HomeMy WebLinkAboutContract 29016 AMENDMENT NO. 3
STATE OF TEXAS $ CITY SECRETARY CONTRACT NO. C `-1 0
(No M&C Needed)
COUNTY OF TARRANT $
WHEREAS, the City of Fort Worth (City) and Half Associates,
Inc. (Engineer) made and entered into City Secretary Contract No.
27583, (the Contract) which was authorized by the City Council by
M&C C-18565 on the 19th day of March, 2002 and subsequently
revised by two previous amendments; and
WHEREAS, the Contract involves engineering services for the
following project:
Sanitary Sewer Rehabilitation Contract LXIV (64)
WHEREAS, it has become necessary to execute Amendment No. 3
to said Contract to include an increased scope of work and revised
maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and
through their duly authorized representatives, enter into the
following agreement which amends the Contract:
1.
Article I of the Contract is amended to include the
additional engineering services specified in a proposal letter
dated July 21, 2003, a copy of which is attached hereto and
incorporated herein. The cost to City for the additional design
services to be performed by Engineer total $8, 110 . 00
2 .
Article II of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work
and services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall not
exceed the sum of $245, 870
vY
ORIGINAL
3 .
All other provisions of the Contract which are not expressly amended
herein shall remain in full force and effect.
A � -
EXECUTED on this the day of
2003, in Fort Worth, Tarrant County, Texas.
ATTEP
b
Contract Authorization
Gloria Pearson, City Secretary
Date
APPROVED: A OV
A. Douglas Rademaker, P.E. Marc',Ott L
Director, Department of Assistant �ity Manager
Engineering
Halff Associates, Inc .
ENGINEER
By:
Name: Michael A. Mova, P.E
Vice President
4000 Fossil Creek Blvd.
Fort Worth TX 76137
APPROVED AS TO FORM AND LEGALITY:
Gary Stei. erger
Assistant City Attorney
ENG1.FRM(NO M&C)
-2-
�1
4000 FOSSIL CREEK BOULEVARD
Halff AFORT WORTH,TEXAS 76137
(817)847-1422 METRO(817)429-9975
FAX(817)232-9784
ENGINEERS • ARCHITECTS - SCIENTISTS
PLANNERS - SURVEYORS
July 21,2003
AVO 20495
Mr. Rakesh Chaubey, P.E.
City of Fort Worth
Department of Engineering
1000 Throckmorton
Fort Worth,Texas 76102
Re: Amendment No. 3 - Sanitary Sewer Rehabilitation Contract XLIV(64)
DOE No. 3454— Parts l & 2
Dear Mr. Chaubey:
Halff Associates is pleased to present this Amendment No. 3 for preparation of Storm Water Pollution
Prevention Plans (SWPPP) for Contract LXIV (64) Part 1 and Part 2. Amendment No. 3 shall include the
following additional services:
• Storm Water Pollution Prevention Plan Part l
o General Overall SWPPP document, including general instructions, required permits and
forms, erosion control details, and site-specific erosion control sheets (1 1"x17"). Part 1
Erosion Control Sheets shall include: L-1976, L-2608, L-968, L-1626, L-653, L-708, L-
1537, L-6151,M-215, L-674, & L-649
• Storm Water Pollution Prevention Plan Part 2
o General Overall SWPPP document, including general instructions, required
permits and forms, erosion control details, and site-specific erosion control sheets
(11"x17"). Part 2 Erosion Control Sheets shall include: L-3062, L-3086, L-3130,
L-1580, M-140, L-2374, L-1979, L-2212, L-708, L-1580, L-7121, & L-1583
A summary of the proposed budget for this revised amendment is as follows:
Part 1 SWPPP Prep(Halff Associates, Inc.) $4,000
Part 2 SWPPP Prep(Halff Associates, Inc.) $4,000
Reproduction(Hugo Trevino Associates, Inc.) $100
10% for MWBE $10
TOTAL,PROPOSED AMENDMENT NO.3 $8,110
FORT WORTH • DALLAS • HOUSTON • McALLEN
TRANSPORTATION • WATER RESOURCES • LAND DEVELOPMENT • MUNICIPAL • ENVIRONMENTAL • STRUCTURAL
MECHANICAL - ELECTRICAL SURVEYING • GEOGRAPHIC INFORMATION SYSTEMS
ARCHITECTURE LANDSCAPE ARCHITECTURE • PLANNING
ON
" Halff Associates
MEN
ENGINEERS • ARCHITECTS • SCIENTISTS
PLANNERS • SURVEYORS
Mr. Chaubey
July 21,2003
Page 2
The M/WBE utilization up to and including Amendment No. 3 is about 29%, which exceeds the City's
M/WBE goal of 16%. Attached are a Summary of Total Project Fees and Estimated Construction Costs
(formatted in accordance with Exhibits B-3A and B-5 of the original contract).
Please review the enclosed information and do not hesitate to call me if you have any questions or require
additional information regarding this proposal and our proposed M/WBE utilization for the referenced
project.
Following is project fee summary:
Original Contract amount $135,600
Amendment No. 1 $ 46,190
Amendment No. 2 $ 55,970
Amendment No. 3 $ 8,110
Revised contract amount $245,870
Sincerely,
HALFF ASSOCIATES, INC.
/W aA
Michael A. Moya, P.E. Ir
Vice President
cc: Tony Sholola,P.E.
AMENDMENT NO. 2 7/21/2003
SUMMARY OF TOTAL PROJECT FEES
Sanitary Sewer Rehabilitation Contract LXIV(64)
DOE No. 3454
Sewer Project No. PS58-070580175600
ESTIMATED CONSTRUCTION COST:
L-1 976R, L-2608, L-3062, L-3086, L-3130, L-968, L-1580, L-1626, L-653, L-708, &L-1537 $ 775,000
L-6151 $ 275,000
M-215 $ 236,000
TOTAL COST(11,015 linear feet of sanitary sewer) $ 1,286,000
Amendment No. 1: M-140, L-674& L-649 $ 444,000
TOTAL COST(15,417 linear feet of sanitary sewer) $ 1,730,000
Amendment No. 2: L-1580(extension), M-140R(extension), L-2374, L-1979, L-3062R,
L-3086R, L-3130R, L-7121, L-1583, & M-62R(excludes cost of L-7121) $ 541,000
TOTAL COST(19,649 linear feet of sanitary sewer) $ 2,271,000
BASIC ENGINEERING DESIGN FEE: Contract Amend 1 Amend 2 Amend 3 Total
Estimated Constr Cost $ 1,286,000 $ 444,000 $ 541,000 $ 2,271,000
TSPE Curve A 7.5% 7.5% 7.5% 7.5%
Basic Charge $ 96,500 $ 33,300 $ 40,600 $ 170,300
15%Fee Reduction (Constr) 85.0% 85.0% 85.0% 85.0%
Basic Fee $ 82,000 $ 28,300 $ 34,500 $ 144,800
Update L-7121 Design $ 1,000 $ 1,000
Prepare SWPPP(Part 1 & 2) $ 8,000 $ 8,000
TOTAL BASIC FEE $ 82,000 $ 28,300 $ 35,500 $ 8,000 $ 153,800
SPECIAL SERVICE Contract Amend 1 Amend 2 Amend 3 Total
Field Surveys $ 36,350 $ 14,530 $ 13,965 $ 64,845
Right-of-Entry Documents(maximum 24) $ 1,200 $ - $ - $ 1,200
Easement(1 metes and bounds) $ - $ - $ 1,100 $ 1,100
Monthly Progress Reports(maximum 9) $ 1,600 $ - $ - $ 1,600
Public Meetings(maximum 2) $ 2,000 $ - $ - $ 2,000
SUBTOTAL(SPECIAL SERVICE) $ 41,150 $ 14,530 $ 15,065 $ 70,745
CONSTRUCTION SERVICES
Pre-Construction $ 1,900 $ 760 $ 760 $ 3,420
Post-Construction $ 3,200 $ 1,280 $ 1,280 $ 5,760
SUBTOTAL(CONSTRUCTION SERVICES) $ 5,100 $ 2,040 $ 2,040 $ 9,180
REPRODUCTION
20 sets of preliminary plans(utility clearance) $ 1,155 $ 330 $ 360 $ 1,845
50 sets of Construction Plans $ 2,890 $ 825 $ 900 $ 4,615
50 sets of Specifications $ 1,925 $ - $ 1,925 $ 110 $ 3,960
1 set of Mylar $ 580 $ 165 $ 180 $ 925
Mounted Exhibits for Public Meetings $ 800 $ - $ - $ 800
SUBTOTAL(REPRODUCTION) $ 7,350 $ 1,320 $ 3,365 $ 110 $ 12,145
TOTAL LUMP SUM FEE $ 135,600 $ 46,190 $ 55,970 $ 8,110 $ 245,870
PROPOSED M/WBE SUBCONSULTANTS Contract Amend 1 Amend 2 Amend 3 Total
Gorrondona&Associates, Inc. (Field Surveys/Esmts.) $ 33,040 $ 13,210 $ 13,695 $ 59,945
Hugo Trevino Associates(Reproduction) $ 5,950 $ 1,200 $ 3,070 $ 100 $ 10,320
TOTAL M/WBE FEES $ 38,990 $ 14,410 $ 16,765 $ 100 $ 70,265
M/WBE PERCENTAGE OF CONTRACT 28.8% 31.2% 30.0% 1.2% 28.6%
B3A-1
MEMORANDUM
TO: A. Douglas Rademaker, Director, DOE; and
Marc Ott, Assistant City Manager
FROM: Rakesh Chaubey, DOE
DATE: August 5, 2003
RE: DESIGN FEE AMENDMENT NO. 3 TO SANITARY SEWER REHABILITATION
CONTRACT 64
DOE 3454
SEWER PROJECT NO. PS58-070580175600
The proposed amendment will allow Halff Associates to provide the Storm Water Pollution Prevention
Plan (SWPPP) for the project as requested by the City.
Halff Associates has submitted a fee in the amount of$8,110.00 for the additional work as described
above, thereby increasing the contract fee from $237,760.00 to $245,870.00. I believe this fee is fair and
reasonable for the additional work involved in preparing the SWPPP documents. It is recommended that
the request be approved.
Two previous amendments have been processed for this contract.
Please authorize additional fee by your signatures on the attached contract amendment forms.
Rakesh Chaubey
Attachment
Cc: Berdena Hamilton, Water Department
Dan Pepon, Water Department.