HomeMy WebLinkAboutContract 30416 AMENDMENT NO. 5
STATE OF TEXAS $ CITY SECRETARY CONTRACT NO.-
(M&C Needed)
COUNTY OF TARRANT b
WHEREAS, the City of Fort Worth (City) and Dunaway Associates,
Inc. , (Engineer) made and entered into City Secretary Contract No.
26599, (the Contract) which was authorized by the City Council by
M&C C-18456 on the 13th day of February, 2001 and; subsequently
revised by 4 previous amendments; and
WHEREAS, the Contract involves engineering services for the
following project:
Sanitary Sewer Main 1-1-1 Condition Assessment and Drainage
Area Evaluation Study
WHEREAS, it has become necessary to execute Amendment No. 5 to
said Contract to include an increased scope of work and revised
maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and through
their duly authorized representatives, enter into the following
agreement which amends the Contract:
1.
Article I, of the Contract is amended to include the addition-
al engineering services specified in M&C C-20013, adopted by the
City Council on 17th day of August, 2004 , and further amplified in
a proposal letter dated May 17, 2004, copies of which are both
attached hereto and incorporated herein. The cost to City for the
additional services to be performed by Engineer total $46,420.00.
2.
Article II, of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work and
services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall not
exceed the sum of $913,090.73.
(Molm
3.
All other provisions of the Contract which are not expressly
amended herein shall remain in full force and effect.
EXECUTED on this the ,lae day of , 2004 , in
Fort Worth, Tarrant County, Texas .
ATTEST:
LL6 CoriLatLA thori ation
Marty Hendrix --
City Secretary Date
APPROVAL RECOMMENDED: P l
A. Douglas Rademaker, P.E . MFarc Ott
Director, Department of Assis t City Manager
Engineering
DUNAWAY, ASSOCIATES, INC.
Enginq! r-
By:
Name:Brian Darby, F.E . Associates
1501 Merrimac Circle
Suite 100
Fort Worth, TX 76107-6572
APPROVED AS TO FORM AND LEGALITY:
Gary Steinberger
Assistant City Attorney
-2-
Dunaway Engineers
Planners
Surveyors
Associates, Inc. Landscape Architects
DAI No. 2000181-02
May 17, 2004
Mr. Mike Domenech, P.E.
Project Manager
City of Fort Worth
Department of Engineering
Fort Worth, Texas 76102
Reference: Amendment No. 5-Revised
Sanitary Sewer Main M-1-1-1
Condition Assessment and Drainage Area Evaluation Study
Sewer Project No. P170-070170410020
D.O.E. Project No. 3783
Dear Mr. Domenech:
Dunaway Associates, Inc. is pleased to present this Amendment No. 5 for the following additional
services that are beyond our original scope of services.
M-1-1-1 Phase 2
• 2,200 LF of additional survey and design for new re-routed alignments of sanitary sewer for M-1-
1-1, M-39, L-9261*, L-883 and M-22.
• Additional survey and plan preparation for sanitary sewer service re-route plans on individual
properties at various locations for: M-63, L-533, L-148*, L-877*, L-822*, L-562 and L-374.
• Adjustments to Phase 1 and Phase 2 pian sets for abandonment and construction scheduling.
• Preparation of one (1) Permanent Easement.
• Preparation of one (1)Temporary Construction Easement.
Preparation of up to nine (9)Temporary Right-of-Entries.
• Preparation of two (2)TxDOT Permits.
• Alignment analysis, capacity sizing, utility research, and right-of-way research for sewer design.
• Additional coordination meetings.
0 Reproduction.
o Amendment No. 5
May 17, 2004
Page 2
A summary of the proposed budget for this revised amendment is as follows:
Basic Fee
Design of 2,200 LF of sanitary sewer($10.00/LF) $ 22,000.00
Service re-route plan preparation (up to six @$200.00/EA) $ 1,200.00
Adjustments for abandonment and construction scheduling $ 4,000.00
MIME Survey(2,200 LF x$3.00/LF) $ 6,600.00
Permanent sanitary sewer easement($800.00/EA) $ 800.00
Temporary construction easement($400.00/EA) $ 400.00
Service re-route survey(up to six @$200.00/EA) $ 1,200.00
Sub-consultant administation(10%) $ 900.00
Temporary Right-of-Entries (up to nine @$50.00/EA) $ 450.00
TxDOT Permits (up to two @$500.00/EA) $ 1,000.00
Alignment analysis, capacity sizing, utility research, &right-of-way $ 6,000.00
research
Coordination meetings(up to three @$400.00/EA) $ 1,200.00
Reproduction $ 670.00
TOTAL PROPOSED AMENDMENT $ 46,420.00
A summary of the total project is as follows:
Contract Description Fee
Original Contract SSES Evaluation $509,997.13
Amendment No. 1 Perform Boundary Survey Services for $14,000.00
platting
Amendment No. 2 Design of 14,536 LF of Sewer & Water $299,831.40
Improvements
Amendment No. 3 Calhoun Waterline, & Phase 1 $24,942.20
Amendment No. 4 TPW & Envirommnetal Coordination & $17,900.00
Revision and Re-advertisement
Amendment No. 5 Design of 2,200 LF of Sewer $46,420.00
Improvements and Re-route plans
TOTAL PROJECT $913,090.73
Please review the enclosed information and do not hesitate to call me if you have any questions or
require additional information regarding this proposal.
Sincerely,
DUNAWAY ASSOCIATES, INC.
Brian . arby, r
Associate
2000181-02 Amendment#5 MDomenech 04-0517 KJv1C-REVISED.doc
City of Fort Worth, Texas
Mayor and Council Communication
COUNCIL ACTION: Approved on 8/17/2004
DATE: Tuesday, August 17, 2004
LOG NAME: 30SSM111 N05 REFERENCE NO.: **C-20213
SUBJECT:
Amendment No. 5 to Engineering Agreement with Dunaway Associates, Inc. for Sanitary Sewer
Main 1-1-1 Condition Assessment and Drainage Area Evaluation Study
RECOMMENDATION:
It is recommended that the City Council authorize the City Manager to execute Amendment No. 5 to City
Secretary Contract No. 26599 with Dunaway Associates, Inc. in the amount of $46,420.00 to provide
additional design and survey services, thereby increasing the contract amount to $913,090.73.
DISCUSSION:
On February 13, 2001 (M&C C-18456), the City Council authorized the City Manager to execute a contract
with Dunaway Associates, Inc. in the amount of $509,997.13 for Sanitary Sewer Main 1-1-1 Condition
Assessment and Drainage Area Evaluation Study. The contract was subsequently revised by four previous
amendments totaling $356,673.60 that are further described as follows:
Amendment No. 1 in the amount of $14,000.00, provided for the boundary survey of a tract of land
that the City purchased within the Main 1-1-1 project area; and
Amendment No. 2 (M&C C-18822), in the amount of$299,831.40, provided necessary design services
for the replacement of 14,536 linear feet of severely deteriorated sewer pipe within the project area_ The
poor condition of the identified segment of the sewer pipe was unknown at the time the original agreement
was executed; and
Amendment No. 3 in the amount of $24,942.20, provided for the necessary design services for the
replacement of the following water and sewer improvements located within the M1-1-1 project area:1,250
linear feet of water line along Calhoun Street and 720 linear feet of a severely deteriorated segment of
sewer main M-132 located within the M1-1-1project area. The poor condition of the identified segments of
water and sewer pipe was unknown at the time the original agreement was executed; and
Amendment No. 4 in the amount of $17,900.00, provided for revisions to the project plans to
accommodate proposed improvements on some project streets by the Transportation and Public Works
Department. In addition, the plans and specifications were updated to comply with current City
design standards.
Results of recent field investigation revealed that several sanitary sewer lines under U.S. Highway 287 and
East Lancaster Avenue are in need of replacement due to deteriorated pipe condition. Under this
Amendment No. 5, the Engineer will prepare approximately 2,200 Linear Feet (LF) of design to relocate
these deteriorated sewers. In addition, the Engineer will prepare plans to relocate six (6) sanitary sewer
services in the vicinity of North Hampton Street, Johnson Street and Hays Street, from the back of property
to street to ease future maintenance.
http://www.cfwnet.org/council_packet/Reports/mc_print.asp -.1 ;,�� - 8/18/2004
'phis property is located in COUNCIL DIS"rRICT No. 9.
Dunaway Associates, Inc. proposes to provide the necessary additional design and survey services for a
fee of$46,420.00. Staff considers this amount to be fair and reasonable.
FISCAL INFORMATION/CERTIFICATION:
The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the
Sewer Capital Project Fund.
TO Fund/Account/Centers FROM Fund/Account/Centers
P170 531200 070170410020 $46,420.00
Submitted for City Manager's Office b Marc Ott (8476)
Originating Department Head: A. Douglas Rademaker (6157)
Additional Information Contact: A. Douglas Rademaker(6157)
77--
http://www.cfwnet.org/counciI_packet/Reports/mc_print.asp 8/18/2004