HomeMy WebLinkAboutContract 30417 AMENDMENT NO. 6
STATE OF TEXAS $ CITY SECRETARY CONTRACT NO.3 I]
(No M&C Needed)
COUN'T'Y OF TARRANT $
WHEREAS, the City of Fort Worth (City) and LOPEZGARCIA GROUP
formerly Wendy Lopez & Associates, Inc . , (Engineer) made and
entered into City Secretary Contract No. 26994, (the Contract)
which was authorized by the City Council by M&C C-18701 on the 9th
day of August 2001; and subsequently revised by five previous
amendments; and
WHEREAS, the Contract involves engineering services for the
following project:
Engineering contract for the design of Water and Sanitary
Sewer Extension for Bryson Tract Area.
WHEREAS, it has become necessary to execute Amendment No. 6
to said Contract to include an increased scope of work and revised
maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and
through their duly authorized representatives, enter into the
following agreement which amends the Contract:
1.
Article I of the Contract is amended to include the
additional engineering services specified in a proposal letter
dated July 13, 2004, a copy of which is attached hereto and
incorporated herein. The cost to City for the additional design
services to be performed by Engineer total $15,554 . 08 .
2.
Article II of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work
and services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall not
exceed the sum of $132,519.26 .
I
�R
1GIN
3 .
All other provisions of the Contract which are not expressly amended
herein shall remain in full force and effect.
EXECUTED on this the 1 ,4 day of 2004, in Fort
Worth, Tarrant- County, Texas.
ATTEST: 1�0 ITY4
Contract Authorization
Martha A. HendrixCity Secretary
Date
APPROVAL RECOMMENDED: APPROVED:
Adz )z'�j 4
A. Douglas Rademaker, P.E. Marc A. Ott
Director, Department of Assistant City Manager
Engineering
LOPEZGARCIA_GROUP formerly
Wendy Lopez & Associates, Inc.
ENGINEAR
By: Z
C
Name:• Ben M Tr-eiade, P — — Douglas C. Mikeworth, P.E.
Vice President
6850 Manhattan Blvd. , Suite 300
Fort Worth, TX 76120
APPROVED AS TO FORM AND LEGALITY:
2gkR4_'�
Gary Steinberger
Assistant City Attorney
-2-
July 13, 2004
Mr. Mike A. Domenech, P.E.
Project Manager
City of Fort Worth
Department of Engineering
900 Monroe Street, Suite 201
Fort Worth, Texas 76102
RE: Request for Amendment No. 6
Water and Sewer Extension for Bryson Tract, D.O.E. 3312
LGGROUP Project No. 210069.00
Dear Mr. Domenech:
This letter is in response to your request for additional engineering design and special services
for the above referenced project. The additional design services are as described below. A
detailed breakdown of the proposed fees for these additional services is also attached.
Our proposed engineering fee for the additional work includes the following (also identified in
Attachment E-1):
1. Design 680 LF of 8" waterline along Bailey-Boswell Road from Bryson Lane to Old
Decatur Road, including two (2) 8" gate valves, required domestic connections, and
a single fire hydrant. This additional design includes a total revision to Waterline "C"
(Sheet 12) and a revision to 8"Waterline "A" at Bailey-Boswell Road (Sheet 4).
2. Change the proposed 6" water service line (Waterline "B", Sheet 12) from Old
Decatur Road to Tract 1C (James M. Dean property) to a 4" water service (Sheet
12).
3. Add a 6" fire line service for the Bryson Elementary School on 8" Waterline "A" in
Bryson Lane (Sheet 4).
4. Redesign sanitary sewer Line "A" by providing a manhole and stub-out at
approximately station 19+88. This design will connect sanitary sewer Line "A"to the
sanitary sewer system to be built by the developer of the Boswell Meadows Addition.
This requires a total revision to Sheet 7. Sheets 5 and 6 showing the current
alignment for sanitary sewer Line "A" will be revised to indicate "Removed from this
Contract". These two sheets will remain in the existing plans.
5. Prepare a plan sheet identifying the vacation of existing sanitary sewer and utility
easements.
6. Perform a sewerage subbasin capacity study and verify the sizing of the sanitary
sewers designed by the Boswell Meadows Addition Developer's engineer.
I
; .
Iopezgarciagroup.com 6$;0 Manhattan BNd.,S(iite 300 FortWorh.Texa 76120 '$17)446-1$01 '817''446-'i i 3 Fax ?
r P 7 71 _ _ R O U P
Mr. Miguel A. Domenech, P.E.
City of Fort Worth
July 13, 2004
Page Two
7. Attend one (1) conceptual meeting, (2) Eagle Mountain-Saginaw Independent School
District design meetings, and one (1) Preliminary Engineering Meeting for a total
meeting time of 12 hours.
8. Prepare and submit a written statement that verifies the Bryson Tract sanitary
sewerage system improvements can be constructed (dry) prior to the Boswell
Meadows Addition sanitary sewerage system improvements.
9. Revise the existing index and layout control sheets (Sheets 2 & 3) to reflect the
Amendment No. 6 revisions.
10. Prepare required opinions of probable cost which identify expected changes in
construction cost.
11. Make miscellaneous note changes (references) to the plans to accommodate the
newest design changes.
12. Prepare a traffic control sheet and provide the required details to accommodate the
sanitary sewer construction in Old Decatur Road.
13. Prepare one (1) private service re-connection sheet for 6, 4"services.
Please note that the proposed fee does not include the following work items:
✓ Preparation of easements or property descriptions,
✓ Preparation of Temporary Right-of-Entry Exhibits and Documentation,
✓ Bid assistance,
✓ Submission of anytype of electronic file, except as specifically indicated,
✓ Preparation of permits for various local, state, or federal authorities,
✓ Environmental documents or wetland determinations,
✓ Geotechnical studies or subsurface investigations,
✓ Storm Water Pollution Prevention Plan,
✓ Additional meetings, site visits, or reviews, except as specifically indicated,
✓ Construction layout surveying, or
✓ Other items not specifically identified within this document.
The additional efforts are considered outside our original scope of work, and we therefore
request a contract amendment to increase the lump sum fee amount by $15,554.08 (See
attached proposed LGGROUP fee).
Mr. Miguel A. Domenech, P.E.
City of Fort Worth
July 13, 2004
Page Three
Original Lump Sum Amount: $67,830.00
Amendment No. 1: $8,077.00 — Approved 3/12/02
Amendment No. 2: $17,172.05 — Approved 8/20/02
Amendment No. 3 $14,305.55 — Approved 1/15/03
Amendment No. 4 $6,748.88 — Approved 9/3/03
Amendment No. 5: $2,831.70 — Approved 2/2/04
Amendment No. 6 $15,554.08 — Requested Herein
Total Revised Amount: $132,519.26
If you have any questions or need additional information concerning this request, please feel
free to contact me or Charles Leist at (817) 446-1800.
Sincerely
LOPEZGARCIA GROUP
C ,
Douglas C. Mikeworth, P. .
Vice President
DM:chl
Enclosure
P:\FW\210069.00\Doc\Contract-Amendment\Am end mend No.6 Rev(07-13-04).doc
I —
4
CIA
o41a
8
Olt X, -M Z
,,,,,� .(�i su or•oo.rs 2'a b' i
%Y 1 t- �.� � Pl1+M IGS I UI M1�✓V I Wu 11 �
.yr y�..f Y.• +.-.lil 1 r _ v AC M"••:'^ Y.M 1� A.
LOVE
1./L N4�Ta_j .•.� K Y0. S St' 1
Qt
fb II V It
Y
. :
•['3 _ �a >7 d :. n e9 a x. e7 K n r9 I' � �� ,t �� ..` n � a I' � rl --- - i�_
400
• .' �. ' •``— � u b' Y.N.M 37X IDpf.7d]
'N �9]I]Y� ]I b, It rl t7 I ♦'ll r' �AId t sEt}�Ie,]7 il'2 \ �'�
SA.TAOPY EEO"fAS(-�g
Na!SA 74di6!.
N`
PHASE
RToe®PUp IlC \
MOM=9.![Iy MC ��y
RPIo NR IW
�91YG U'! YH Ml 1 !tA I4a,.Jn _
Vffr CWI A
Oa>ra wY IIY9iaN —>�—�
r..
City of Fort Worth
Amendment No.6
Contract No. DOE 3312
LGG No. 210069.00
Water and Sanitary Sewer Extension for Bryson Tract
LOPEZGARCIA GROUP
Direct Labor
Item Labor Category Hours Rate Labor Cost
_Principal 1 $ 162.75 $ 162.75
Project Manager 22.5 $ 136.50 $ 3,071.25
Civil Engineer 36.5 $ 99.75 $ 3,640.88
Civil En ineer-In-Training 103 $ 68.25 $ 7,029.75
Senior Clerical/Project Administrator 1 $ 52.50 $ 52.50
Surveyor-RPLS 2 $ 110.25 $ 220.50
Surveyor-LSIT 0.5 $ 78.75 $ 39.38
Two-Person Survey Crew 4 $ 99.75 $ 399.00
Subtotal for Direct Labor $ 14,616.00
Overhead(if applicable) Rate: 0.00% $ -
Professional Fee(if applicable) Rate: 0.00% $ -
Total Direct Labor $ 14,616.00
Direct Costs
Travel Description of travel: Local Office to City and Site
Unit of
Description Measure Quantity Rate Totals
Mileage Mile 245 $ 0.37 $ 89.43
Mileage Survey Mile 45 $ 0.37 $ 16.65
Subtotal of Travel Costs $ 106.08
Other Direct Costs
Unit of
Description Measure Quantity Rate Totals
N/A 0 0 $ - $ -
Subtotal of Other Direct Costs $ -
Subcontractor Costs
Unit of
Description Measure Quantity Rate Totals
Mylar Reproduction EA 16 $ 12.00 $ 192.00
Original Copies 20 Sets PG 320 $ 2.00 $ 640.00
Subtotal of Subcontractor Costs $ 832.00
Subtotal of Direct Costs $ 938.08
Professional Fee(if applicable) Rate: 0.00% $ -
Total Direct Costs $ 938.08
Project Totals
Total Labor Costs $ 14,616.00
Total Direct Costs $ 938.08
TOTAL DELIVERY ORDER COST $ 15,554.08
P:\FW\210069.00\Doc\Contract-Amendment\Amendment No.6 Rev Summary(07-13-04) 4:20 PM
City of Fort Worth
Amendment No.6
Contract N DOE 3312
LGG No. 210069.00
Water and Sanitary Sewer Edension for Bryson Tract
7113/2004
LOPF2GARCIA GROUP
Direct Labor-Task Details
CMA Erphror In swr.Crania*/ T-P-Swy
Ta.k N. Task Herne P*-Vat Pr 1.1 M-g. CM Erg- Tronkg Pro. Adi44atrmm Su-W-RPLS Sur%%r-LM Crow Total for Task
to Bask:Engknerkg
1.1 a'WL Dealgn(660 LF) 1 6 24 S 2.572.50
1.2 ONOC I 1 $ 23625
LaMMndex Reviebns(SHT9 2&
1'3 3) 0.5 1 S 118.13
1.4 Una NB WL R.Naiora(SFIT 4,12) f 2 $ 23625
1.5 Coat Esematee 0.5 6 $ 477.75
1.7 Vold LIM A SS,(SHT 5) 0.5 0.5 $ 84.00
1 A Void Lina A SS,(SHT 6) 0.5 0.5 $ 84.00
l A Total 0 23 11.5 34 0 0 0 0 $ 3,1106.66
2A Basn study
2.1 Bean Research 4 E 273.00
2.2 Capacity CaM;OlaUora a S 798.00
2.3 B.Meadows CADD Convera on 1 $ 6825
2.4 B.Meadows Symen Eveaatlon 2 $ 199.50
2.0 Total 0 0 10 5 0 0 0 0 $ 1,333.76
3.0 coordination
3.1 Conceptual Meeting 2 $ 273.00
32 COFWIEMSISO Mee&Q 4 S 546.00
3.3 PnFnroryMeetrg 2 $ 273.00
3A COFWrEWISD Fka1 Meeting 4 $ 546.00
3.0 Total 0 12 0 0 O 0 0 0 S 1,638.00
4.0 Mien.Bervkea
4.1 Traffic Cartrol w/Std.Detak 1 12 40 $ 4,063.50
42 Identify and Prepare Shat for
Easement Vambon 1 1 i8 2 $ 1,68.525
43 Dry Saver Consh-tion
Racanmsdabon 1 1 E 215.25
4A Total 1 2 /3 58 1 2 0 0 S 81964.00
8.0 Sarvk:e Go, ..done
5.1 Sett W`rake DorrryTmvel 2 S 199.50
52 Stmy Shot for 6 Lda 2 E 109.50
5.3 S-ey Conversion 0.5 S 39.38
5.4 Renals Calm 1 $ 98.75
5.5 Remove CADD 5 S 34125
5.8 Ske Vlad for Cooed. 4 $ 546.00
5.7 Commudty Coord. 1 S 136.50
5.8 ONOC 1 1 1 $ 304.50
5.0 Tow 0 6 2 a 0 0 0.6 4 S 1,im.35
6.0 [enter general hedkq]
6.0 Total 0 0 0 0 0 0 6 0 S
7.0 Ceder gew.l heading]
7.0 Total 0 0 0 0 0 0 0 0 S -
8.0 [enter general hawing]
8.0 Total 0 0 0 0 0 0 0 0 S
9.0 leder general headkg)
9.0 Ta4al 0 0 0 0 0 0 0 0 S -
10.0 [order general laadInM
10.0T.4e1 0 0 0 0 0 0 0 0 $ -
ToW Direct Labor Hoare 1 22.5 38.5 103 1 2 0.5 4
Rola S 162.75 S 138.50 S 00.75 $ 6825 S 52.50 S 11025 S 78.75 $ 88.75
Total Labor Coals S 18275 S 3,07125 S 3,840.116 S 7,029.75 S 5230 S 220.60 S 39.38 S 399.00 S 14,615.00
PlFWV10069.0010edCm4ect-AnwrWna&A.-.k-k No aRev S..-q(07-13-04) 4:30 PM