Loading...
HomeMy WebLinkAboutContract 30417 AMENDMENT NO. 6 STATE OF TEXAS $ CITY SECRETARY CONTRACT NO.3 I] (No M&C Needed) COUN'T'Y OF TARRANT $ WHEREAS, the City of Fort Worth (City) and LOPEZGARCIA GROUP formerly Wendy Lopez & Associates, Inc . , (Engineer) made and entered into City Secretary Contract No. 26994, (the Contract) which was authorized by the City Council by M&C C-18701 on the 9th day of August 2001; and subsequently revised by five previous amendments; and WHEREAS, the Contract involves engineering services for the following project: Engineering contract for the design of Water and Sanitary Sewer Extension for Bryson Tract Area. WHEREAS, it has become necessary to execute Amendment No. 6 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated July 13, 2004, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $15,554 . 08 . 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $132,519.26 . I �R 1GIN 3 . All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the 1 ,4 day of 2004, in Fort Worth, Tarrant- County, Texas. ATTEST: 1�0 ITY4 Contract Authorization Martha A. HendrixCity Secretary Date APPROVAL RECOMMENDED: APPROVED: Adz )z'�j 4 A. Douglas Rademaker, P.E. Marc A. Ott Director, Department of Assistant City Manager Engineering LOPEZGARCIA_GROUP formerly Wendy Lopez & Associates, Inc. ENGINEAR By: Z C Name:• Ben M Tr-eiade, P — — Douglas C. Mikeworth, P.E. Vice President 6850 Manhattan Blvd. , Suite 300 Fort Worth, TX 76120 APPROVED AS TO FORM AND LEGALITY: 2gkR4_'� Gary Steinberger Assistant City Attorney -2- July 13, 2004 Mr. Mike A. Domenech, P.E. Project Manager City of Fort Worth Department of Engineering 900 Monroe Street, Suite 201 Fort Worth, Texas 76102 RE: Request for Amendment No. 6 Water and Sewer Extension for Bryson Tract, D.O.E. 3312 LGGROUP Project No. 210069.00 Dear Mr. Domenech: This letter is in response to your request for additional engineering design and special services for the above referenced project. The additional design services are as described below. A detailed breakdown of the proposed fees for these additional services is also attached. Our proposed engineering fee for the additional work includes the following (also identified in Attachment E-1): 1. Design 680 LF of 8" waterline along Bailey-Boswell Road from Bryson Lane to Old Decatur Road, including two (2) 8" gate valves, required domestic connections, and a single fire hydrant. This additional design includes a total revision to Waterline "C" (Sheet 12) and a revision to 8"Waterline "A" at Bailey-Boswell Road (Sheet 4). 2. Change the proposed 6" water service line (Waterline "B", Sheet 12) from Old Decatur Road to Tract 1C (James M. Dean property) to a 4" water service (Sheet 12). 3. Add a 6" fire line service for the Bryson Elementary School on 8" Waterline "A" in Bryson Lane (Sheet 4). 4. Redesign sanitary sewer Line "A" by providing a manhole and stub-out at approximately station 19+88. This design will connect sanitary sewer Line "A"to the sanitary sewer system to be built by the developer of the Boswell Meadows Addition. This requires a total revision to Sheet 7. Sheets 5 and 6 showing the current alignment for sanitary sewer Line "A" will be revised to indicate "Removed from this Contract". These two sheets will remain in the existing plans. 5. Prepare a plan sheet identifying the vacation of existing sanitary sewer and utility easements. 6. Perform a sewerage subbasin capacity study and verify the sizing of the sanitary sewers designed by the Boswell Meadows Addition Developer's engineer. I ; . Iopezgarciagroup.com 6$;0 Manhattan BNd.,S(iite 300 FortWorh.Texa 76120 '$17)446-1$01 '817''446-'i i 3 Fax ? r P 7 71 _ _ R O U P Mr. Miguel A. Domenech, P.E. City of Fort Worth July 13, 2004 Page Two 7. Attend one (1) conceptual meeting, (2) Eagle Mountain-Saginaw Independent School District design meetings, and one (1) Preliminary Engineering Meeting for a total meeting time of 12 hours. 8. Prepare and submit a written statement that verifies the Bryson Tract sanitary sewerage system improvements can be constructed (dry) prior to the Boswell Meadows Addition sanitary sewerage system improvements. 9. Revise the existing index and layout control sheets (Sheets 2 & 3) to reflect the Amendment No. 6 revisions. 10. Prepare required opinions of probable cost which identify expected changes in construction cost. 11. Make miscellaneous note changes (references) to the plans to accommodate the newest design changes. 12. Prepare a traffic control sheet and provide the required details to accommodate the sanitary sewer construction in Old Decatur Road. 13. Prepare one (1) private service re-connection sheet for 6, 4"services. Please note that the proposed fee does not include the following work items: ✓ Preparation of easements or property descriptions, ✓ Preparation of Temporary Right-of-Entry Exhibits and Documentation, ✓ Bid assistance, ✓ Submission of anytype of electronic file, except as specifically indicated, ✓ Preparation of permits for various local, state, or federal authorities, ✓ Environmental documents or wetland determinations, ✓ Geotechnical studies or subsurface investigations, ✓ Storm Water Pollution Prevention Plan, ✓ Additional meetings, site visits, or reviews, except as specifically indicated, ✓ Construction layout surveying, or ✓ Other items not specifically identified within this document. The additional efforts are considered outside our original scope of work, and we therefore request a contract amendment to increase the lump sum fee amount by $15,554.08 (See attached proposed LGGROUP fee). Mr. Miguel A. Domenech, P.E. City of Fort Worth July 13, 2004 Page Three Original Lump Sum Amount: $67,830.00 Amendment No. 1: $8,077.00 — Approved 3/12/02 Amendment No. 2: $17,172.05 — Approved 8/20/02 Amendment No. 3 $14,305.55 — Approved 1/15/03 Amendment No. 4 $6,748.88 — Approved 9/3/03 Amendment No. 5: $2,831.70 — Approved 2/2/04 Amendment No. 6 $15,554.08 — Requested Herein Total Revised Amount: $132,519.26 If you have any questions or need additional information concerning this request, please feel free to contact me or Charles Leist at (817) 446-1800. Sincerely LOPEZGARCIA GROUP C , Douglas C. Mikeworth, P. . Vice President DM:chl Enclosure P:\FW\210069.00\Doc\Contract-Amendment\Am end mend No.6 Rev(07-13-04).doc I — 4 CIA o41a 8 Olt X, -M Z ,,,,,� .(�i su or•oo.rs 2'a b' i %Y 1 t- �.� � Pl1+M IGS I UI M1�✓V I Wu 11 � .yr y�..f Y.• +.-.lil 1 r _ v AC M"••:'^ Y.M 1� A. LOVE 1./L N4�Ta_j .•.� K Y0. S St' 1 Qt fb II V It Y . : •['3 _ �a >7 d :. n e9 a x. e7 K n r9 I' � �� ,t �� ..` n � a I' � rl --- - i�_ 400 • .' �. ' •``— � u b' Y.N.M 37X IDpf.7d] 'N �9]I]Y� ]I b, It rl t7 I ♦'ll r' �AId t sEt}�Ie,]7 il'2 \ �'� SA.TAOPY EEO"fAS(-�g Na!SA 74di6!. N` PHASE RToe®PUp IlC \ MOM=9.![Iy MC ��y RPIo NR IW �91YG U'! YH Ml 1 !tA I4a,.Jn _ Vffr CWI A Oa>ra wY IIY9iaN —>�—� r.. City of Fort Worth Amendment No.6 Contract No. DOE 3312 LGG No. 210069.00 Water and Sanitary Sewer Extension for Bryson Tract LOPEZGARCIA GROUP Direct Labor Item Labor Category Hours Rate Labor Cost _Principal 1 $ 162.75 $ 162.75 Project Manager 22.5 $ 136.50 $ 3,071.25 Civil Engineer 36.5 $ 99.75 $ 3,640.88 Civil En ineer-In-Training 103 $ 68.25 $ 7,029.75 Senior Clerical/Project Administrator 1 $ 52.50 $ 52.50 Surveyor-RPLS 2 $ 110.25 $ 220.50 Surveyor-LSIT 0.5 $ 78.75 $ 39.38 Two-Person Survey Crew 4 $ 99.75 $ 399.00 Subtotal for Direct Labor $ 14,616.00 Overhead(if applicable) Rate: 0.00% $ - Professional Fee(if applicable) Rate: 0.00% $ - Total Direct Labor $ 14,616.00 Direct Costs Travel Description of travel: Local Office to City and Site Unit of Description Measure Quantity Rate Totals Mileage Mile 245 $ 0.37 $ 89.43 Mileage Survey Mile 45 $ 0.37 $ 16.65 Subtotal of Travel Costs $ 106.08 Other Direct Costs Unit of Description Measure Quantity Rate Totals N/A 0 0 $ - $ - Subtotal of Other Direct Costs $ - Subcontractor Costs Unit of Description Measure Quantity Rate Totals Mylar Reproduction EA 16 $ 12.00 $ 192.00 Original Copies 20 Sets PG 320 $ 2.00 $ 640.00 Subtotal of Subcontractor Costs $ 832.00 Subtotal of Direct Costs $ 938.08 Professional Fee(if applicable) Rate: 0.00% $ - Total Direct Costs $ 938.08 Project Totals Total Labor Costs $ 14,616.00 Total Direct Costs $ 938.08 TOTAL DELIVERY ORDER COST $ 15,554.08 P:\FW\210069.00\Doc\Contract-Amendment\Amendment No.6 Rev Summary(07-13-04) 4:20 PM City of Fort Worth Amendment No.6 Contract N DOE 3312 LGG No. 210069.00 Water and Sanitary Sewer Edension for Bryson Tract 7113/2004 LOPF2GARCIA GROUP Direct Labor-Task Details CMA Erphror In swr.Crania*/ T-P-Swy Ta.k N. Task Herne P*-Vat Pr 1.1 M-g. CM Erg- Tronkg Pro. Adi44atrmm Su-W-RPLS Sur%%r-LM Crow Total for Task to Bask:Engknerkg 1.1 a'WL Dealgn(660 LF) 1 6 24 S 2.572.50 1.2 ONOC I 1 $ 23625 LaMMndex Reviebns(SHT9 2& 1'3 3) 0.5 1 S 118.13 1.4 Una NB WL R.Naiora(SFIT 4,12) f 2 $ 23625 1.5 Coat Esematee 0.5 6 $ 477.75 1.7 Vold LIM A SS,(SHT 5) 0.5 0.5 $ 84.00 1 A Void Lina A SS,(SHT 6) 0.5 0.5 $ 84.00 l A Total 0 23 11.5 34 0 0 0 0 $ 3,1106.66 2A Basn study 2.1 Bean Research 4 E 273.00 2.2 Capacity CaM;OlaUora a S 798.00 2.3 B.Meadows CADD Convera on 1 $ 6825 2.4 B.Meadows Symen Eveaatlon 2 $ 199.50 2.0 Total 0 0 10 5 0 0 0 0 $ 1,333.76 3.0 coordination 3.1 Conceptual Meeting 2 $ 273.00 32 COFWIEMSISO Mee&Q 4 S 546.00 3.3 PnFnroryMeetrg 2 $ 273.00 3A COFWrEWISD Fka1 Meeting 4 $ 546.00 3.0 Total 0 12 0 0 O 0 0 0 S 1,638.00 4.0 Mien.Bervkea 4.1 Traffic Cartrol w/Std.Detak 1 12 40 $ 4,063.50 42 Identify and Prepare Shat for Easement Vambon 1 1 i8 2 $ 1,68.525 43 Dry Saver Consh-tion Racanmsdabon 1 1 E 215.25 4A Total 1 2 /3 58 1 2 0 0 S 81964.00 8.0 Sarvk:e Go, ..done 5.1 Sett W`rake DorrryTmvel 2 S 199.50 52 Stmy Shot for 6 Lda 2 E 109.50 5.3 S-ey Conversion 0.5 S 39.38 5.4 Renals Calm 1 $ 98.75 5.5 Remove CADD 5 S 34125 5.8 Ske Vlad for Cooed. 4 $ 546.00 5.7 Commudty Coord. 1 S 136.50 5.8 ONOC 1 1 1 $ 304.50 5.0 Tow 0 6 2 a 0 0 0.6 4 S 1,im.35 6.0 [enter general hedkq] 6.0 Total 0 0 0 0 0 0 6 0 S 7.0 Ceder gew.l heading] 7.0 Total 0 0 0 0 0 0 0 0 S - 8.0 [enter general hawing] 8.0 Total 0 0 0 0 0 0 0 0 S 9.0 leder general headkg) 9.0 Ta4al 0 0 0 0 0 0 0 0 S - 10.0 [order general laadInM 10.0T.4e1 0 0 0 0 0 0 0 0 $ - ToW Direct Labor Hoare 1 22.5 38.5 103 1 2 0.5 4 Rola S 162.75 S 138.50 S 00.75 $ 6825 S 52.50 S 11025 S 78.75 $ 88.75 Total Labor Coals S 18275 S 3,07125 S 3,840.116 S 7,029.75 S 5230 S 220.60 S 39.38 S 399.00 S 14,615.00 PlFWV10069.0010edCm4ect-AnwrWna&A.-.k-k No aRev S..-q(07-13-04) 4:30 PM