HomeMy WebLinkAboutContract 29015 AMENDMENT NO. 4
STATE OF TEXAS b CITY SECRETARY CONTRACT NO. (01S
(No M&C Needed)
COUNTY OF TARRANT S
WHEREAS, the City of Fort Worth (City) and Dunaway Associates,
Inc. (Engineer) made and entered into City Secretary Contract No.
26599, (the Contract) which was authorized by the City Council by M&C
C-18456 on the 13th day of February 2001 , and subsequently revised by
three previous amendments; and
WHEREAS, the Contract involves engineering services for the fol-
lowing project:
Engineering contract for the design of Sanitary Sewer Main M-1-1-1
Condition Assessment and Drainage Area Evaluation Study
WHEREAS, it has become necessary to execute Amendment No. 4 to
said Contract to include .an increased scope of work and revised maximum
fee;
NOW THEREFORE , City and Engineer, acting herein by and through
their duly authorized representatives, enter into the following agree-
ment which amends the Contract:
1 .
Article I of the Contract is amended to include the additional en-
gineering services specified, in a proposal letter dated July 28, 2003,
a copy of which is attached hereto and incorporated herein. The cost to
City for the additional design services to be performed by Engineer to-
tal $17,900 .00.
2.
Article II of the Contract is amended to provide for an increase
in the maximum fee to be paid to Engineer for all work and services
performed under the Contract, as amended, so that the total fee paid by
the City for all work and services shall not exceed the sum of
$866,670.73. - — ORIGINAL
3.
All other provisions of the Contract which are not expressly
amended herein shall remain in full force and effect.
EXECUTED on this the 444""' day of ,
2003, in Fort Worth, Tarrant County, Texas.
ATT
'ontraCt Authorization
Gloria Pear on, City Secretary
aa�a+
APPROVAL RECOMMENDED: APPROVED:
Ain J(�LAA T"Mwy�4��
A. Douglas Rademaker, P.E . Marc A. t
Director, Department of Assistant ity Manager
Engineering
DUNAWAY ASSOCIATES, INC.
ENGINE
BY:
Name:Brian S. Darby, P.E.
Associate
1501 Merrimac Circle, Suite 100
Fort Worth, TX 76107
APPROVED AS TO FORM AND LEGALITY:
Gary Steinberger
Assistant City Attorney
DUNAWAY ASSOCIATES, INC.
ENGINEERS • PLANNERS • SURVEYORS
DAI No. 2000181
July 28, 2003
Mr. Mike Domenech, P.E.
City of Fort Worth
Department of Engineering
1000 Throckmorton
Fort Worth, Texas 76102
Reference: Amendment No. 4- Revised
Sanitary Sewer Main M-1-1-1
Condition Assessment and Drainage Area Evaluation Study
Sewer Project No. PS 170-070170410020
Water. Project No. PW 162-060162141020
D.O.E. No. 3783
Dear Mr. Domenech:
Dunaway Associates Inc. is pleased to present Amendment No. 4 for the following additional
services that are beyond our original scope of services.
M-1-1-1 Phase 1
• Coordination and revisions to water line for TPW improvements to 4tI' and 51' Streets.
• Coordination and revisions for Environmental Management Department issues.
• Re-advertisement of after canceling bid opening to accommodate the Fort Worth Cats season
schedule.
o Revisions and updates
o Reproduction
A summary of the proposed budget for this amendment is as follows:
Fee
TPW Coordination and revisions $ 8,000.00
Environmental Coordination and revisions $ 2,000.00
Re-advertisement
Revisions& updates ' • $ 2,500.00
Reproduction $ 5,400.00
TOTAL PROPOSED AMENDMENT $ 17,900.00
1501 MERRIMAC CIRCLE • SUITE 100 • FORT WORTH,TEXAS 76107-6572 • (817)335-1121 • METRO(817)429-2135 • FAX(817)335-7437
• Amendment No. 4
July 28, 2003
Page 2
A summary of the total project fees is as follows:
Contract Description Fee
Original Contract SSES Evaluation $ 509,997.13
Amendment No. 1 Perform Boundary Survey Services for $ 14,000.00
platting
Amendment No. 2 Design of 14,536 LF of Sewer&Water $ 299,831.40
Improvements
Amendment No. 3 Calhoun Waterline, & Phase 1 $ 24,942.20
Amendment No.4 TPW& Environmental Coordination & $ 17,900.00
Revision and Re-advertisement
TOTAL PROJECT $ 866,670.73
Please review the enclosed information and do not hesitate to call me if you have any questions or
require additional information regarding this amendment.
Sincerely,
DUNAWAYSS= TES, INC.
Brian S. Darby, P.E.
Associate
2000 1 8 1 0 2 LtrAmend#4 MDomenech 03-0728 BSD.doc
FORT WORTH
MEMORANDUM
TO: A. Douglas R.ademaker, Director, DOE and
Marc A. Ott, Assistant City Manager
%
FROM: Miguel A. Domenech, P.E., DOE
Project Manager
DATE: August 8, 2003
RE: DESIGN FEE AMENDMENT NO. 4 TO SANITARY SEWER MAIN M-1-1-1
CONDITION ASSESSMENT AND DRAINAGE AREA EVALUATION STUDY
SEWER PROJECT NO. PS170-070170410020
WATER PROJECT NO. PW162-060162141020
DOE NO. 3783
The proposed amendment will allow Dunaway Associates, Inc., to provide engineering services on the
project as requested by the City.
As requested by staff, Dunaway Associates, Inc., will provide the necessary redesign services to incor-
porate water line changes to accommodate T&PW proposed pavement improvements on 4`h and 5`h
Streets and Commerce Street. The revisions are also to include the changes necessary to address envi-
ronmental issues as the project location contains environmental monitoring zones. This amendment will
also allow for the plans and specifications to be revised to include the most recent City standards. The
project was ready for advertisement in December 2002. However, in order to avoid interference with the
baseball season on La Grave Field, the project was delayed until now.
Dunaway Associates, Inc., has requested the amount of$17,900.00 for the additional services, thereby
increasing the contract fee from $848,770.73 to $866,670.73. I believe this fee is fair and reasonable for
the additional services to be provided.
Please authorize the additional design fee by your signatures on the attached contract amendment form.
Miguel A. Domenech, P.E.
Attachment
cc: Tony Sholola, P.E., Program Manager
Berdena Hamilton, Water Department
Dan Pepon, Water Department
ENGINEERING DEPARTMENT