HomeMy WebLinkAboutContract 32917 COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. )-kil WHEREAS, Chapel Hill Venture, L.L.L.P., a Georgia limited liability limited partnership, hereinafter called "Developer", desires to make certain public infrastructure improvements to Chapel Hill, Phase One, an addition to the City of Fort Worth, Texas; and NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: That said Developer, acting herein by and through Chapel Hill (Fort Worth) AIP III, L.L.L.P., its General Partner, in turn acting by and through Avanti Capital Associates, its General Partner, in turn acting by and through Avanti Management Partners, J.V., its Managing Venturer, in turn acting by and through Avanti Development Corporation, its Managing Venture, in turn acting by and through Marvin Shapiro, its duly authorized Vice President,and the City,acting herein by and through Marc Ott, its duly authorized Assistant City Manager,for and in consideration of the covenants and conditions contained herein,do hereby agree as follows: I. General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Contract as if copy herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder. B. The requirements of the Policy shall govern this Community Facilities Agreement, provided, however, that any conflict between the terms of this Community Facilities Agreement and the Policy shall be resolved in favor of this Agreement. C. Developer shall provide financial security in the form of a Completion Agreement as provided by subparagraph B (1)(c) of paragraph 6, Section II, of the Policy or other security in conformance with paragraph i- -Sertion IL of the Policy. _ i : ,. •- 1 ' D. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy, which under subparagraph A of said paragraph provides that the Developer, at its sole option, may either negotiate or competitively bid the contracts as the City is not participating in the cost of construction. E. The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. F. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted,brought for or on account of any injuries or damages sustained by any persons(including death)or to any property, resulting from or in connection with the construction, design,performance or completion of any work to be performed by said Developer,his contractors,subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors,sub-contractors, officers, agents or employees, whether or not such infitries, death or damq,-es are caused, in whole or in part, by the alleged ne!zliaence of the City of Fort Worth, its of tiers, servants, or employees. G. Developer shall install or adjust all of the required utilities to serve the development or to construct the improvements required herein. H. As the City participation does not exceed $25,000, the City's Director of Public Works and Transportation is authorized to execute this Agreement on behalf of the City,and the Developer may commence construction hereunder without a requirement for City Council approval. I. Developer agrees that no lot shall be occupied under a certificate of occupancy until the improvements required herein have been constructed (Article 104.100, Ordinance 7234). 2 f J. Developer hereby releases and agrees to indemnify and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this contract. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer required to construct current and future improvements provided for in this agreement. L. Developer agrees to construct proposed improvements as shown on the exhibits attached hereto. The following exhibits are made a part hereof: Water (A)None; Sewer (A-1) None; Paving (B)Attached Storm Drain (B-1) Attached; Street Lights and Signs (C) Attached. M. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. II. Street and Storm Drain Facilities A. The Developer(s) agree to install or to cause to have installed, the street, storm drainage, street lighting, street name sign and other community facilities improvements shown as "current improvements" on the attached Exhibits B, B 1, and C. B. As shown below in the "Summary of Cost for Street and Storm Drain Facilities", the Developer shall fund its share of "current improvements" and shall pay to the City for its share of the cost of street, storm drainage, street lighting, street name signs as shown on the attached Exhibits B, B1, and C. The estimated total cost of current improvements and related support services specified in this agreement, including design, construction and inspection is estimated to $1,291,085.78. SUMMARY OF COST Chapel Hill Phase I Item Developer City Cost Total Cost Cost A. Construction $ 1. Streets $732,613.25 732,613.25 2. Storm Drainage $410,450.00 410,450.00 3. Street Lights $101,200.00 101,200.00 4. Street Name Signs $1,100.00 1,100.00 B. Engineering Design $ C. Construction Engineering and Management by DOE $ $ 4% 45,722.53 45,722.53 TOTALS 1,291,085.78 $ - 1,291,085.78 Notes: 1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets. The developer is responsible for installation of sidewalk and a separate financial guarantee is required in the form of a bond or check for the cost of the sidewalk. 2. Developer's column for Item C represents four percent (4%) cost for construction inspection fees and materials testing. The City will pay additional inspection fee over 4%. 3. City not preparing plans and specifications. 4 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixeAY aid evelope n has executed this instrument in triplicate, at Fort Worth,Texas this the of kl� 52005. Approval Recommended: Transportation and Public Works Department Robert Goode, P. E. Director Cit of F orth N4 M&C l(EQUIRED Marc OAar a Assis nt City Manager ATTEST: Marty Hendrix City Secretary Approved as to Fo Assista�n ity'Attorney ATTEST: Corporate Secretary DEVELOPER Chapel Hill Venture, L.L.L.P., a Georgia limited liability limited partnership By: Chapel Hill (Forth Worth) AIP III, L.L.L.P., a Georgia limited liability partnership, as general partner By: Avanti Capital Associates, a Florida joint venture, as general partner By: Avanti Management Partners, J.V., a Florida joint venture, as sole managing venturer By: Avanti Development Corporation, a Florida corporation, as managing venturer by: Marvin M. Shapiro, Vice President ATTEST: — ( ,1, a] C orate Secretary 6 UNIT V: STORM DRAIN ItemApprox. Description of Items with Bid Unit Price Total No. Quantity Prices Written in Words Amount (Furnish and install, including all appurtenant work, complete in place, the following items) (D-No. refers to related items in the Part D Special Conditions:) 1. 623 L.F. 21" Class III Reinforced Concrete Pipe Complete-in-Place; Dollars and Cents $ 30.00 $ 18,690.00 2. 2122 L.F. 24" Class III Reinforced Concrete Pipe Complete-in-Place; Dollars and Cents $ 33.00 $ 70,026.00 3. 84 L.F. 27" Class III Reinforced Concrete Pipe Complete-in-Place; Dollars and Cents $ 37.00 $ 3,108.00 4. 458 L.F. 30" Class III Reinforced Concrete Pipe Complete-in-Place; Dollars and Cents $ 42.00 $ 19,236.00 5. 149 L.F. 36" Class III Reinforced Concrete Pipe Complete-in-Place; Dollars and Cents $ 56.00 $ 8,344.00 B-16 e UNIT V: STORM DRAIN Item Approx. Description of Items with Bid Unit Price Total No. Quanti Prices Written in Words Amount (Furnish and install, including all appurtenant work, complete in place, the following items) (D-No. refers to related items in the Part D Special Conditions:) 6. 147 L.F. 42" Class III Reinforced Concrete Pipe Complete-in-Place; Dollars and Cents $ 72.00 $ 10,584.00 7. 487 L.F. 54" Class III Reinforced Concrete Pipe Complete-in-Place; Dollars and Cents $ 110.00 $ 53,570.00 8. 509 L.F. 60" Class III Reinforced Concrete Pipe Complete-in-Place; Dollars $ 122.00 $ 62,098.00 and Cents 9. 317 L.F. 60" Class IV Reinforced Concrete Pipe Complete-in-Place; Dollars and Cents $ 132.00 $ 41,844.00 10, 22 Each Standard ten(10) Foot Curb Inlet; Dollars and Cents $ 2,300.00 $ 50,600.00 11, 3 Each Standard fifteen (15) Foot Curb Inlet; Dollars $ 3,200.00 $ 9,600.00 and Cents Y-, s B-17 ;. J UNIT V: STORM DRAIN Item Approx. Description of Items with Bid Unit Price Total No. Quantity Prices Written in Words Amount (Furnish and install, including all appurtenant work, complete in place, the following items) (D-No. refers to related items in the Part D Special Conditions:) 12. 1 Each Standard twenty (20) Foot Curb Inlet; Dollars and Cents $ 4,000.00 $ 4,000.00 13. 3 Each Standard Four (4) Foot Square Manhole, All Depth; Dollars and Cents $ 3,200.00 $ 9,600.00 14. 1 Each Standard Five (5) Foot Square Manhole, All Depth; Dollars and Cents $ 4,400.00 $ 4,400.00 15. 3 Each Standard six (6) Foot Square Manhole, All Depth; Dollars and Cents. $ 4,800.00 $ 14,400.00 16. 1 Each Type"B" Headwall for 30" RCP Dollars and Cents $ 1,000.00 $ 1,000.00 B-18 Fes_ UNIT V: STORM DRAIN Item Approx. Description of Items with Bid Unit Price Total j No. Quanti Prices Written in Words Amount (Furnish and install, including all appurtenant work, complete in place, the following j items) (D-No. refers to related items in the Part D Special Conditions:) 17. 1 Each Type `B" Headwall for 60" RCP Dollars and Cents $ 3,200.00 $ 3,200.00 18. 2 Each Sloping headwall for 30" RCP Dollars and Cents $ 1,000.00 $ 2,000.00 19. 2,340 S.F. 12" gabion Mattress Complete; Dollars and Cents $ 5.50 $ 12,870.00 20. 880 S.F. Type "R" Grouted Stone Rip Rap; Dollars and Cents $ 3.50 $ 3,080.00 21. 4,400 L.F. Trench Safety Complete and in-place; Dollars and Cents $ 0.50 $ 2,200.00 22. 30 Each Inlet Protection; Dollars and Cents $ 200.00 $ 6,000.00 UNIT V— STORM DRAIN SEWER SUBTOTAL AMOUNT BASE BID: $ 410,450.00 �. B-19 UNIT VI: PAVING IMPROVEMENTS Item Approx. Description of Items with Bid Unit Price Total No. Quantity Prices Written in Words Amount (Furnish and install, including all appurtenant work, complete in place, the following items) (D-No. refers to related items in the Part D Special Conditions:) 1. 31,633 6" Portland Concrete Cement S.Y. Pavement; Dollars and Cents $ 16.00 $ 506,128.00 2. 5,560 S.Y. 5" Alley Pavement w/ sand cushion Dollars and Cents $ 17.00 $ 94,520.00 3. 34,115 6" Lime Stabilized Subgrade; S.Y. Dollars and Cents $ 1.35 $ 46,055.25 4. 512 TN Lime Material @ 32lbs/ S.Y.; Dollars and Cents $ 65.00 $ 33,280.00 5. 2,930 S.F. 6" HMAC Transition Pavement Dollars and Cents $ 12.00 $ 35,160.00 6. 157 L.F, Concrete Street Header Dollars f and Cents $ 10.00 $ 1,570.00 UNIT VI: PAVING IMPROVEMENTS Item Approx. Description of Items with Bid Unit Price Total No. QuantityPrices Written in Words Amount (Furnish and install, including all appurtenant work, complete in place, the following items) (D-No. refers to related items in the Part D Special Conditions:) 7T4 Each Handicap Ramps; Dollars and Cents $ 600.00 $ 14,400.00 8. Lump Traffic Control Plan; Sum Dollars and Cents $ 1,500.00 $ 1,500.00 UNIT VI—PAVING IMPROVEMENTS AND RETAINING WALLS SUBTOTAL AMOUNT BASE BID: $ 732,613.25 B-21 PART B - PROPOSAL (Cont.) Within ten (10) days after acceptance of this Proposal, the undersigned will execute the formal contract and will deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the faithful performance of the Contract. The attached bid security in the amount of 5% is to become the property of the City of Fort Worth, Texas, in the event the contract and bond or bonds are not executed and delivered within the time above set forth, as liquidated damages for the delay and additional work caused thereby. The undersigned bidder certified that he has been furnished at least one set of the General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, and that he has read and thoroughly understands all the requirements and conditions of those General Documents and the specific Contract Documents and appurtenant plans. The successful bidder shall be required to perform the work in accord with the following publications, both of which are incorporated herein and made a part hereof for all purposes: 1. The General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, which may be purchased from the Water Department. 2. The Standard Specifications for Street and Storm Drain Construction which may be purchased from the Department of Transportation & Public Works. The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors, or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as amended by City Ordinance No. 7400. The Bidder agrees to begin construction within 10 calendar days after issue of the work order, and to complete the contract within 180 working days after beginning construction as set forth in the written work order to be furnished by the Owner. (Complete A or B below, as applicable:) 4� .-:; . B-25 A. The principal place of business of our company is in the State of Nonresident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. Non resident bidders in the State of , our principal place of business, are not required to underbid resident bidders. B. The principal place of business of our company or our parent company or majority owner is in the State of Texas. I (we) acknowledge receipt of the following addenda to the plans and specifications, all of the provisions and requirements of which have been taken into consideration on preparation of the foregoing bid: Addendum No. 1 (Initials) Addendum No. 3 (Initials) Addendum No. 2 (Initials) Addendum No. 4 (Initials) `= Respectfully submitted, Oil .4 L ,.tom . . By -' 7g 4 _ Title µ. Address Telephone: M�� (Seal) Date: I . STREET LIGHT COST ESTIMATE QUANTITY UNIT COST TOTAL COST INTERSECTIONS 9 EA $ 2, 000 $18, 000 . 00 MID-BLOCK RESIDENTIAL 7 EA $ 2, 000 $14, 000. 00 CHANGE OF DIRECTION RESIDENTIAL 4 EA $ 2, 000 $8, 000 . 00 MID-BLOCK COLLECTOR 0 EA $ 2, 000 $0, 000. 00 MID-BLOCK ARTERIAL PARKWAY 0 EA $ 2, 500 $0, 000 . 00 MID-BLOCK ARTERIAL MEDIAN 0 EA $ 2, 500 $0, 000. 00 RELOCATE EXISTING LIGHT 0 EA $ 1, 500 $0, 000 . 00 Subtotal $40, 000. 00 City' s Cost $00, 000 . 00 Developer 's Subtotal $40,000. 00 10% Contingencies $4,000. 00 Project Total $44 ,000. 00 Adjacent Developer's Cost $01000. 00 Developer's Cost $44, 000.00 2% Inspection Fee $0 ,00 .00 CFA CODE #2004061 DEVELOPER' S COST: $44 ,000 . 00 CHAPEL HILL PHASE I-A May 20, 2004 Fort Worth, Texas March 2, 2005 PAGE I OF Exhibit C Id,-- II. STREET LIGHTS WORK DESCRIPTION: 1 . The Developer shall provide for the installation of streetlights at the approximate locations shown in Exhibit "C", immediately after final acceptance of the street construction, in accordance with engineering plans and specifications approved by the Transportation and Public Works Department. 2 . Streetlights on residential and /or collector streets can be installed using overhead or underground conductors with the approval of the Director of Transportation and Public Works. 3 . The City will install all the streetlights that use overhead or underground conductors on residential, and collector streets . the developer agrees to pay the city the amount shown below prior to the City starting it' s design efforts. 4 . Streetlights on arterial streets shall be installed with underground conduit and conductors . 5 . The Developer agrees to dedicate all easements required for the installation and maintenance of the street lights and to provide for the installation of any electrical transformers required for the proper operation of the street lights 6. The estimated cost of this street light installation is detailed on page 1 of exhibit C and is summarized below, the street lights will remain the property of, and will be maintained by the City of Fort Worth. DEVELOPER'S COST: $44 ,000.00 CHAPEL HILL, PHASE I-A May 20, 2004 FORT WORTH, TEXAS CFA CODE 2004061 Page II of Exhibit C III. "STREETLIGHTS" INTERSECTIONS NORTH AMHERST LN & CHATHAM ST 1 SOUTH AMHERST LN & SUSSEK ST 1 SOUTH AMHERST LN & CHATHAM ST 1 NORTH AMHERST LN & DILLON CRESCENT 1 BONDS RANCH RD & CHAPEL HILL LN 1 CHAPEL HILL LN & EAST AMHERST LN 1 CHAPEL HILL LN & SOUTH AMHERST LN 1 CHAPEL HILL LN & SUSSEK ST 1 DILLON CRESCENT & CHATHAM ST 1 MID-BLOCK SOUTH AMHERST LN 1 EAST AMHERST LN 3 CHAPEL HILL LN 1 SUSSEK ST 2 CHANGE OF DIRECTIONS EAST AMHERST LN 2 NORTH AMHERST LN 1 SUSSEK ST 1 CHAPEL HILL, PHASE I Page III of Exhibit C I . STREET LIGHT COST ESTIMATE QUANTITY UNIT COST TOTAL COST INTERSECTIONS 0 EA $ 2, 000 $0, 000 . 00 MID-BLOCK RESIDENTIAL 26 EA $ 2, 000 $52, 000 . 00 CHANGE OF DIRECTION RESIDENTIAL 0 EA $ 2, 000 $0, 000 . 00 MID-BLOCK COLLECTOR 0 EA $ 2, 000 $0, 000.00 MID-BLOCK ARTERIAL PARKWAY 0 EA $ 2, 500 $0, 000 . 00 MID-BLOCK ARTERIAL MEDIAN 0 EA $ 2, 500 $0, 000 . 00 RELOCATE EXISTING LIGHT 0 EA $ 1, 500 $0, 000 . 00 Subtotal $52 ,000 .00 City' s Cost $00 ,000 . 00 Developer' s Subtotal $52,000 .00 10% Contingency $5,200 . 00 Project Total $57 ,200 . 00 Adjacent Developer' s Cost $00 ,000 . 00 Developer' s Cost $57 ,200 . 00 2% Inspection Fee $00,000 . 00 CFA CODE #2004061 DEVELOPER' S COST: $57,200.00 CHAPEL HILL, PHASE I (ADDITIONAL LIGHTING ORNAMENTAL) October 27, 2005 Fort Worth, Texas October 28, 2005 PAGE I OF Exhibit C f J II . STREET LIGHTS WORK DESCRIPTION: 1 . The Developer shall provide for the installation of streetlights at the approximate locations shown in Exhibit "C", immediately after final acceptance of the street construction, in accordance with engineering plans and specifications approved by the Transportation and Public Works Department. 2. Streetlights on residential and /or collector streets can be installed using overhead or underground conductors with the approval of the Director of Transportation and Public Works. 3. The City will install all the streetlights that use overhead or underground conductors on residential, and collector streets. The developer agrees to pay the city the amount shown below prior to the City starting its design efforts. 4 . Streetlights on arterial streets shall be installed with underground conduit and conductors. 5. The Developer agrees to dedicate all easements required for the installation and maintenance of the street lights and to provide for the installation of any electrical transformers required for the proper operation of the street lights 6. The estimated cost of this street light installation is detailed on page 1 of exhibit C and is summarized below, the street lights will remain the property of, and will be maintained by the City of Fort Worth. DEVELOPER' S COST: $57 ,200. 00 CHAPEL HILL, PHASE I (ADDITIONAL LIGHTING ORNAMENTAL) October 27, 2005 FORT WORTH, TEXAS CFA CODE #2004061 Page II of Exhibit C III "STREETLIGHTS" INTERSECTIONS BONDS RANCH RD & COLONIAL HEIGHTS 1 MID BLOCK CALDWELL LN 6 DILLON ST 5 COLONIAL HEIGHTS_ 6 ROCKWELL DR 3 MINT SPRINGS 2 HOPEWELL IN 1 KINSTON ST 2 CHAPEL HILL, PHASE I (ADDITIONAL LIGHTING ORNAMENTAL) Page III of Exhibit C r. Z� IV STREET NAME SIGNS 1 . The City of Fort Worth will install the street name signs upon final approval of the street construction. The street name signs will remain the property of, and will be maintained by, the City of Fort Worth. 2 . The Developer will pay for the street name sign installations required for this development to the extent of $100 . 00 per intersection. This unit cost will be revised annually by the Department of Transportation and Public Works to reflect prevailing costs of materials and labor. 3 . This development creates the following eleven (11) intersections at a cost to the Developer of $1, 100 . 00 : Bonds Ranch Rd & Chapel Hill Lane N Amherst Lane & Dillon Crescent N Amherst Lane & Chapel Hill Lane E Amherst Lane & Chapel Hill Lane E Amherst Lane & S Amherst Lane N Amherst Lane & Chatham St Dillon Crescent & Chatham St S Amherst Lane & Chatham St S Amherst Lane & Chapel Hill Lane S Amherst Lane & Sussex St Sussex St & Chapel Hill Lane Chapel Hill, Phase 1 CFA code: 2004061 Date: May 10, 2004 L'.... zM/vqyei`V"MPC.:Iom1o�ISN 4 , V H d I`7IH 7HdVH0 oa4�41PJV/Vu 3. rr'�l'-�IOZ-WPH i �J__L_��I l dV6 NOLVOO-1 OGE OGb ON 0 0333 NO 31VOS 7m i Ij I i I i I I 1 % i „1 ,--�--• •- -� lh�.��.1�/'/;I:i�/ice„ �,,.��..-. �� ,_��`i�,• �••. -`C.G, i.�„./ice , �—� ��.��-,;� L:;�r-;-; I !-"fir-•'1 !,.:�%�- t . 1 / � J Bcoc^x 16 �•F j'� N / / jl /j j��/ t J^r /f // �K� � Ab1 ST /:\ n 1�(/ / •� n N N N IAV N N N er � m / � �'� �4 C AP .L IL L,�NEI TIrL oCL L_11 1 L.1 , •N / �, --IIS —[- ITI--- I— I —I Ir —T �__F-•r'-�-_J// I N O-4 I LIx N I S li /t/� < % n n T�/f� LLLI� 5 .1.1 - _-L-1-1 " `i '� ��,�I► < ,�� n•", .%/� I < rF•% - .--- --i--i---- --- -1- - --- -- -- - -- -- ---T-...� POFD DC fil/(I < AN HE s"r LA c < e e f'/j/ ' I</ No • � d� 00 1� d h Q /1 N "' L..— . . ,.. — BL CK 4 _ -'"'LEGEND 4—LANE ROADWAY / 110' ROW r 77 41' B—B ROADWAY / 60' ROW 29' B—B ROADWAY / 50' ROW SCALE (IN FEET) PRIVATE EASEMENT 0 100 200 400 D 10' 8-8 ROADWAY / 16' ROW ......••• 4' SIDEWALK — — LIMITS OF PROJECT STREETS "EXHIBIT B" HUITTZOUARS FAm-Zdera Yxi 6gr»ertw/ArcNtechre CHAPEL HILL PHASE 1 A �°�ro(87 � (8T7)335-1025102 I Z 1 1 ° ".gyp L B OCK 18 I � L n I 21' - 1 1[I L+ELLL 10 10' i / , i mo 1 r_I__4 5' L —L °C� s —�_� _1 =��1� N-4t � r r _r T r- r r �r T � r o ry I J � i , � �-"_i-iS�SE�NS�R�ET� �"l�_�_l.�_./'•/ '/ ��-� � � �, I � 21 21"151-1- 1 Irl m m \ n --i... L_l_l_._l_.1__LB�.°C ��1 r I it I -�---I-1--I--�----�-1-1--I--�---r-1---1--I---�•--�-.•1 �.\�,. POND I j I N N � N ill N N N h a P P e O v 0 rrn'1 j p I S11AV E�Elj LLL El`L I �. �o, I 10 — — L..-.. , . - . BL Cl, LEGEND ---------------------------------------------------------------- 24'SD PROP. STORM DRAIN LINE B- MANHOLE SCALE (IN FEET) 10 CURB INLET SIZE HEADWALL 0 100 200 X00 FLOW ARROW LIMITS OF PROJECT STORM DRAIN "EXHIBIT B-1 " Huj]Tz(Y_ s Fktli-Z(AZ.,Inc, ErvV*erkq/Ard-Ae t re CHAPEL HILL PHASE I A SOOW 7th 9t429--1 Fot WorthT 102502 Phorro(Bt7)421}1281 Fax(Bi7)335-1025 /n � /B ---------------------------------------------------------------------------� I 21- I _ - 5 j 15 I - I L _ I ----------_----------------------------------------------------------------------------- LEGEND PROP. STORM DRAIN LINE MANHOLE SCALE (IN FEET) 10' CURB INLET SIZE —� HEADWALL 0 100 200 400 FLOW ARROW — — LIMITS OF PROJECT ------------- STORM DRAIN "EXHIBIT B-1.2" HU11T 2DUARS mm-zoom ba a ck rino l kvhuci r* [CHAPEL HILL PHASE I LLQ �°r„;ySL Sba�,F°^�Tons 76= � l�l 1 1 'z pt- 1c: Qk 16 �CT(�AtIlSTE � 1 c �J L a oci<1-1 -1 s L 1 �- �- -� 1.1-3 11 It L1 /l \ nr �' �/ \••\ \/•. / f n " N N f�V N .I N I N N N N I. .I m - �' 1 //�•' � ,'7 \\/V// J--�-1__�1_�1CItA�L iL�(.r�NE(-1--L__� 1 __� 1 r— I of Q N N r� C N N T-- - --r---FT-[—[--r--T-T-1 IL N, N " I "'I¢"E�" " " " " I " " " '�I � n I I III J _ISUSC 1. 1 \ / I 142 L T J—J -1.7T-J—J--I--T--F", �.n /' PO4D I � � riOi � ;n uni N N �i < a a a r a e - � \ n �- �•' I S1ANJE STJ LA�E1e L J i �' ' LLL + .L-- -- -- -- -- -- -- -- -- -- -- -- -- -- -- --� ,, .-� L.. —.. �.. .. _ BL CK 4 ------------------------------------------------------------------- LEGEND + SINGLE STREET LIGHT SCALE (IN FEET) T STOP SIGN 100 200 ?IOC SINGLE STREET LIGHT WITH ATTACHED STOP SIGN — — LIMITS OF PROJECT STREET LIGHTS "EXHIBIT C" HUIT -XXIARS ' HLM-Zc4—,Inc. E_rXpnee�inq/Ar&At -tre [CHAPEL HILL PHASE I A � >�)4�� ax(8T7Tem.om-)0265'102