Loading...
HomeMy WebLinkAboutContract 29212 CITY SECRETARY NTRACT NO , o AMENDMENT NO. 2 STATE OF TEXAS § CITY SECRETARY CONTRACT NO. 24832 COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and Camp Dresser & McKee Inc., (Engineer) made and entered into City Secretary Contract No. 24832, (the Contract) which was authorized by the City Council by M&C C-17322 on the 16`h day of March, of 1999; and WHEREAS, the Contract involves engineering services for the following project: Engineering Contract for the Cantrell-Sansom Pump Station and associated pipelines and the Northside Ground Storage Reservoir, Project Number PW 77-060770160160. WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contract: 1. Article I of the Contract is amended to include the following additional engineering services: Add the following Item number 5.0 to Attachment "A-1" Supplemental Scope of Services. " 5.0 Increased Pumping Capacity: Initial pumping capacity of Northside Pump Station will be increased from 20 MGD to 35 MGD with an ultimate pumping capacity increased from 40 MGD to 60 MGD. Increased capacity requires design changes in pump station pumps, piping, valve changes, and electrical switchgear. The design schedule will be changed from sequential construction of the ground storage tank and pump station to concurrent construction." 2. Article 11, Attachment "B" of the Contract is amended to provide for an increase in the maximum fee to be paid to the Engineer for all work and services performed under rr�r�,itrt� EC-020 Amendment No. 2 Page 1 of 3r the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of$1,040,815.00 The cost to City for these additional services to be performed by Engineer total one hundred ninety thousand four hundred dollars ($190,400.00). Exhibit `B-3", and "B-4"are amended by the attached "Exhibit -B-3a", and `B- 4a" respectively. 3. All other provisions of the contract, which are not expressly amended herein, shall remain in full force and effect. ,. r A� CITY �ECJAITAOY FT. INTH, TEX. Amendment No. 2 Page 2 of 3 6 � p f EXECUTED on this the 44} day of 2003 in Fort Worth, Tarrant County, Texas. APPROVAL RECOMMENDED: APPROVED: r Dale . F1sseler, P.E. arc Ott Director, Water Department Assistant City Manager �.17 ATTEST: G.0 Richard . Sawey, P.E. G oria Over-street Pearson Vice President City Secretary Camp Dresser &McKee, Inc. l_- y c7- pCj ^ontract 40774 trutization APPROVED AS TO FORM AND LEGALITY: l L` r Gary Ste nberger Assistant City Attorney Amendment No. 2 Page 3 of 3 Exhibit `B-3a" Capacity Increase: Fee MWBE % CDM $ 142,120. Gupta And Assoicates $ 43,280 22.0 % Mulatech $ 5,000 2.6 % Total Fee Increase $ 190,400. coo 0 000 0 0 o a � o m Otos ch N O0 OO CC) O c0 O Lo (D M a) Lo O) h LC O) N N O O o� Nt LOOZ) O ++ co J d9 69 EA (f3 J EA ffl (fl u)E9 r F E W ~ 7 0O Cl) M 0 ~D ((D M N m =O L _ 'I N O O O 0 fR cC9 T O 40' 00 C:: w N Al O_ M �_ 7 7 l� PA '7 OJ V CO 5 U -C En fA 69 C C U fA EA EA 69 C .0 Z O O O M r+ _N (p U U (n O (n = () 7 7 7 G 0 V NN (D co CO U) 0 N Cl) Nr-- U) -a _ m O � U N O p c9 (0 C O _N .— N Cn (O O Q O (p L co e3 W u O v� W L- @ O ¢ 1 LL o O O N CN O O _ = F- C) O o O 'Q 0) o 0 0 0 m o CD o C O O (D N �j O N (C C O M '03 C L C: LCi 'IT � LU O_ W N 07000 (D M M V = N N V) = N C 1 C CD 0 0 O ON O OD C cco O OD a) CO r-- 61)69 691 bl� CO, s� E 5 W O co N C7 in 0 V C = C = O O O 0 OO co 0 co -TO co Ccl Lcy) Ln to � 0 N Fp 03, 7 fA fA U C O 2 m N U cn w , 0 0o u) � 00 O N 0 _ _ co C7 °' o 0 0 0 0 0 0 0 CO cn rn m F» o n v_ D) _ -Z m C N LO (A EA 60 69 eA EA to O `n U i U i .0 O N O N (D O O V M O 00 d 2 — LL = O IttE O w C O R y N O U Q a c 7 UN d m E 0 7 a Y O N N O t: . T T — m O U m C �_ Z O a O 3 a> 03L) m 2 a O C � L N U = U i) U) T City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 10/7/2003 DATE: Tuesday, October 07, 2003 REFERENCE NO.: **C-19805 LOG NAME: 60CANTRELL SUBJECT: Amendment No. 2 to the Engineering Agreement with Camp, Dresser & McKee, Inc. for the Cantrell- Sansom Pump Station and Associated Pipelines and the Northside Ground Storage Reservoir RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute Amendment No. 2 to the engineering agreement with Camp, Dresser & McKee, Inc. for the Cantrell-Sansom Pump Station and associated pipelines and the Northside Ground Storage Reservoir, increasing the total contract by $190,400.00, from $850,415.00, to $1,040,815.00. DISCUSSION: On March 16, 1999 (M&C C-17322), the City Council authorized the execution of an agreement with Camp Dresser & McKee, Inc. for engineering services for the Cantrell-Sansom Pump Station and associated pipelines and the Northside Ground Storage Reservoir. This agreement included a study of the transfer of water from other pressure planes into the Northside II and III pressure planes to meet future demands. Amendment No. 1 provided for the development of competitive water service strategies, water distribution system modeling and consultant support for a City annexation task team to enable the Water Department to competitively deliver water service to land development projects within the City's extraterritorial jurisdiction. During final design of the pump station, preliminary water demand information from the Water Master Plan indicated that flow requirements for the Northside Pump Station needed to be increased from the planned 40 million gallons per day (MGD) capacity to 60 MGD, and that the initial capacity would be needed sooner, requiring an accelerated schedule. After the construction project was bid, final water demand information indicated that initial capacity must be increased to 35 MGD to meet growth in the north side of Fort Worth in 2004-2005, with possible future follow-on pump installation(s) until the Eagle Mountain Water Treatment Plant is expanded in 2008. The initial pumping increase will change the pumps, electrical switchgear and some valves. Proposed Amendment No. 2 is for the engineer to increase the initial pumping capacity of Northside Pump Station from 20 MGD to 35 MGD, and the ultimate pumping capacity from 40 MGD to 60 MGD, which requires increase in pump station size, pump, piping and valve changes, and electrical switchgear changes. The design schedule will be changed from a staggered tank and pump station project to an accelerated combined construction project. Camp, Dresser and McKee, Inc. is in compliance with the City's M/WBE Ordinance by a committing to an additional 22% M/WBE participation on this amendment. The City's goal on this amendment is 22%. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the Commercial Paper-Water Fund. Lov-name: 60CANTRELL Page 1 of 2 TO Fund/Account/Centers FROM Fund/Account/Centers PW77 531200 060770160160 $190,400.00 Submitted for City Manager's Office by Marc Ott (8476) Originating Department Head: Maebell Brown (Acting) (8207) Additional Information Contact: Maebell Brown (Acting) (8207) LoRname: 60CANTRELL Page 2 of 2