disposal of any property that received federal funds. Written concurrence of
approval for the transaction detailing any required recapture must be obtained from FHWA
prior to the transaction. Advance notice from the Local Government of their intended
action must be submitted to the State for an FHWA review a minimum of sixty (60) days
prior to any action being taken by the Local Government. The Local Government shall be
held responsible for reimbursement of all federal funds used or a portion of those funds
based on a pro-rata amount, considering the original percentage of federal funds provided
and the time elapsed from the Project completion date. This same percentage of
reimbursement also applies to any amount of profit that may be derived from the
conveyance of the property, as applicable.
B. Any manufacturer warranties extended to the Local Government as a result of the Project
shall remain in the name of the Local Government. The State shall not be responsible for
honoring any warranties under this LPAFA.
C. Should the Local Government derive any income from the development and operation of
the Project, a portion of the proceeds sufficient for the maintenance and upkeep of the
property, shall be set aside for future maintenance. A project income report shall be
submitted to the State on a quarterly basis. Monies set aside according to this provision
shall be expended using accounting procedures established under OMB-133 and with the
property management standards established in Title 49 CFR §18.32.
D. Should any historic properties be included in or affected by this federally funded Project,
the historic integrity of the property and any contributing features must continue to be
AFA—LPAFA TE Page 7 of 14 Rev. 01/17/2014
CSJ#: 0902-48-869,Fed.#: STP 2014(162)TE
District#02-Fort Worth
Code Chart 64# 15000
Project: Trinity Trails Clear Fork
—East Bank Extension
Federal Highway Administration
CFDA#20.205
Not Research and Development
preserved regardless of any approved changes that may occur throughout the life of the
Project.
11. Local Project Sources and Uses of Funds
A. A Project Budget Estimate is provided in Attachment C, showing the total estimated
development cost of the Project. This estimate shows the itemized cost of real property,
utilities, environmental assessments and remediation, construction, and any other
substantial items of cost. To be eligible for reimbursement, costs must have been
included in the itemized budget section of the nomination form approved by the Texas
Transportation Commission, The State and the Federal Government will not reimburse
the Local Government for any work performed before federal spending authority is formally
obligated to the Project by the Federal Highway Administration. After federal funds have
been obligated, the State will send to the Local Government a copy of the formal
documentation showing the obligation of funds including federal award information. The
Local Government is responsible for 100% of the cost of any work performed under its
direction or control before the federal spending authority is formally obligated.
B. If the Local Government will perform any work under this LPAFA for which reimbursement
will be provided by or through the State, the Local Government must complete training in
Local Government Procedures Qualification for the Texas Department of Transportation
before federal spending authority is obligated. Training is complete when at least one
individual who is working actively and directly on the Project successfully completes and
receives a certificate for the course entitled Local Government Project Procedures
Qualification for the Texas Department of Transportation. The Local Government shall
provide the certificate of qualification to the State. The individual who receives the training
certificate may be an employee of the Local Government or an employee of a firm that has
been contracted by the Local Government to perform oversight of the Project. The State
in its discretion may deny reimbursement if the Local Government has not designated a
qualified individual to oversee the Project.
C. A Source of Funds estimate based on the budget provided in the project nomination form
is included as Attachment C. Attachment C shows the percentage and estimated dollar
amounts to be contributed to the Project by state and local sources, as well as the
maximum amount in federal Transportation Enhancement Funds assigned by the
Commission to the project. The parties agree that this agreement may be amended from
time to time as required to meet the funding commitments based on revisions to the
Transportation Improvement Program, FPAA, or other federal document.
D. The Local Government will be responsible for all non-federal participation costs associated
with the Project, including any overruns in excess of the Project cost estimate and any
operating or maintenance expenses.
E. The State will be responsible for securing the federal share of funding required for the
development and construction of the Project, in an amount not to exceed seventy one
point two percent ( 71.2%) of the actual cost of the work up to the amount of funds
approved for the Project by the Texas Transportation Commission. Federal funds will be
reimbursed on a cost basis. Project costs incurred prior to Project selection by the Texas
AFA—LPAFA—TE Page 8 of 14 Rev. 01/17/2014
CSJ#: 0902-48-869,Fed. #: STP 2014(162)TE
District#02-Fort Worth
Code Chart 64# 15000
Project: Trinity Trails Clear Fork
—East Bank Extension
Federal Highway Administration
CFDA#20.205
Not Research and Development
Transportation Commission and approval by the State to proceed are not eligible for
reimbursement.
F. Following execution of this LPAFA, but prior to the performance of any review work by the
State, the Local Government will pay to the State the amount sufficient to cover the
estimated cost for the State's review. The Local Government shall advance to the State
twenty eight point eight percent ( 28.8%) of the State's administrative and associated cost
for review of the plans, specifications, and estimate. The Local Government must also
advance to the State zero percent (0%) of the Project's estimated preliminary engineering
cost, if the State is administering the architectural or engineering contract. The estimated
amount of this advance for this Project's preliminary engineering is $$92,981 , in cash. At
least sixty (60) days prior to the date set for receipt of the construction bids, the Local
Government must advance to the State twenty eight point eight percent ( 28.8%) of the
State's administrative and associated costs for letting and construction. The Local
Government shall also remit its remaining financial share for the Project's estimated
construction and construction engineering costs if the State is letting the project. The
amount to be advanced for this Project's Construction is estimated to be $$23,244 , in
cash.
G. In the event the State determines that additional funding is required by the Local
Government at any time during the development of the Project, the State will notify the
Local Government in writing. The Local Government is responsible for twenty eight point
eight percent ( 28.8%) of the authorized Project cost and one hundred percent (100%) of
any overruns above the federally authorized amount. The Local Government will make
payment to the State within thirty (30) days from receipt of the State's written notification.
H. Whenever funds are paid by the Local Government to the State under this LPAFA, the
Local Government shall remit a check or warrant made payable to the "Texas Department
of Transportation Trust Fund." The check or warrant shall be deposited by the State in an
escrow account to be managed by the State. Funds in the escrow account may only be
applied by the State to the Project.
I. Upon completion of the Project, the State will perform an audit of the Project costs. Any
funds due to the Local Government, the State, or the Federal Government will be promptly
paid by the owing party. If, after final Project accounting, excess funds remain in the
escrow account, those funds may be applied by the State to the Local Government's
contractual obligations to the State under another advance funding agreement with
approval by appropriate personnel of the Local Government.
J. In the event the Project is not completed, the State may seek reimbursement from the
Local Government of the expended federal funds. The Local Government will remit the
required funds to the State within sixty (60) days from receipt of the State's notification.
K. If any existing or future local ordinances, commissioners court orders, rules, policies, or
other directives, including but not limited to outdoor advertising billboards and storm water
drainage facility requirements, are more restrictive than state or federal Regulations, or if
any other locally proposed changes, including but not limited to plats or re-plats, result in
increased costs, then any increased costs associated with the ordinances or changes will
be paid by the Local Government. The cost of providing right of way acquired by the State
shall mean the total expenses in acquiring the property interests either through
AFA—LPAFA TE Page 9 of 14 Rev. 01/17/2014
CSJ#: 0902-48-869,Fed. #: STP 2014(162)TE
District#02-Fort Worth
Code Chart 64# 15000
Project: Trinity Trails Clear Fork
—East Bank Extension
Federal Highway Administration
CFDA#20.205
Not Research and Development
negotiations or eminent domain proceedings, including but not limited to expenses related
to relocation, removal, and adjustment of eligible utilities.
L. The state auditor may conduct an audit or investigation of any entity receiving funds from
the State directly under this LPAFA or indirectly through a contract or subcontract under
this LPAFA. Acceptance of funds directly under this LPAFA or indirectly through a
contract or subcontract under this LPAFA acts as acceptance of the authority of the state
auditor, under the direction of the legislative audit committee, to conduct an audit or
investigation in connection with those funds. An entity that is the subject of an audit or
investigation must provide the state auditor with access to any information the state
auditor considers relevant to the investigation or audit.
M. The State will not pay interest on any funds provided by the Local Government.
N. The State will not execute the contract for the construction of the Project until the required
funding has been made available by the Local Government in accordance with this
LPAFA.
O. The Local Government is authorized to submit requests for reimbursement by submitting
the original of an itemized invoice in a form and containing all items required by the State
no more frequently than monthly, and no later than ninety (90) days after costs are
incurred. If the Local Government submits invoices more than ninety (90) days after the
costs are incurred, and if federal funding is reduced as a result, the State shall have no
responsibility to reimburse the Local Government for those costs.
12. Inspection of Books and Records
The parties to this LPAFA shall maintain all books, documents, papers, accounting records,
and other documentation relating to costs incurred under this LPAFA and shall make such
materials available to the State, the Local Government, and, if federally funded, the Federal
Highway Administration (FHWA), and the U.S. Office of the Inspector General, or their duly
authorized representatives for review and inspection at its office during the agreement period
and for four (4) years from the date of completion of work defined under this LPAFA or until
any impending litigation, or claims are resolved. Additionally, the State, the Local
Government, and the FHWA and their duly authorized representatives shall have access to all
the governmental records that are directly applicable to this LPAFA for the purpose of making
audits, examinations, excerpts, and transcriptions.
13. Cost Principles
In order to be reimbursed with federal funds, the parties shall comply with the Cost Principles
established in OMB Circular A-87 that specify that all reimbursed costs are allowable,
reasonable, and allocable to the Project.
14, Lobbying Certification
The parties to this LPAFA reaffirm that no federal funds were used to lobby for Project funds,
but that if any lobbying occurred, it has been reported to the State, pursuant to the
requirements of the Master Agreement.
AFA—LPAFA TE Page 10 of 14 Rev. 01/17/2014
CSJ#: 0902-48-869,Fed.#: STP 2014(162)TE
District#02-Fort Worth
Code Chart 64# 15000
Project; Trinity Trails Clear Fork
—East Bank Extension
Federal Highway Administration
CFDA#20.205
Not Research and Development
15. Document and Information Exchange
The Local Government agrees to electronically deliver to the State all general notes,
specifications, contract provision requirements and related documentation in a Microsoft®
Word or similar format. If requested by the State, the Local Government will use the State's
document template. The Local Government shall also provide a detailed construction time
estimate including types of activities and month in which the activity will be completed in the
format required by the State. This requirement applies whether the Local Government
creates the documents with its own forces or by hiring a consultant or professional provider.
At the request of the State, the Local Government shall submit any information required by
the State in the format directed by the State.
16. Incorporation
The Master Agreement is incorporated into this LPAFA as if fully set forth in this LPAFA.
17. Insurance
If this LPAFA authorizes the Local Government or its contractor to perform any work on State
right of way, before beginning work, the entity performing the work shall provide the State with
a fully executed copy of the State's Form 1560 Certificate of Insurance verifying the existence
of coverage in the amounts and types specified on the Certificate of Insurance for all persons
and entities working on State right of way. This coverage shall be maintained until all work on
the State right of way is complete. If coverage is not maintained, all work on State right of
way shall cease immediately, and the State may recover damages and all costs of completing
the work.
18. Debarment Certification
The parties are prohibited from making any award at any tier to any party that is debarred or
suspended or otherwise excluded from or ineligible for participation in Federal Assistance
Programs under Executive Order 12549, "Debarment and Suspension." By executing this
LPAFA, the Local Government certifies that it and its principals are not currently debarred,
suspended, or otherwise excluded from or ineligible for participation in Federal Assistance
Programs under Executive Order 12549, and further certifies that it will not do business with
any party, to include principals, that is currently debarred, suspended, or otherwise excluded
from or ineligible for participation in Federal Assistance Programs under Executive Order
12549. The parties to this LPAFA shall require any party to a contract, subcontract, or
purchase order awarded under this LPAFA to certify its eligibility to receive federal funds and,
when requested by the State, to furnish a copy of the certification.
19. Civil Rights Compliance
The Local Government shall comply with the regulations of the U.S. Department of
Transportation as they relate to non-discrimination (49 CFR Part 21 and 23 CFR Part 200),
and Executive Order 11246 titled "Equal Employment Opportunity," as amended by Executive
Order 11375 and supplemented in the Department of Labor Regulations (41 CFR Part 60).
AFA—LPAFA—TE Page 11 of 14 Rev. 01/17/2014
CSJ#: 0902-48-869,Fed. #: STP 2014(162)TE
District#02-Fort Worth
Code Chart 64# 15000
Project: Trinity Trails Clear Fork
—East Bank Extension
Federal Highway Administration
CFDA#20.205
Not Research and Development
20. Disadvantaged Business Enterprise Program Requirements
A. The parties shall comply with the Disadvantaged Business Enterprise Program
requirements established in 49 CFR Part 26.
B. The Local Government shall adopt, in its totality, the State's federally approved DBE
program.
C. The Local Government shall set an appropriate DBE goal consistent with the State's DBE
guidelines and in consideration of the local market, project size, and nature of the goods or
services to be acquired. The Local Government shall have final decision-making authority
regarding the DBE goal and shall be responsible for documenting its actions.
D. The Local Government shall follow all other parts of the State's DBE program referenced
in TxDOT Form 2395, Memorandum of Understanding Regarding the Adoption of the
Texas Department of Transportation's Federally-Approved Disadvantaged Business
Enterprise by Entity, and attachments found at web address
http://ftp dot state tx us/pub/txdot-info/bop/dbe/mou/mou attachments.pdf.
E. The Local Government shall not discriminate on the basis of race, color, national origin, or
sex in the award and performance of any U.S. Department of Transportation (DOT)-
assisted contract or in the administration of its DBE program or the requirements of 49
CFR Part 26. The Local Government shall take all necessary and reasonable steps under
49 CFR Part 26 to ensure non-discrimination in award and administration of DOT-assisted
contracts. The State's DBE program, as required by 49 CFR Part 26 and as approved by
DOT, is incorporated by reference in this LPAFA. Implementation of this program is a
legal obligation and failure to carry out its terms shall be treated as a violation of this
LPAFA. Upon notification to the Local Government of its failure to carry out its approved
program, the State may impose sanctions as provided for under 49 CFR Part 26 and may,
in appropriate cases, refer the matter for enforcement under 18 U.S.C. 1001 and the
Program Fraud Civil Remedies Act of 1986 (31 U.S.C. 3801 et seq.).
F. Each contract the Local Government signs with a contractor (and each subcontract the
prime contractor signs with a sub-contractor) must include the following assurance: The
contractor, sub-recipient, or sub-contractor shall not discriminate on the basis of race,
color, national origin, or sex in the performance of this contract. The contractor shall carry
out applicable requirements of 49 CFR Part 26 in the award and administration of DOT-
assisted contracts. Failure by the contractor to carry out these requirements is a material
breach of this agreement, which may result in the termination of this agreement or such
other remedy as the recipient deems appropriate.
21. Federal Funding Accountability and Transparency Act Requirements
A. Any recipient of funds under this agreement agrees to comply with the Federal Funding
Accountability and Transparency Act (FFATA) and implementing regulations at 2 CFR Part
170, including Appendix A. This agreement is subject to the following award terms:
http://www.qpo.gov/fdsys/pkq/FR-2010-09-14/pdf/2010-22705,pd and
http:/Iwww.qpo.gov/fdsys/pkq/FR-2010-09-14/pdf/2010-22706.pdf.
B. The Local Government agrees that it shall:
1. Obtain and provide to the State a Central Contracting Registry (CCR) number (Federal
Acquisition Regulation, Part 4, Sub-part 4.1100) if this award provides for more than
AFA—LPAFA TE Page 12 of 14 Rev. 01117/2014
CSJ#: 0902-48-869,Fed. #: STP 2014(162)TE
District#02-Fort Worth
Code Chart 64# 15000
Project: Trinity Trails Clear Fork
—East Bank Extension
Federal Highway Administration
CFDA#20.205
Not Research and Development
$25,000 in Federal funding. The CCR number may be obtained by visiting the CCR
web-site whose address is: https://www.sam.gov/portal/public/SAM/;
2. Obtain and provide to the State a Data Universal Numbering System (DUNS) number,
a unique nine-character number that allows the federal government to track the
distribution of federal money. The DUNS number may be requested free of charge for
all businesses and entities required to do so by visiting the Dun & Bradstreet (D&B) on-
line registration website http://fed.gov,dnb.com/webform; and
3. Report the total compensation and names of its top five (5) executives to the State if:
i. More than 80% of annual gross revenues are from the Federal government, and
those revenues are greater than $25,000,000; and
ii. The compensation information is not already available through reporting to the
U.S. Securities and Exchange Commission.
22. Single Audit Report
A. The parties shall comply with the requirements of the Single Audit Act of 1984, P.L. 98-
502, ensuring that the single audit report includes the coverage stipulated in OMB Circular
A-133.
B. If threshold expenditures of$750,000 or more are met during the Local Government's
fiscal year, the Local Government must submit a Single Audit Report and Management
Letter (if applicable) to TxDOT's Audit Office, 125 East 11th Street, Austin, TX 78701 or
contact TxDOT's Audit Office at http://www.txdot.gov/inside-txdot/office/audit/contact.html.
C. If expenditures are less than $750,000 during the Local Government's fiscal year, the
Local Government must submit a statement to TxDOT's Audit Office as follows: "We did
not meet the $750,000 expenditure threshold and therefore, are not required to have a
single audit performed for FY "
D. For each year the project remains open for federal funding expenditures, the Local
Government will be responsible for filing a report or statement as described above. The
required annual filing shall extend throughout the life of the LPAFA, unless otherwise
amended or the project has been formally closed out and no charges have been incurred
within the current fiscal year.
23. Signatory Warranty
Each signatory warrants that the signatory has necessary authority to execute this agreement
on behalf of the entity represented.
AFA—LPAFA TE Page 13 of 14 Rev. 01/17/2014
CSJ#: 0902-48-869,Fed. #: STP 2014(162)TE
District#02-Fort Worth
Code Chart 64# 15000
Project: Trinity Trails Clear Fork
—East Bank Extension
Federal Highway Administration
CFDA #20.205
Not Research and Development
THIS AGREEMENT IS EXECUTED by the State and the Local Government in duplicate.
THE LOCAL GOVERNMENT of F
° N ty ort Worth
ATTEST: �So
it �, Alanis
y Secr s
°°°°°° � ssistant City Manager
S
APPROVED TO FORM AND LEGALIT APPROVAL REC
By By
Assistant City Attorney chard Zavala
Di ector
�►1�c C, Parks and Community Services Department
Date: Co Z-c
Y-5
THE S F EXA
�Kenneth Stewart
Interim Director of Contract Services
Texas Department of Transportation
Date
OFFICIAL RECORD
cl�s�cR�ix
AFA—LPAFA TE Page 14 of 14 Rev. 01/17/2014
CS1#: 0902-48-869, Fed. #: STP
2014(162)TE
District#02-Fort Worth
Code Chart 64# 15000
Project: Trinity Trails Clear Fork
—East Bank Extension
Federal Highway Administration
CFDA#20.205
Not Research and Development
ATTACHMENT A
RESOLUTION OF LOCAL GOVERNMENT
APPROVING THIS LPAFA
AFA—LPAFA TE Page 1 of 1 Attachment A
A Resolution
NO. 4341-08-2014
A RESOLUTION AUTHORIZING THE EXECUTION OF A LOCAL
PROJECT ADVANCE FUNDING AGREEMENT WITH THE TEXAS
DEPARTMENT OF TRANSPORTATION (TxDOT) FOR THE DESIGN AND
CONSTRUCTION OF THE TRINITY TRAILS CLEAR FORK - EAST
BANK EXTENSION PROJECT
WHEREAS, the Transportation Enhancement Program, administered by the Texas
Department of Transportation, provides funding for the purpose of expanding
transportation choices and enhancing the transportation experience; and
WHEREAS, the City of Fort Worth applied for, and was awarded funding for the
Trinity Trails Clear Fork - East Bank Extension Project (the "Project") through the
Transportation Enhancement Program; and
WHEREAS, the City of Fort Worth desires to enter into a Local Project Advance
Funding Agreement with the Texas Department of Transportation for the division of costs
and responsibilities associated with the design and construction of the Project.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF FORT WORTH, THAT:
The City Manager is authorized to execute a Local Transportation Project Advance
Funding Agreement with the Texas Department of Transportation to share the costs and
responsibilities associated with the design and construction of the Trinity Trails Clear
Fork -East Bank Extension Project.
�.Qba'nt11i
Adopted this 51h day of August, 2014. pAy 000k00
p
Go'a 0 o po®
o %0.0,
ATTEST: �$ °$
S
� Quo 0�p
m4 J. ays VSeecra&ry X oaXY
RTWO
Trinity Park
�. i
4 - ' Proposed On-Street
J Trailhead Parking A.
Proposed Trail 4 t
Exis[ing Trinity Trails a (Approx.2,150LF} *. * '
¢ # 4R:
Ap
_ Vickery Bridge
l— 31 Dedicated Bicycle Lanes '
:- ,(to be completed in 201 ) t.
_frt
«E Prgoased Apprwch to
Vickery Bridge r
r
A, _
Mistletoe Heights North
Bicycle and Pedestrian Connection
0 100 200 400 goo Feet
City of Fort Worth, Texas
Mayor and Council Communication
COUNCIL ACTION: Approved on 8/512014 - Resolution No. 4341-08-2014 & Ordinance No.
21362-08-02014
DATE: Tuesday, August 05, 2014 REFERENCE NO.: G-18275
LOG NAME: 802012 STEP AFA EAST BANK TRAIL
SUBJECT:
Adopt Resolution Authorizing the Execution of a Local Project Advance Funding Agreement with the Texas
Department of Transportation for Construction of the Trinity Trails Clear Fork- East Bank Extension Project
in the Amount of$3,026,007.00 with Local Participation in the Amount of$870,007.00, Authorize Initial
Payment to Texas Department of Transportation in the Amount of$92,981.00 for Direct State Costs and
Adopt Appropriation Ordinance (COUNCIL DISTRICT 9)
RECOMMENDATION:
It is recommended that the City Council:
1. Adopt the attached resolution authorizing the City Manager to execute a Local Project Advance
Funding Agreement with the Texas Department of Transportation for a Transportation Enhancement
Program-Trinity Trails Clear Fork- East Bank Extension Project in the amount of$3,026,007.00 with
local participation in the amount of$870,007.00;
2. Authorize the acceptance in the amount of$2,156,000.00 in federal funds contributing to the
Transportation Enhancement Program Neighborhood Transportation Connections for Pedestrians and
Bicycles Project through Texas Department of Transportation;
3. Authorize the transfer of$870,007.00 from the SH121T Southwest Parkway Fund to the Grant Fund
towards the City's match;
4. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the
Grants Fund in the amount of$3,026,007.00; and
5. Authorize an initial payment to Texas Department of Transportation in the amount of$92,981.00 for
direct state costs in accordance to the Agreement.
DISCUSSION:
The purpose of this Mayor and Council Communication (M&C) is to adopt a Resolution authorizing the
City Manager to execute a Local Project Advance Funding Agreement(LPAFA)with the Texas
Department of Transportation (TxDOT). The LPAFA details the responsibilities of both the City and
TxDOT in the development of the project. This M&C also authorizes acceptance of federal grant funds,
transfer of funds to serve as the City's match and adoption of the appropriation ordinance for the project.
TxDOT issued a Call-for-Projects on October 12, 2012, under the federal Transportation Enhancement
(TE) Program. The TE Program is unique in that ft emphasizes the development of non-tradrtronat
transportation projects. This is an 80 percent federally funded cost-reimbursement program with a
Logame: 802012 STEP AFA EAST SANK TRAIL Page 1 of 2
minimum 20 percent local match.
On November 12, 2012, (M&C G-17737)the City Council authorized the City Manager to submit an
application for funding for the Neighborhood Transportation Connections for Pedestrian and Bicycles
Project. On July 26, 2013, TxDOT notified the City of Fort Worth that the Trinity Trails Clear Fork-East
Bank Extension Project was selected for funding.
The Trinity Trails Clear Fork-East Bank Extension provides an off-street trail connection from the
Mistletoe Heights neighborhood north to a new on-street tralihead at Parkview Drive. The ultimate goal is
to continue this trail to the north to the newly constructed Rotary Trailhead on the east bank of the Trinity
River where it connects with the Phyllis Tilley Memorial Bridge. Additionally, this connection will create
off-street access to Parkview Drive. This connection will also provide access',to a future barrier separated
bike lane on the Vickery bridge which is being constructed as part of the Chisholm Trail Parkway. This
trail extension was included in the Trinity River Vision Neighborhood and Recreation Enhancement Plan
which was adopted by City Council on August 4, 2009(M&C G-16638).
The local match in the amount of$870,007.00 will be allocated from the 2004;,Capital Improvement
Program for the Chisholm Trail Parkway, programmed as part of the original project scope for
enhancements to the Trinity River corridor in the vicinity of the Chisholm Trail,Parkway.
This project is located in COUNCIL DISTRICT 9.
FISCAL INFORMATION I CERTIFICATION:
The Financial Management Services Director certifies that upon approval of the above recommendations
and adoption of the attached appropriation ordinance,funds will be available in the current capital budget,
as appropriated, of the Grant Fund.
FUND CENTERS:
TO Fund/Account/Centers FROM Fund/Account/Centers
2)4)GR74 451942 080302739000 $2156.000.00 3)0221 538070 809500215680 $870.007.00
3141 GR74 472221 080302738004 $870.007.00 51 GR74 539120 06OXXXXXXXXX $92.981,00
41 GR74 5XXXXX 01B0302739XXX $3.026.607.00
CERTIFICATIONS:
Submitted for Ciiy Manager's Office by: Susan Alanis (8180)
Originating Department Head: Richard Zavala (5711)
Additional Information Contact: David Creek (5744)
I
Logname: 802012 STEP AF'-EAST BANK TRAIL Page 2 of 2
CSJ#: 0902-48-869,Fed.#: STP
2014(162)TE
District#02-Fort Worth
Code Chart 64# 15000
Project: Trinity Trails Clear Fork
—East Bank Extension
Federal Highway Administration
CFDA#20.205
Not Research and Development
ATTACHMENT B
PROJECT LOCATION MAP
u a F apased Cin-Street
rk
Trailhead Parking
�p
`. °... •. C.tS'te�Enter[a.n rr enters
Existing Trinity Tra=1S
c
T
a
� 4
a °` (JtpProx.3,QiJ0 LF) � :'
T
F
r
Vcckery fridge
q�edicated$icyde lanes
mmpl.t.a in 2014)
-
* ems_
x
P,aaposed Approach to
Vickery Ondge
S � i
Trinity Trails Clear Fork —
�
Project lnforraton -
East Bank Extension
AFA—LPAFA—TE Page 1 of 1 Attachment B
o O c
b r 09
a O O 3 o0 N 000 O O ��, U
O O O Ol Q O cu
s9 x s� � 00 -T
6A 69 69 N
U o o �
U 0 N o O O 00 00 00 00 U
CA
S'-+
O
O cd
O y, c3 po C1+
M °
(� CO 0. O O O ^C O jj�i11 U
N Z h «+ U 46 69 u s°s Qn V)
o
LL V Pr q •O o r
LL 0
cl
G. x °
W \
E
o o
�' U +.
cn w a � Wao
V (n .a .7 moo ° v o o
>
Z Z o o `O «. d o Q � �° k
� Q Q W Q v .a a�i o a .° in in ° 0 N
cl,w 0� cd > o°4.
N U kn C N N
00 p k o o a s ° ff�r . , � R o O
N
pO � E� W ° M QF gip; = � � ca
C7, I x F- N °o o o E o o ao
c� • o o w o C' rj '" G o o o ^Q i A o oo
4.
UL Ua+ wUZ Owx � F �
00 b
o
0 W W II °o °o F o° a o _� °o C rn
Q M at N N 000
N
kn y� N °" V �O O � 69
61. 6e
C� n bA T3
O O
CO
v 42 v Q v '+ r C� a�
^o cl a V d p o
t e0 R u 0
O°
Cd V
Cd
a � � V
o d ° ,°� a a o p = V U H E QI
Q
� H
Q
LL
a ID
Y o
(D m
E o v
a
-0 U
U N
o
yo a,boo
> r
° a o
bA C7 03 `�
O a> v °
H o o CCI o CD
� o o v'
k a`di ::3' v a U O 6 w
-o U
o W w
v1 cd
N NO 'r. to
cl (Is
o U U U I Q 0 0
US or-S U
C>
CD
N 00
cn
O �
N �
N
'L7 C O
cu
d O
UN
cYd � N
a a
U .
O �
40. a F LL
s., Q
U O
G 'cJ Q
O