Loading...
HomeMy WebLinkAboutContract 30714 AMENDMENT NO. 1 STATE OF TEXAS S CITY SECRETARY CONTRACT NO3MIL (No M&C Needed) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and Teague Nall and Perkins, Inc. , (Engineer) made and entered into City Secretary Contract No. 27917, (the Contract) which was authorized by the City Council by M&C C-19183; on the 8th day of August 2002; and WHEREAS, the Contract involves engineering services for the following project: Water Replacement Contract 2002 STM-C, F and G WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1 . Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated September 27, 2004 , a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $11,238.00. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $199,454 . 00. ORIGINAL 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effec(t�. EXECUTED on this the 1 cli day of L 1 l'� > 2004, in Fort Worth, Tarrant County, Texas. ATTEST: (k) )�L Conti-act Authorization Marty Hendrik City Secretary Date APPROVAL RECOMMENDED: aPROVED: A. Douglas Rademaker, P.E. A. t Director, Department of Assistant City Manager Engineering TEAGUE NALL AND PERKINS, INC. ENGINEER By: Name: Ty Hilton, P.E. , Principal 1100 Macon Street Fort Worth, TX 76102 APPROVED AS TO FORM AND LEGALITY: U Gary Steinberger Assistant City Attorney -2- Responsive Service. Reliable Results. TES 0GUE NALL AND PERKINS ENGINEERS ♦ SURVEYORS ♦ CONSULTANTS September 27, 2004 Mr. Tony Sholola, P.E. Project Manager Department of Engineering City of Fort Worth 900 Monroe Street, Suite 201 Fort Worth, TX 76102 RE: Water Line Replacement Contract 2002 STM — C, F, & G Water Project Nos. PW53-060530176440, PW53-060530176470, and PW53-060530176480 D.O.E. Project Nos. 3703, 3706, and 3707 Fee Proposal for Contract Amendment No. 1 Dear Mr. Sholola: Teague Nall and Perkins, Inc. is submitting this fee proposal for Amendment No. 1 to the contract for the above referenced project based on additional services requested. The following is a brief description and cost for the additional services provided on this project: 1. Additional Services to Subdivide the Project into Multiple Construction Contracts The original engineering services contract was for the preparation of one set of construction plans and specifications for the entire project. The additional compensation for preparing plans and specifications for multiple projects is summarized below: • Basic service for preparing a cover sheet, project layout sheet, and survey control sheet per project, STM-F and STM-G = $ 2,710 • Additional compensation for printing plans and specifications for each project, STM—F and STM—G = $ 5,528 Subtotal Subdividing Project into Multiple Constr. Contracts = $ 8,238 2. Additional Service to Prepare an SWPPP for General Construction Permit The engineering services contractdoes not include the preparation of an SW3P forgeneral construction permitting. The contract was negotiated before the new regulations of the Texas Commission on Environmental Quality(TCEQ)required that an SW3P be prepared for construction activities that result in the disturbance of one to five acres. The total length of water line to be constructed in STM—F is 9,532 LF. Considering a 5 foot trench width for the water line replacement down each street,the total disturbed area is 1.09 acres. As for the STM-G project, the total disturbed area is less than one acre and therefore does not require an SW31P be prepared. Subtotal Preparation of SWPPP for the STM — F project: _ $ 3,000 Total Contract Amendment No. 1: _ $ 11,1100 Macon Street • Fort Worth,Texas 76102w • 817.336.5773 phone • 817.336.2813 fax iL ww.tnp-online.com Fort Worth .. Denton For additional services provided pursuant to this Amendment No. 1,we request compensation in an amount not to exceed $11,238.00. Such payment shall be made in accordance with the payment terms specified in the Contract. Summary of Contract Fee: Original Contract Amount: $188,216.00 Amendment No. 1 (Not-to-Exceed): $ 11,238.00 Revised Contract Amount (Not-to-Exceed): $199,454.00 Thank you for consideration of this contract amendment request. If you have any questions, please do not hesitate to call me. Sincerely, TEAGUE NALL AND PERKINS, INC. Ty ilton, P.E.