Loading...
HomeMy WebLinkAboutContract 30815 COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary �/ COUNTY OF TARRANT § Contract No3c WHEREAS, Thos S. Byrne, Ltd., hereinafter called "Developer", desires to make certain improvements to Texas Wesleyan University Housing, an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a municipal corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: That said Developer, acting herein by and through Keith Muskrat, its duly authorized Vice-President, and the City, acting herein by and through Marc Ott, its duly authorized Assistant City Manager, for and in consideration of the covenants and conditions contained herein, do hereby agree as follows: I. General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Contract as if copy herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder. B. The requirements of the Policy shall govern this Community Facilities Agreement, provided, however, that any conflict between the terms of this Community Facilities Agreement and the Policy shall be resolved in favor of this Agreement. C. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy. D. The Developer shall award all contracts for the construction of community facilities in accordance with Section H, paragraph 7 of the Policy. 1 CFA FORMAT WITH 4%.doc Texas Wesleyan University Housing , September 15,2004 '' 'rl - , � f: E. The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. F. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the allezed na-lizence of the City of Fort Worth, its officers, servants, or employees. G. Developer shall install or adjust all of the required utilities to serve the development or to construct the improvements required herein. H. In the event that City participation exceeds $25,000, Developer agrees that no street construction or storm drainage will begin prior to City Council approval of this Community Facilities Agreement. (Article 104.100, Ordinance 7234). I. Developer agrees that no lot shall be occupied under a certificate of occupancy until the improvements required herein have been constructed (Article 104.100, Ordinance 7234). J. Developer hereby releases and agrees to indemnify and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this contract. 2 — CFA FORMAT WITH 4%.doc _ 1 Texas Wesleyan University Housing c i September 15,2004 T� •.�.`J+Y 31 Yy�1 n K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer required to construct current and future improvements provided for in this agreement. L. Developer agrees to construct proposed improvements as shown on the exhibits attached hereto. The following exhibits are made a part hereof: Water(A) None; Sewer (A-1) None; Paving (B) attached; Storm Drain (B- 1) attached; Street Lights and Signs (C) attached. II. Street and Storm Drain Facilities A. The Developer(s) agree to install or to cause to have installed, the street, storm drainage, street lighting, street name sign and other community facilities improvements shown as "current improvements" on the attached Exhibits B, B 1, and C. B. As shown below in the "Summary of Cost for Street and Storm Drain Facilities", the Developer shall fund its share of "current improvements" and shall pay to the City for its share of the cost of street, storm drainage, street lighting, street name signs as shown on the attached Exhibits B, B1, and C. The estimated total cost of current improvements and related support services specified in this agreement, including design, construction and inspection is estimated to $32,597.36. Item Developer City Cost Total Cost Cost A. Construction 1. Streets $ 28,459.00 $ 28,459.00 2. Storm Drainage $ - $ - 3. Street Lights $ 3,000.00 $ 3,000.00 4. Street Name Signs $ - $ B. Engineering Design $ C. Construction Engineering $ - and Mana ement by DOE 4% $1,138.36 $ 1,138.36 TOTALS $ 32,597.36 $ - $ 32,597.36 Notes: 1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets. The developer is responsible for installation of sidewalk and a separate financial guarantee is required in the form of a bond or check for the cost of the sidewalk. 3 _ CFA FORMAT WITH 4%.doc Texas Wesleyan University Housing September 15,2004 1 i.a 2. Developer's column for Item C represents four percent (4%) cost for construction inspection fees and materials testing. The City will pay additional inspection fee over 4%. 3. City not preparing plans and specifications. IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed this instrument in triplicate, at Fort Worth, Texas this the 16 day of September, 2004. Approval Recommended: ATTEST: Transportation and Public Works Department Marty Hendrix Robert Goode, P. E. City Secretary Director - j n --01 I/(L JJWP ! ) C6>gtract-- A-uthorizatioa City Of Fort Worth Date �~ Marc Ott Assistant City Manager Approved as to Form: Assistant City Attorney ATT DEVELOPER By: Corporate Secretary CFA FORMAT WITH 4%.doc Texas Wesleyan University Housing i September 15,2004 ITEM APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT (Furnish and install, including all appurtenant work, complete in place, the following items) UNIT II: 1. 63 SY Construct 8" 4000 PSI concrete pavement Per Square Yard: Forty Five Dollars and no cents $ 45.00 $ 2,835.00 2. 470 SY Construct 4"— 3000 PSI concrete sidewalk Per Square Yard: Thirty Six Dollars and no cents $ 36.00 $16,920.00 3. 3 EA ADA Ramp Per Each: Five Hundred Dollars and no cents $ 500.00 $ 1,500.00 4. 55 LF Sawcut and remove existing concrete curb and gutter Per Linear Foot: Twelve Dollars and no cents $ 12.00 $ 660.00 5 148 SF Remove existing sidewalk Per Square Foot: Three Dollars and no cents $ 3.00 $ 444.00 6. 55 LF Construct longitudinal buttjoint Per Linear Foot: Twenty Dollars and no cents $ 20.00 $ 1,100.00 7. 2 EA 4' Square manhole Per Each: Two Thousand Five Hundred Dollars RECEIVE 0 and no cents $ 2,500.00 $ 5,000.00 SEP 0 ? 2004 -. TOTAL AMOUNT BID - PAVING $28,459.00 - MADatMCivil\2004\C04028-Texas Wesleyan University-Ft Worth\Specs&Contract Docs\Complete Spec 8 Contract Document 09 02 04.doc P II } o In - of S J / m =QWT1OD T Q j W,, fig i / ■ _ Ka-' 0689 a f / F ` ( � s �/7 j o, a / i q =Zap,: I I Z Z I b N� UFFLi � /—y} 5 orn v5 .� gCC a =o W Q J c Yr U In LiN mQ a " R x (� W LJ O e di� ITU 1111 t I I I I IiJ I I U 0 i I � \ S Iii I cL �w & $cF cxi Z p z 0'909-:UO M g_ o Of Lj Cf Lj m I F a s I a LLJ m W d cr p I Z Z Q O W O I C) N u W LLJ 00. LL I I I m I W Ocf) O j W W M a I Lt �� I -1 00 J LIJ m I fI I r r I I I of e I I I E k SZl9�ii � SII F I R E E E"-E-B-_ f U. U. SEP ZOD4 I � k € 3Sd>aag axnF3 A b �ISa3A1N13! lY9 io�1 ld8 )=j-LI a Ln t�t nq1 0 of a cn c sod U a~ I w Z S m < orn�rs g I � ob soma — Vl J 38R / X my� O c 0 a K I X / I � v �s� I / � I I I II 3 WyFa I f � a I aon d I ~ uzjS I F pig k �„��� •cos-� � � S a o�� I F_ I Wee I I I I I I I I I I nm Ie I I I I I 9ZL0-i� 1 � - qII t P L ,.- I I yt. . F meg eua11 x1143 A M 6834INn NYA31S3M SdX31 F I dB 47oj.L LY9 4Jo11 I. STREET LIGHT COST ESTIMATE QUANTITY UNIT COST TOTAL COST INTERSECTIONS 0 EA $ 2, 000 $0, 000.00 MID-BLOCK RESIDENTIAL 0 EA $ 2, 000 $0, 000 . 00 CHANGE OF DIRECTION RESIDENTIAL 0 EA $ 2, 000 $0, 000. 00 MID-BLOCK COLLECTOR 0 EA $ 2, 000 $0, 000 . 00 MID-BLOCK ARTERIAL PARKWAY 0 EA $ 2, 500 $0, 000 . 00 MID-BLOCK ARTERIAL MEDIAN 0 EA $ 2, 500 $0, 000. 00 RELOCATE EXISTING LIGHT 2 EA $ 1, 500 $3, 000 . 00 Subtotal $3,000. 00 City' s Cost $00, 000 . 00 Developer's Subtotal $3,000.00 10% Contingencies $0,000.00 Project Total $3,000.00 Adjacent Developer's Cost $0,000.00 Developer's Cost $3,000 . 00 2% Inspection Fee $0,00. 00 CFA CODE #2004129 DEVELOPER' S COST: $3,000 . 00 TEXAS WESLEYAN UNIVERSITY HOUSING September 17 , 2004 Fort Worth, Texas September 20, 2004 PAGE I OF Exhibit C II. STREET LIGHTS WORK DESCRIPTION: 1 . The Developer shall provide for the installation of streetlights at the approximate locations shown in Exhibit "C", immediately after final acceptance of the street construction, in accordance with engineering plans and specifications approved by the Transportation and Public Works Department . 2 . Streetlights on residential and /or collector streets can be installed using overhead or underground conductors with the approval of the Director of Transportation and Public Works . 3 . The City will install all the streetlights that use overhead or underground conductors on residential, and collector streets . the developer agrees to pay the city the amount shown below prior to the City starting it' s design efforts. 4 . Streetlights on arterial streets shall be installed with underground conduit and conductors. 5 . The Developer agrees to dedicate all easements required for the installation and maintenance of the street lights and to provide for the installation of any electrical transformers required for the proper operation of the street lights 6. The estimated cost of this street light installation is detailed on page 1 of exhibit C and is summarized below, the street lights will remain the property of, and will be maintained by the City of Fort Worth. DEVELOPER' S COST: $3,000.00 TEXAS WESLEYAN UNIVERSITY HOUSING September 17, 2004 FORT WORTH, TEXAS CFA CODE #2004129 Page II of Exhibit C III . "STREETLIGHTS" REMOVE TWO LIGHTS AVE A 2 TEXAS WESLEYAN UNIVERSITY HOUSING Page III of Exhibit C Iv STREET NAME SIGNS 1 . The City of Fort Worth will install the street name signs upon final approval of the street construction. The street name signs will remain the property of, and will be maintained by, the City of Fort Worth. 2. The Developer will pay for the street name sign installations required for this development to the extent of $100.00 per intersection. This unit cost will be revised annually by the Department of Transportation and Public Works to reflect prevailing costs of materials and labor. 3. This development creates the following zero (0) intersections at a cost to the Developer of $0.00: (Street name signs are existing on both ends of Ave A.) Texas Wesleyan University Housing CFA code: 20041269 September 9, 2004