Loading...
HomeMy WebLinkAboutContract 31311-A3 AMENDMENT NO. 3 STATE OF TEXAS S CITY SECRETARY CONTRACT NO. 1— 3 (M&C Needed) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and Dannenbaum Engineering Corporation, (Engineer) made and entered into City Secretary Contract No. 31311 (the Contract) , which was authorized by the City Council by M&C C-20483 on the 11th day of January 2005; and WHEREAS, the Contract involves engineering services for the following project: 2004 Capital Improvement Project, Briarhaven-Fieldcrest Drainage Improvements; City Project No. 00085; DOE Project No. 4716 WHEREAS, it has become necessary to execute Amendment No. 3 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I, of the Contract is amended to include the additional engineering services specified in a proposal letter dated December 3, 2008, copies of which are both attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $10,084.00. 2. Article II, of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of ($101, 920 . 95) + ($47, 088 .00 for Amendment No. 1) + ($24,438 . 00 for Amendment No. 2) + ($10, 084 .00 for Amendment No. 3, this amendment) = $183, 530 .95. OFFICIAL RECORD CITY&E-CRETARY IN ORIGINAL 3 . All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect . EXECUTED on this the I day of 5L 2009, in Fort Worth, Tarrant County, Texas. ATTEST: V � Conti�acL ?!uthcrizatioa Marty Hendrix _ 41 Cnd 1c)9 City Secretary Care APPROVAL RECOMMENDED: APPROVED: / William Verke E. Fernando Costa Director, Department of Assistant City Manager Transportation & Public Works Dannenbaum Engineering Corporation Engineer By: Name:Wayne G. Ahrens, P.E. Principal 6421 Camp Bowie Blvd. Fort Worth, Texas 76116 APP RO ED AS TO FORM AND LEGALITY: Assistst City Attorney OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX DANNENBAUM ENGINEERING CORPORATION ■`�11'. 6421 CAMP BOWIE BLVD.,SUITE 400 FORT WORTH,TEXAS 761165421 (817)763-8883 v Years of Excellence December 3, 2008 Mr. Joseph Bergeron, P.E. City of Fort Worth 1000 Throckmorton Street Fort Worth, Texas 76102-6311 RE: 2004 Capital Improvements Drainage Project Briarhaven-Fieldcrest Drainage Improvements Supplemental Agreement No. 3 Mr. Bergeron: As you know, the field conditions on the Briarhaven drainage project required us to re- design the sanitary sewer (L-6783) adjacent to the storm in Briarhaven. This additional work was required due to decisions made early in the design process to avoid replacement of the sewer if possible. This sewer design has already been completed in order to help the City avoid remobilization costs from the contractor on site. Attached please find a Supplemental Agreement #3 for the above described sanitary sewer design. When possible, the unit prices from the contractor on the project were utilized. When there were not corresponding bid items, the unit prices from the low bidder on the Sanitary Sewer Main 238 project (designed by Dannenbaum & under construction) were used. We respectfully request the City's consideration of this contract amendment. If you have any questions or require any additional information, please do not hesitate to call. Sincerely, Brian D. O'Neill, P.E. Project Manager xc: Dena Johnson, P.E. Carlon Small G:\1210\4095-32\ADMIN\CONT'RAC-nSA#3\Letter Bergeron 2008-12-03.doc ATTACHMENT "B" COMPENSATION AND SCHEDULE 2004 CAPITAL IMPROVEMENTS DRAINAGE PROJECT BRIARHAVEN-FIELDCREST DRAINAGE IMPROVEMENTS SUPPLEMENTAL AGREEMENT No.3 PROJECT NO. 00085 I. Compensation: A. The Engineer shall be compensated a total lump sum fee of$ 10,084.00" as summarized in Exhibit`13-313". Payment of the total lump sum fee shall be considered full compensation for the services described in Exhibit"A" for all labor materials, supplies and equipment necessary to complete the project. B. The Engineer shall be paid monthly as described in Exhibit "B-1", Section 1 —Method of Payment. Each Invoice is to be verified as to its accuracy and compliance with the terms of this contract by an officer of the Engineer. II. Schedule: A. Phases 1 and 2 shall be completed immediately after the"Notice to Proceed"letter is issued. The Scope of Services is outlined in Attachment"A", Exhibit"A". EXHIBIT"B-1" (SUPPLEMENTAL TO ATTACHMENT B) METHOD OF PAYMENT 2004 CAPITAL IMPROVEMENTS DRAINAGE PROJECT BRIARHAVEN-FIELDCREST DRAINAGE IMPROVEMENTS SUPPLEMENTAL AGREEMENT No. 3 PROJECT NO. 00085 I. Method of Payment Partial payment shall be made to the Engineer monthly upon City's approval of an invoice from the Engineer outlining the estimated current percent complete of the total project. The aggregate of such monthly partial fee payments shall not exceed the following: Until satisfactory completion of Exhibit"A",Conceptual Engineering plan submittal and approval by the City, a sum not to exceed 30 percent of the total lump sum fee. Until satisfactory completion of Exhibits "A",Preliminary Construction Plan submittal to City, a sum not to exceed 60 percent of the total lump sum fee, less previous payments. Until satisfactory completion of Exhibits"A", Final Construction plan submittal and approval by the city,a sum not to exceed 90 percent of the total lump sum fee, less previous payments. II. Progress Reports A. The Engineer shall submit to the designated representative of Director of Department of Engineering monthly progress reports covering all phases of design by the 15`h of every month in the format required by the City. B. If the Engineer determines in the course of making design drawi.-:gs and specifications that the current construction cost estimate will be exceeded, whether by change in the scope of the project, increased costs or other conditions, the Engineer shall immediately report such fact to the City's Director of the Department of Engineering and, if so instructed by Director of the Engineering Department, shall suspend all work hereunder. EXHIBIT B-2 (SUPPLEMENT TO ATTACHMENT B) HOURLY RATE SCHEDULE 2004 CAPITAL IMPROVEMENTS DRAINAGE PROJECT BRIARHAVEN-FIELDCREST DRAINAGE IMPROVEMENTS SUPPLEMENTAL AGREEMENT No.3 Project No.00085 Employee Classification Rate/Hour Principal $258.00 Project Manager/Planner $170.00 Senior Engineer/QA-QC $145.00 RPLS $100.00 Project Engineer $110.00 Design Tech. $85.00 CADD Tech. $ 60.00 Clerical $ 58.00 2-Man Survey Crew $100.00 3-Man Survey Crew $120.00 4-Man Survey Crew $150.00 Reimbursables Cost+ 10% Mileage $0.585 Per Mile Reproduction work will be at current commercial rates. Subcontractors will be paid for at actual invoice cost plus ten percent(10016). 4082 Exhibit B-2 EXHIBIT"B-3A" SUMMARY OF TOTAL PROJECT FEES 2004 CAPITAL IMPROVEMENTS DRAINAGE PROJECT BRIARRAVEN-FIELDCREST DRAINAGE IMPROVEMENTS SUPPLEMENTAL AGREEMENT No. 3 PROJECT NO. 00085 Exhibit Exhibit Scope of Services Total Fee M/WBE % A. Design Services $ 10,084.00 $ 0.00 0.0 Construction Assistance $ 0.00 $ 0.00 0.0 TOTAL $ 10,084.00 $ 0.00 0.0 % of Proposed M/WBE Sub-Consultants Services Fees Total Fee None Proposed Non-M/WBE Sub-Consultants None EXHIBIT"B-313" FEE SUMMARY 2004 CAPITAL IMPROVEMENTS DRAINAGE PROJECT BRIARHAVEN-FIELDCREST DRAINAGE IMPROVEMENTS SUPPLEMENTAL AGREEMENT No. 3 PROJECT NO. 00085 ***SANITARY SEWER*** OPINION OF PROBABLE CONSTRUCTION COSTS $ 156,102.00 CURVE"A" 7.6%X 0.85 = 6.460% ENGINEERING DESIGN $ 10,084.00 TOTAL PAVING & STORM DRAINAGE FEE $ 10,084.00 10%FOR SUB ($ 0.00) $ 0.00 TOTAL FEE 10,084.00 SUMMARY OF TOTAL FEE AND BREAKDOWN OF DESIGN FEE (LESS SURVEY FEE) A. SUMMARY OF TOTAL FEE Service Description Water Sewer Paving/Drainage Total Engineering Services $ 0.00 $ 10,084.00 $ 0.00 $ 10,084.00 Surveying Services $ 0.00 $ 0.00 $ 0.00 $ 0.00 Total $ 0.00 $ 10,084.00 $ 0.00 $ 10,084.00 B. BREAKDOWN OF WATER, SEWER AND PAVING FEES (LESS SURVEY FEES) Total Paving/Drainage Fee(less survey fee)Breakdown by Concept, Preliminary and Final Design 1. Concept(30%)=(Total Drainage Fee—Paving Survey Fee)x(0.3) =$ 3,025.00 2. Preliminary(60%)=(Total Drainage Fee—Paving Survey Fee)x(0.6) =$ 6,050.00 3. Final (10%)=(Total Drainage Fee—Paving Survey Fee)x(0.1) = $ 1,009.00 Cb N O O O O O O O O O O O O O O O 00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O N LO O O O LO 0 0 0 O O N 0 0 'T 0 C14 00 O O I- O LO O V O r O M N N O N It J �- N O CO 0 0 0 0 0 0 r 0 c'') N (D r O Q O N C-) M Cfl N O M M T M T N d' tD U HT In EZ Ov F- 0 -0 U U a) � W a� p W 000000o0000u) 00 ❑ U O O O O O O O O O O O N 0 0 � �.noau� oornoo � o � c�i �i D. c9 0U-) 0 0 U) T CU 0 O Z O ea } H N N N N 0 LO d U-) LO O N r U) T `- N co Q T r r T r ~ M O IZ (� w ~ WQLLQQQU- < < U- QLLWLL Z J ? Jw > wwwJwwJLL, JJJ O U LUQ � a J z � J J Q Cf) LUCf) ❑ Z z ❑ ❑ Q W C/) U) � J Q t O Q LLI C:) J C/) J > W w c~n Q � —' z C,5 _O I_a— ~ w Q i U) C7 E Q ZZa (n F- z _zzm Z Z > ? cn ' w � z O = zQx Q O = > � d Q Q ~ O W a z 0- U) w J w O E w w Q Q Ww -jUw W p = _Z J W ❑ U_ U Z = Q ❑ W J U > z O U _ J IL JwUQ 0 0 Z J W1— Ua � QCfl ❑ W > ciQ 0 H rr O ❑ � JAZ W (nUpZ V1 ❑ Z M p z Q t 0 O Q � CO ❑ � � = (n222 W wC~ ZQ Z 0 � a � QQC7zzzz cn � z0 � O V a3 _ = o — � - - - } OU = U ~ _jvd v � cn � U � = U _ a, z W W w O w w w 0 } p W U U M m v d- � UUU � U � OZ _ — — — > j m ❑ ❑ >Q> Z > > > W 11 Q d N L d W (� (n > Q Q > ZZ Z Cl) o a) � JJJ � U) U) U) � � � OOz O m � z o w5OOQ [YIr � O0000 � uj � uj = 2 = JWww = z = wW WLLJ 0* Q � � � d Q Q Q O W W W Q � Q U) U Q O Z (n ❑ w � � � Ucncncn � � � ZZW H c tv = w c r M d' M CO LO d' (fl CO N 1` N r N Q� c 0 LO r r r 0') LO LO Lf) T r 0 0 L" 5 M N N N M M M r M N N N 't Z O O O O O O O O O O O O O O 0 O O O O O O O O O O O O O O d Cl- N LC) V Lo Lo M (A N NLr) N N L") O T r N r r T I- r T r T T N LO r O L- 00 I- r- LO 00 CC) O I- O O I.() N m N N N N C7 r m Ch C7 m CV M 00 ti O N N N N 00 N 00 r O N 0 0 0 O N O O O O J V N cY � � r N (D 'IT O O O q O T N O N N O O r r O O O O co r Cl) M C) 'Cr r W W z LL Q LL Q Q Q LL Q Q LL Q LL LL LL Od ? J W > W W W J W W J W J J J W L E W d n' > 2 � 0 LU Q. Q r- J Z I Q .Cc"CD 0 Z Q Q WCD a) ~ Q Cn � D- J a > LU CL L d � Q Q J Z Q F- F- .� u) F' L~i Q i U (D C/) z U) F- � cfl z C7 z Q LU c z z Z �- zZm O LLJ Q U m d F- F- OW am zz D- U) W JJ Ea Cn Q Q ww BULL _Z' L W W = Z F- W Q UUZ = QQF- wJ F- > ZOU J N m W Jew ~ UQU O � 2F= Z F- CQ QOQUWj � � co ZQ> LLUUZz d � Qz W - > In t � I0 Q co r N 2 of F- Q Q - ~ _ = JT LL1 �� Z Q � Q < = zUUU F- W z0 � I QU' - ZZZ U ~ OU = C) of J � � IT C0-) - 2 ZLLLWUwwW0 � � � 0U v " - UUU F- U Z Q = - - - � � � � Q � � � cQ > � ZtV uj w w w U) U) U) w � w O O Z J J J J = J = F- L1J c � 000Q - 000002 _ _ _ < W W W = Z = W W W x F^ W Z Z Z J Z W L d a > o : a000OW W W QW' QCnCO � � � Uwcow � F- � ZZm � N m I.C) 0 O rt m W O co N N N T M C 7 M T C7 N N N Iq E H Z C) 0 0 0 0 0 0 0 0 0 0 0 0 0 w CD 0 0 0 0 0 0 0 0 0 0 0 0 0 `m 3 m N C m N L `m m lvic5 u iceview . -In- Official b-O ficial site of the City of For 1'.utlh,-,xas CITY COUNCIL AGENDA �"ROR1> COUNCIL ACTION: Approved on 4/28/2009 DATE: 4/28/2009 REFERENCE ,C-23467 LOG NAME: 20ANIEND3-BRIARHAVEN NO.. CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Amendment No. 3 in the Amount of $10,084.00 to City Secretary Contract No. 31311, an Engineering Agreement with Dannenbaum Engineering Corporation, for the 2004 Capital Improvements Project- Bria rhaven-Fieldcrest Drainage Improvements RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute Amendment No. 3 in the amount of$10,084.00 to City Secretary Contract No. 31311 with Dannenbaum Engineering Corporation for the 2004 Capital Improvements Project- Briarhaven-Fieldcrest Drainage Improvements, thereby revising the total contract amount to $183,530.95. DISCUSSION: The 2004 Capital Improvement Program (CIP) includes funds for the Briarhaven-Fieldcrest Drainage Improvements Project. A request for qualifications to provide drainage design was issued by the City in January of 2004, an 35 design consultants submitted statements of qualifications, including Dannenbaum Engineering Corporation. Dannenbaum Engineering Corporation was selected to study the drainage in the subject area and provide subsequent design services for drainage improvements. On January 11, 2005, the City Council authorized the City Manager, via M&C C-20483, to execute a engineering agreement with Dannenbaum Engineering Corporation (City Secretary Contract No. 31311), in the amount of $101,920.95, for the design of the 2004 Capital Improvements Project- Briarhaven-Fieldcrest Drainage Improvements. This agreement was subsequently revised by two amendments, for a total contract amount of$173,446.96, as follows: Amendment No. 1, authorized by City Council on May 15, 2007, via M&C C-22115, in the amount of $47,088.00 for additional design services as requested by City staff. Amendment No. 2, administratively approved by the City on March 11, 2008, in the amount of $24,438.00 for sub-surface utility engineering services to determine the exact location of existing utilities. Amendment No. 3 to the project includes design services for the preparation of plans and specifications for relocation of sanitary sewer lateral 6783, required due to unstable soil conditions the threatened to collapse the sanitary sewer pipeline. Dannenbaum Engineering Corporation proposes to perform the necessary additional survey and design work for a lump sum fee of$10,084.00. City staff considers this fee to be fair and reasonable fi the scope of services proposed. This project is located in COUNCIL DISTRICT 3, Mapsco 89F. http://apps.cfwnet.org/council_packet/mc-review.asp?ID=l 145 1&councildate=4/28/2009 5/21/2009 M&u xeview FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Street Improvements Fund. TO Fund/Account/Centers FROM Fund/Account/Centers C200 531200 203280008533 $10,084.00 Submitted for City Manager's Office by: Fernando Costa (6122) Originating Department Head: William A. Verkest(7801) Additional Information Contact: Rick Shaffer (6821) ATTACHMENTS Briarhaven MC Map.pdf Briarhaven MC Map3.pdf http://apps.cfwnet.org/council_packet/mc_review.asp?ID=11451&councildate=4/28/2009 5/21/2009 rJLU- F t - X Cr LLI f t F5'T 4 R t l �+ 1, s�.. — N WE Briar haven-Field crest Drainage Improvements City Project No. 00085 S 0 125 250 500 Feet M&C: 20AM END3_BRIARHAVEN