HomeMy WebLinkAboutContract 30818 COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary /
COUNTY OF TARRANT § Contract No.3o !
WHEREAS, BH Development Two, L.P. , hereinafter called "Developer",
desires to make certain improvements to Hi.ghpoint Hill Phase 1 , an addition to
the City of Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
That said Developer, acting herein by and through Robert Barham, President of
Barham & Harris, Inc., its duly authorized General Partner , and the City, acting
herein by and through Marc Ott, its duly authorized Assistant City Manager, for and in
consideration of the covenants and conditions contained herein, do hereby agree as
follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated
March 2001, approved by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Contract as if copy
herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of this
Community Facilities Agreement and the Policy shall be resolved in favor
of this Agreement.
C. Developer shall provide financial security in conformance with paragraph
6, Section II, of the Policy.
D. The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy.
E. The contracts for the construction of the public infrastruct re sFiaixlj._
administered in conformance with paragraph 8, Section II, of tile RA&��U
CFA REVISED FORMAT WITH 4%.doc 1
F. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers,
agents and employees from all suits, actions or claims of any character,
whether real or asserted, brought for or on account of any injuries or
damages sustained by any persons (including death) or to any property,
resulting from or in connection with the construction, design, performance
or completion of any work to be performed by said Developer, his
contractors, subcontractors, officers, agents or employees, or in
consequence of any failure to properly safeguard the work, or on account
of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub-contractors, officers, agents or
employees, whether or not such injuries, death or damages are caused,
in whole or in part, by the alleged negligence of the City of Fort Worth,
its officers, servants, or employees.
G. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
H. In the event that City participation exceeds $25,000, Developer agrees that
no street construction or storm drainage will begin prior to City Council
approval of this Community Facilities Agreement. (Article 104.100,
Ordinance 7234).
I. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been constructed
(Article 104.100, Ordinance 7234).
J. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications and
cost estimates supplied by the Developer for this contract.
K. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to construct
current and future improvements provided for in this agreement.
L. Developer agrees to construct proposed improvements as sliowi� on`-Tie
exhibits attached hereto. The following exhibits are made a part hereof.
CFA REVISED FORMAT WITH 4%.doc 2
Water (A) None; Sewer (A-1)None; Paving (B) attached; Storm Drain (13-
1) attached; Street Lights and Signs (C) attached.
if. Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibits B, B 1, and C.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibits B, B1,
and C. The estimated total cost of current improvements and related
support services specified in this agreement, including design,
construction and inspection is estimated to be $895,229.31.
Item Developer City Cost Total Cost
Cost
A. Construction
1. Streets $ 623,276.28 $ 623,276.28
2. Storm Drainage $ 195,501.90 $ 195,501.90
3. Street Lights $ 42,900.00 $ 42,900.00
4. Street Name Signs $ 800.00 $ 800.00
B. Engineering Design
C. Construction Engineering
and Management by DOE
4% $ 32,751.13 $ 32,751.13
$ 895,229.31 $ 895,229.31
Notes:
1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets.
The developer is responsible for installation of sidewalk and a separate financial
guarantee is required in the form of a bond or check for the cost of the sidewalk.
2. Developer's column for Item C represents four percent(4%) cost for construction
inspection fees and materials testing. The City will pay additional inspection fee over
3. City not preparing plans and specifications.
CFA REVISED FORMAT WITH 4% 3
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager,
attested by its City Secretary, with the corporate seal of the City affixed, and said Devel per
has executed this instrument in triplicate, at Fort Worth, Texas this the day of
) 2004.
Approval Recommended:
Transportation and Public Works
Department
Robert Goode, P. E.
Director
Contract Authorization City of Fort Worth
Date
Marc Ott
Assistant City Manager
ATTEST:
Marty Hendrix
City Secretary
Approved as to Form:
Assistant City Attorney
ATTEST: D ER:
B D ent Two, L.P.
Corporate Secretary obert Barham, President of
arham & Harris, In:., _ _
It's General Partner £ _
f 1'
." At
CFA REVISED FORMAT WITH 4%.doc 4
Q
d'
z W O
O Q c�
0 N
� I
i U o
Z
LILJJ
Z O
J
o>
z
Q wo y W N
U)
= Q� Oo
i
n Q d-
0
3S� Hi r� W
1S ��IHdW3H
TIE
J 2
U
2
00
�_ L
� U NON
ix
Oa
Z J� � �
C3
o() ca
x o CN
Qd X31MOK No !-'
c
TT J W m
1 0� ` Q
mLjj
V1
Z J �, o
� � 3
u1 �
� c
4
L �
-71
J @
Opinion of Probable Cost
DATE: 8.27.04 JOB NO.: 04-120
OWNER: BH DEVELOPMENT TWO, L.P.
PROJECT: HIGHPOINT HILL: EXHIBIT B - STREETS
ITEM NO. DESCRIPTION TOTAL QTY. UNIT UNIT PRICE COST
DEVELOPER COST
1 6"Concrete Pavement 19,685 S.Y. 18.75 $369,093.75
2 7"Concrete Pavement 4256 S.Y. 20.50 $87,248.00
3 Connect to Exist. Pavement 0 L.F. 7.00 $0.00
4 6' Lime Stabilized Subgrade 25257 S.Y. 1.65 $41,674.05
5 Lime (6%) 379 Ton 95.00 $36,005.00
6 7"Attached Concrete Curb 11,856 L.F. 1.50 $17,784.00
7 Standard Dead End Barricade 5 Ea. 400.00 $2,000.00
8 4"Thick Concrete Sidewalk 4,964 S.F. 2.50 $12,410.00
9 Standard Handicap Ramp 1 Ea. 400.00 $400.00
Subtotal Developer Cost $566,614.80
Contingency 10%) $56,661.48
TOTAL DEVELOPER COST $623,276.28
Inspection Fee (4%) $24,931.05
PREPARED: OL CHECKED BY: SHEET NO.: 4
CIVILworks Engineering
1192 Boling Ranch Road ` Azle, Texas 76020 ` Phone(817) 448-9595 ' Fax(817) 448-6390
Opinion of Probable Cost-
DATE:
ost_DATE: 8.27.04 JOB NO.: 04-120
OWNER: BH DEVELOPMENT TWO, L.P.
PROJECT: HIGHPOINT HILL: EXHIBIT B-1 - STORM DRAIN
ITEM NO. DESCRIPTION TOTAL QTY. UNIT UNIT PRICE COST
DEVELOPER COST
1 Standard 10' Curb Inlet 9 Ea. 1,850.00 $16,650.00
2 Standard 15' Curb Inlet 1 Ea. 2,600.00 $2,600.00
3 Standard 20' Recessed Curb Inlet 1 Ea. 3,500.00 $3,500.00
4 Standard 4'Square SDMH 2 Ea. 1,500.00 $3,000.00
5 Standard 5'Square SDMH 1 Ea. 1,600.00 $1,600.00
6 24"Class III RCP 644 L.F. 40.00 $25,760.00
7 30"Class III RCP 358 L.F. 52.00 $18,616.00
8 42"Class III RCP 72 L.F. 90.00 $6,480.00
9 48"Class III RCP 725 L.F. 95.00 $68,875.00
10 6'x4' RCBC 44 L.F. 220.00 $9,680.00
11 24"Standard Concrete Headwall 1 Ea. 1,800.00 $1,800.00
12 Double 30"Standard Conc. Headwall 2 Ea. 2,200.00 $4,400.00
13 6'x4' RCBC Standard Conc. Headwall 1 Ea. 2,600.00 $2,600.00
14 48" RCP Pipe Plug 1 Ea. 250.00 $250.00
15 Curb Inlet Sediment Filter 11 Ea. 200.00 $2,200.00
16 Type"A"Grouted Rock Rip-Rap 175 S.Y. 45.00 $7,875.00
17 Trench Safety 1843 L.F. 1.00 $1,843.00
Subtotal Developer Cost $177,729.00
Contingency (10%) $17,772.90
TOTAL DEVELOPER COST $195,501.90
Inspection Fee (4%) $7,820.08
PREPARED: OL CHECKED BY: SHEET NO.: 5
CIVILworks Engineering
1192 Boling Ranch Road ' Azle, Texas 76020 • Phone(817) 448-9595 ' Fax(817) 448-6390
U)
o _ - - _- W
OLLJ-
_II c
� w pl
w U) F—
cD
Q 0 N
U
I V)
I M
MM p
M K &jR RIGH7 OF WAY ) W
WIDTH RIGHT
(VARIABLE -
"f
r / i
LLI
W
w N
LLJ
U Zzw
1 io
L
s
—17 1 _ _
I m 1II /
O
LLJ
ZI 11 N n ^ In
L, I,.
I n I N 2 a l C OD
- - m �
04
LU
aoz
0
- II1
c
G�'� L m
O 2LLJ
� 0
U 0 a -
0z U E
z w
0 m \`•• 0
r LU
w z a
J
11 1`�
i
I
CD
O
w w
J
U
� o N
00
p O
U
J
W o m p (!1
D L O0
RNLR
--Lo � LEKW AYH RIGHT
(u RIAS I
- 1
_ - 1 S n _
m �
Z
---- �4,
LLJ
a
W N
Q �o ``�0 m
1. , 1
CN
r
'I I'_P / -
1
1 rh' i ' i � V lot
N 0,
cli
CN
LUI ,
E
w
`L J
u
I � W \• 1t U
z
N
z
o V
--- � -
II uiO
Lli 'd W I
J F- F- d 4d
v Z o _ = z -VV Q N
(n W J J (n C9 C9 U_'
W ww' wwriLr, `— O
J Of w w Lu
000 �n � �n
_ o 0 0
M K_&T. RAILROA OF WAY ) �- 0 0 a - - - J
- - (VARIABLE `"10TH RIGHT _ , a_ a a
_ _ -
n f a/'__ <
C)
Q =� W N
J ' I
I � L
TT I I
<1 v U O
— ^ a
wa w O��n
� ^A
� C�
Pap
IN
N -
'<+
{ Q 1+ \ v O
I Y '
\ J
3
I o
% /a E
J U E
I
Li
C 1
I . STREET LIGHT COST ESTIMATE
QUANTITY UNIT COST TOTAL COST
INTERSECTIONS 7 EA $ 2, 000 $14, 000.00
MID-BLOCK RESIDENTIAL 7 EA $ 2, 000 $14, 000 . 00
CHANGE OF DIRECTION RESIDENTIAL 3 EA $ 2, 000 $6, 000. 00
MID-BLOCK COLLECTOR 5 EA $ 1,000 $5,000 .00
MID-BLOCK ARTERIAL PARKWAY 0 EA $ 2, 500 $0, 000. 00
MID-BLOCK ARTERIAL MEDIAN 0 EA $ 2, 500 $0, 000. 00
RELOCATE EXISTING LIGHT 0 EA $ 1, 500 $0, 000 . 00
Subtotal $39,000.00
City' s Cost $00, 000 . 00
Developer's Subtotal $39,000.00
10% Contingencies $3,900 .00
Project Total $42,900.00
Adjacent Developer's Cost $5,500.00
Developer's Cost $42 ,900 .00
2% Inspection Fee $0 ,00.00
CFA CODE #20040127
DEVELOPER' S COST: $42 , 900 . 00
(REVISED 10-01-04)
HIGHPOINT HILL, PHASE I
September 7 , 2004
Fort Worth, Texas
October 1 , 2004
PAGE I OF Exhibit C
II . STREET LIGHTS WORK DESCRIPTION:
1 . The Developer shall provide for the installation of streetlights at
the approximate locations shown in Exhibit "C", immediately after
final acceptance of the street construction, in accordance with
engineering plans and specifications approved by the Transportation
and Public Works Department.
2 . Streetlights on residential and /or collector streets can be
installed using overhead or underground conductors with the approval
of the Director of Transportation and Public Works .
3. The City will install all the streetlights that use overhead or
underground conductors on residential, and collector streets. the
developer agrees to pay the city the amount shown below prior to the
City starting it's design efforts.
4 . Streetlights on arterial streets shall be installed with underground
conduit and conductors .
5. The Developer agrees to dedicate all easements required for the
installation and maintenance of the street lights and to provide for
the installation of any electrical transformers required for the
proper operation of the street lights
6. The estimated cost of this street light installation is detailed on
page 1 of exhibit C and is summarized below, the street lights will
remain the property of, and will be maintained by the City of Fort
Worth.
DEVELOPER'S COST: $42,900.00
HIGHPOINT HILL, PHASE I
September 7, 2004
FORT WORTH, TEXAS
(REVISED 10-01-04)
CFA CODE 2004127
Page II of Exhibit C
III.
"STREETLIGHTS"
INTERSECTIONS
SUMMERWOOD DR & MCALISTER RD 1
VIEW POINT IN & MCALISTER RD 1
CAPROCK PL & MCALISTER RD 1
SUMMERWOOD DR & BRIAR HILL IN 1
CAPROCK PL & BRIAR HILL IN 1
FM 1187 RD & HEMPHILL ST 1
MCALISTER RD & HEMPHILL ST 1
MID-BLOCK
SUMMERWOOD DR 2
VIEW POINT IN 2
CAPROCK DR 3
HEMPHILL ST 5
CHANGE OF DIRECTIONS
VIEW POINT IN 1
EDGE CLIFF DR 2
HIGHPOINT HILL, PHASE I
Page III of Exhibit C
IV
S"fREET NAME SIGNS
1. The City of Fort Worth will install the street name signs upon final
approval of the street construction. The street name signs will remain
the property of, and will be maintained by, the City of Fort Worth.
2. The Developer will pay for the street name sign installations required
for this development to the extent of$100.00 per intersection. This
unit cost will be revised annually by the Department of Transportation
and Public Works to reflect prevailing costs of materials and labor.
3. This development creates the following eight (8) intersections at a cost
to -the Developer of$800.00:
McAlister Rd & Hemphill St
McAlister Rd & View Point Lane
McAlister Rd & Carrock PI
McAlister Rd & Surnmerwood Dr
Briar Hill Lane & View Point Lane
Briar Hill Lane & Carrock PI
Briar Hill Lane & Summerwood Dr
Briar Hill Lane & Edge Cliff Dr
Highpoint Hill Addition
CFA code: 2004127 September 2, 2004