Loading...
HomeMy WebLinkAboutContract 31316 AMENDMENT NO. 8 STATE OF TEXAS 8 CITY SECRETARY CONTRACT NO. �519� (No M&C Needed) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and Dunaway Associates, Inc . , (Engineer) made and entered into City Secretary Contract No. 27650, (the Contract) which was authorized by the City Council by M&C C-19049 on the 16th day of April, 2002, and subsequently revised by seven previous amendments; and WHEREAS, the Contract involves engineering services for the following project: Sanitary Sewer Rehabilitation Contract LV (55) . WHEREAS, it has become necessary to execute Amendment No. 8 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated January 31, 2005, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $24, 674 . 00 . 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $658, 657 .42 . 02-07-05P02' : 20 RCV0 ORIGINAL 3 . All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the day of 2005, in Fort Worth, Tarrant County, Texas. ATTEST: LLULdw�el P�\(�,� • Contract Authorizatic;, Marty Hendri , City Secretary Date APPROVAL RECOMMENDED: APPROVED: j f A. Douglas Rademaker, P.E. Marc A. , Ott ' Director, Department of Assistant City Manager Engineering Dunaway Associates, Inc . ENGINE! By: Name: Brian S . Darby, P.E. Associate 1501 Merrimac Circle, Ste 100 Fort Worth, TX 76137 APPROVED AS TO FORM AND LEGALITY: 4 Gary Steinberger Assistant City Attorney -2- DunawayEngineers lanners Surveyors Associates, L.1 Landscape Architects DAI No. 2001223 January 31, 2005 Mr. Mike Domenech, P,E, Project Manager City of Fort Worth Department of Engineering Fort Worth, Texas 76102 Reference: Amendment No. 8-Revised Sanitary Sewer Rehabilitation Contract LV (55) Sewer Project No. PS 58-070580175100 D.O.E. Project No. 3569 Dear Mr. Domenech: Dunaway Associates, Inc. is pleased to present this Amendment No. 8 for the following additional services that are beyond our original scope of services. Part 1 (M-17) • Split Contract 55, Part 1 (M-17) plans, specifications, and opinion of probable construction costs into 3 separate construction units for separate advertisement dates. • Re-design of 1,240 LF of sanitary sewer line for adequate flow capacity due to project split and maintain connection between existing sewer system and phased proposed sewer system. • Additional design of 325 LF of sanitary sewer line for temporary connection between existing sewer system and phased proposed sewer system. • Coordination with City and Pate Engineers for design &scheduling. • Additional pre-construction assistance for 2 extra construction units. a Bidding assistance—2 additional o Pre-construction conferences—2 additional o Public meetings—2 additional o Final inspections—2 additional tw • Reimbursibles ��1 �a 1; q 1501 Merrimac Circle•Suite 100•Fort Worth,Texas 76107 Tel:817.335.1121•Metro:817.429.2135•Fax:817.335.7437 www.dunawayassociates.com • Amendment No. 8 January 31, 2005 Page 2 A summary of the proposed budget for this revised amendment is as follows: Basic Fee Part 1 Split C-55 Part 1 M-17 plans, specs, &cost estimate $ 8,000.00 Re-design of 1,240 LF of sewer $ 6,200.00 Design of 325 LF of sewer $ 3,250.00 Coordination $ 2,000.00 Pre-construction assistance $ 4,000.00 Reimbursables 1,224.00 TOTAL PROPOSED AMENDMENT $ 24,674.00 A summary of the total project is as follows: Contract Description Fee Original Contract Design of 21,396 LF of Sewer Improvements $315,790.12 Amendment No. 1 Design of 6,576 LF of Sewer Improvements $86,307.50 Amendment No.2 Storm Drain TxDot permit,&CCTV of storm drain $22,270.0 Amendment No. 3 Design, re-route plans,easements,&SWPPP $123,659.30 Amendment No.4 Design of 1,125 LF of Sewer Improvements,TxDOT $24,865.9 permit and easements. Amendment No. 5 Design of 1,822 LF of Sewer Improvements&TROE's $24,682.60 Amendment No.6 Revise Contract 55 Part 1 plans $24,000.00 Amendment No. 7 Revise Contract 55 Part 2 plans $12,408.00 Amendment No. 8 Split Contract 55 Part 1(M-17) into 3 consturction units. $24,674.0 TOTAL PROJECT $ 658,657.42 Please review the enclosed information and do not hesitate to call me if you have any questions or require additional information regarding this proposal. Sincerely, DUNAWAY ASSOCIATES, INC. Brian S. Darby, P. Associate 2001223 Amendment#8-Revised MDomenech 05-0131 BSD.doc