HomeMy WebLinkAboutContract 29320 AMENDMENT NO. 4 STATE OF TEXAS $ CITY SECRETARY CONTRACT NO. Z�9 (No M&C Needed) COUNTY OF TARRANT $ WHEREAS, the City of Fort Worth (City) and Gutierrez, Smouse, Wilmut & Associates, Inc. , (Engineer) made and entered into City Secretary Contract No. 26802, (the Contract) which was authorized by the City Council by M&C C-18597 on the 22nd day of May 2001; and subsequently revised by three previous amendments; and WHEREAS, the Contract involves engineering services for the following project: Engineering contract for the design of Sanitary Sewer Rehabilitation Contract LXIII (63) . WHEREAS, it has become necessary to execute Amendment No. 4 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1 . Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated October 15, 2003 , a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $7, 229 . 00 . 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $101, 845. 55 . 3 . All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the ��J day of 2003, in Fort Worth, Tarrant County, Texas. ATTEST: �b --,r=Tact Authorization Glo ' a Pearson, City Secretary _r APPROVAL RECOMMENDED: APP ED: - � - V A. Douglas Rademaker, P.E. Marc A. O t Director, Department of Assistant City Manager Engineering Gutierrez, Smouse, Wilmut & Associates, Inc. ENGINEFgR/ J� By: Name: Gre Lens, P.E. Proiect Manager 3950 Fossil Creek Blvd. , Ste 210 Fort Worth, TX 76137 APPROVED AS TO FORM AND LEGALITY: Gary Stei erger Assistant City Attorney 22266-6 '����b� �, l' :'.��►��� -2- IL1kU F . JX. GSWW, Inc. Civil/Environmental Engineers■Planners Dallas■ Fort Worth■Midland■Austin Predecessor Firms: Gutierrez,Smouse,Wilmut&Assoc.,Inc. Washington&Associates,Inc. October 15, 2003 City of Fort Worth Department of Engineering 900 Monroe Street, 2nd Floor Fort Worth, Texas 76102 Attention: Mr. Mike Domenech, P.E., Project Manager Re: Supplemental Autorizabon Request No. 4, CONTRACT LXIII, Sanitary Sewer Rehabilitation; Unit 1/DOE No. 3358 & Unit 2/DOE No.3891, Sewer Project No. PS58-070580175510; GSW #1007-003 Mr. Domenech: This letter is our formal request for Supplemental Authorization to be compensated for additional engineering services as requested by the City. Justification In review of the existing L-483 backyard sewer main with City Staff, it has been determined that the best solution to provide sufficient depth for the sanitary sewer service to 2309 Edwin Street and minimize inconvenience to the downstream home owners will be to construct a new 8-inch public sanitary sewer main from L-483R in Mistletoe Drive east up Edwin Street for about 580 feet and then install 100 feet of new sanitary sewer service line for 2309 Edwin Street. This new sewer main was not in the original engineering contract scope or any of the previous amendments, therefore additional surveying and engineering design will be required. GSW's contract with -the MWBE surveyor is attached. The additional costs are summarized below: • Additional surveying for 8-inch sewer main in Edwin St. by A.N.A. Consultants, L.L.0 (MWBE firm) $ 2,040.00 • Additional design for 8-inch sewer main in Edwin Street $ 5,189.00 TOTAL FOR PROPOSED AMENDMENT NO. 4 FEE $ 7,229.00 3950 Fossil Creek Boulevard,Suite 210, Fort Worth,Texas 76137 . 817.306.1444 . 817.306.1555 Fax . www.gsw-inc.com City of Fort Worth October 15,2003 Paye 2 Unit 11DOE#3358& Unit 21DOE#3891 PROJECT FEE DETAILS Contract Item Description Fee Original Contract Contract LXIII San. Sewer Rehab $ 67,704.00 Amendment No. 1 Additional Survey & Easements $ 14,557.55 Amendment No. 2 Sanitary Sewer Lateral L-558 Redesign $ 8,765.00 Amendment No. 3 Design of Sewer Services $ 3,590.00 Amendment No. 4 Edwin Street Sewer Design $ 7,229.00 TOTAL PROJECT FEE $101.845.55 If you have any questions or need additional information concerning this request, please call me. Respectfully submitted Gutierrez, Smouse, Wilmut & Assoc., Inc. Gregory . D' in P.E. Associat d ct Manager Enclosures \\Sery r2k\$Documents\CORRESPONDENCaGSWW Itr-2003\101503-IGWD-1007-003-amend4¢rev.doc I I CITY OF FORT WORTH AMENDMENTS, CHANGE ORDERS or EXTRA WORK CONTRACT COMPLIANCE MEMORANDUM THIS FORM MUST BE ATTACHED TO THE ROUTING "M & C"BEFORE LEGAL AND CITY MANAGER APPROVAL To: Tony Sholola (underline appropriate ote) Project Manager Buyer Department Director From: Rachel Ortega `� 6104 M1WBE Office Staff y Extension Date: October 28, 2003 In the Amount of $7,229.00 DOE 3358 Project Number Project/Bid: Amendment No. 4 for the Design of Contract LX111 (63), Sanitary Sewer Rehabilitation Compliance with the City's M/WBE Ordinance as it relates to amendments, which exceed ten precent (10%) of the original contract amount has been achieved by one of the following methods: a). is in compliance with the City's MAMBE Ordinance by committing to an additional 0% M/WBE participation on this Amendment/Change Order No._ b). GSWW, Inc. is in compliance with the City's M/WBE Ordinance by committing to an additional 28 % M/WBE participation on this Amendment/Change Order No. 4 . The City's goal on this amendment, change order or extra work is 12 %. c), is in compliance with the City's M/WBE Ordinance by documenting good faith effort. The City's goal on this amendment, change order or extra work is 0 %. d). is in compliance with the City's M/WBE Ordinance by approval of a waiver request of the M/WBE requirement. The City's goal on this amendment, change order or extra work is 0 %. 05/11/99 r FORT WORTH MEMORANDUM TO: A. Douglas Rademaker, Director DOE and Marc A. Ott, Assistant City Manager FROM: Miguel A. Domenech, P.E. DATE: November 7, 2003 RE: DESIGN FEE AMENDMENT NO. 4 TO SANITARY SEWER REHABILI- TATION CONTRACT LXIII (63), DOE NO. 3358, WATER PROJECT NO. PS58-070580175510 The proposed amendment will allow Gutierrez, Smouse, Wilmut & Associates, Inc., (GSWA)•to provide additional survey and design on the project as requested by the City. Subsequent to completing design of the project, it has been determined that lateral L-483 needs to be deepened in order to provide trouble free sanitary sewer service to residences lo- cated on Edwin Street. A new 8-inch sanitary sewer main is proposed from L-483R in Mis- tletoe Drive east up Edwin Street for about 580 linear feet along with 100 linear feet of new sanitary sewer service line. Gutierrez, Smouse, Wilmut & Associates, Inc., has requested a fee of$7,229.00 for the addi- tional services to be provided thereby increasing the contract fee from $94,616.55 to $101,845.55. I believe this fee is fair and reasonable for the additional services that were pro- vided. Please authorize this additional design fee by your signatures on the attached contract amendment form. cc: Tony Sholola, P.E., Program Manager Berdena Hamilton, Water Department Dan Pepon, Water Department MEMO 7642 F ENGINEERING DEPARTMENT THE CITY OF FORT WORTH * 1000 THROCKMORTON STREET * FORT WORTH, TEXAS 76102-6311 (817) 871-7941 * Fax (817) 871-7854 Printed on recycled pape.