HomeMy WebLinkAboutContract 33015 CITY SECRETARY
CONTRACT Np, _3,3_l.5-- r
COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.
WHEREAS, One SR, L.P. , hereinafter called "Developer", desires to make
certain improvements to _Sendera Ranch Phase III Section 2A , an addition to the City of
Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
That said Developer, acting herein by and through_Centamtar Terras, L.L.C., its
duly authorized _General Partner , and the City, acting herein by and through Marc Ott,
its duly authorized Assistant City Manager, for and in consideration of the covenants and
conditions contained herein, do hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated
March 2001, approved by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Contract as if copy
herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of this
Community Facilities Agreement and the Policy shall be resolved in favor
of this Agreement.
C. Developer shall provide financial security in conformance with paragraph
6, Section II, of the Policy.
D. The Developer shall award all contracts for the construction of community
facilities in accordance with Section 11, paragraph 7 of the Policy.
E. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section 11, of the Policy.
0IFFIC-,1A WORD
CITE flb"A MY
CFA REVISED FORMAT WITH 4% 1 FT. 10RTHI TEXT
F. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers,
agents and employees from all suits, actions or claims of any character,
whether real or asserted, brought for or on account of any injuries or
damages sustained by any persons (including death) or to any property,
resulting from or in connection with the construction, design, performance
or completion of any work to be performed by said Developer, his
contractors, subcontractors, officers, agents or employees, or in
consequence of any failure to properly safeguard the work, or on account
of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub-contractors, officers, agents or
employees, whether or not such injuries, death or damages are caused,
in whole or in part, by the alleged negligence of the City of Fort Worth,
its officers, servants, or employees.
G. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
H. In the event that City participation exceeds $25,000, Developer agrees that
no street construction or storm drainage will begin prior to City Council
approval of this Community Facilities Agreement. (Article 104.100,
Ordinance 7234).
1. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been constructed
(Article 104.100, Ordinance 7234).
J. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications and
cost estimates supplied by the Developer for this contract.
K. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to construct
current and future improvements provided for in this agreement.
L. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part hereof-
U,f
ereof:U,fi;:� ivili
CFA REVISED FORMAT WITH 4% 2 kv� � "
Water (A) None; Sewer (A-1) None; Paving (B) attached; Storm Drain (13-
1) attached; Street Lights and Signs (C) attached.
Il. Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibits B, B1, and C.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibits B, Bl,
and C. The estimated total cost of current improvements and related
support services specified in this agreement, including design,
construction and inspection is estimated to $1,200,121.81
Item Developer City Cost Total Cost
Cost
A. Construction $ -
$
1. Streets $668,215.10 668,215.10
2. Storm Drainage $427,575.10 427,575.10
3. Street Lights $59,400.00 59,400.00
4. Street Name Signs $1,100.00 1,100.00
B. Engineering Design $
C. Construction Engineering
and Management by DOE $ $
(4%) 43,831.61 43,831.61
$ $
TOTALS 1,200,121.81 $---7- - 1,200,121.81
Notes_
1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets.
Sidewalk cost is included under street cost. The developer is responsible for
installation of sidewalk.
2. Developer's column for Item C represents four percent (4%) cost for construction
inspection fees and materials testing. The City will pay additional inspection fee over
4%.
3. City not preparing plans and specifications.
l _1r � �
CFA REVISED FORMAT WITH 4/o.doc 3
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager,
attested by its City Secretary, with the corporate seal of the City affixed, and said Developer
has executed this instrument in triplicate, at Fort Worth, Texas this the P-P ay of Deceftber
20V5
Approval Recommended:
Transportation and Public Works
NO M&C REQUIRED Department
Robert Goode, P. E.
Director
ATTEST: Ci F Wort
B :
Marc Ott
City Secretary Assistant City Manager
Approved a.� to Form:
Assistan `Attorney
ATTEST: DEVELOPER
One SR L.P.
a Texas Limited Partnership
Centamtar Terras, L.L.C.
A Texas Limited Liability
General Partner
By:
7 �
Corporate Secretary Mehr ad Moayedi
Mnnnaer
RECEIVED
�'+" ��c; �
�;? �;`': JUN 1 5 20
1 : 4
CFA REVISED FORMAT WITH 4% 4 ��
PROPOSAL
(This Proposal must not be removed from this book of Contract Documents)
TO: ONE SR, L.P. FORT WORTH, TEXAS
DEVELOPER FEBRUARY 2004
c/o CARTER & BURGESS, INC.
FOR: STREET IMPROVEMENTS FOR
Sendera Ranch, PHASE III, SECTION 2A
D.O.E. NO. 4387
FILE NO. W-1432
Pursuant to the foregoing "Notice to Bidders," the undersigned bidder having thoroughly
examined the Contract Documents, Plans, Special Provisions, Standard Special Provisions, the
site of the project, and understanding the amount of work to be done, and the prevailing
conditions hereby proposes to do all the work as provided in the Plans and Contract Documents
subject to inspection and approval by the Director of Public Works of the City of Fort Worth,
Texas, and binds himself upon acceptance of this Proposal to execute a contract and furnish an
approved Performance Bond and Payment Bond, and such other bonds as may be required by
the Contract Documents, for the performing and completing of the said work. Contractor
proposes to do the work within the time stated and for the following sums:
DESCRIPTION OF ITEMS
SPEC PAY APPROXIMATE WITH BID PRICES WRITTEN IN UNIT AMOUNT
ITEM ITEM QUANTITY WORDS PRICE BID
STREET IMPROVEMENTS
210 1. 24,842 S.Y. 6" Lime Stabilized Subgrade
(Includes Preparation of Subgrade),
complete in place for the sum of
One Dollar&
Fifty-Five Cents per Square Yard $ 1.55 $ 38,505.10
N_\JOB\011979\Spec\011979.010b.doc P-1 2 f.
OFF]�,ji;,t
ti:J 1 Y L II
DESCRIPTION OF ITEMS
SPEC PAY APPROXIMATE WITH BID PRICES WRITTEN IN UNIT AMOUNT
ITEM ITEM QUANTITY WORDS PRICE BID
210 2. 7,399 S.Y. 6" Lime Stabilized Subgrade
(Includes Preparation of Subgrade)
(Sendera Blvd.), complete in place
for the sum of
One Dollar &
Fifty-Five Cents per Square Yard $ 1.55 $ 11,468.45
212 3. 373 TON Lime for Subgrade (30#/S.Y.)'
complete in place for the sum of
Seventy Dollars &
No Cents per Ton $ 70.00 $ 26,110.00
212 4. 111 TON Lime for Subgrade (30#/S.Y.)'
(Sendera Blvd.), complete in place
for the sum of
Seventy Dollars &
No Cents per Ton $ 70.00 $ 7,770.00
314 5. 24,121 S.Y. 6" Reinforced Concrete Pavement
(Includes Joint Sealer and 7" STD
Attached Concrete Curb), complete
in place for the sum of
Sixteen Dollars &
Thirty-Five Cents per Square Yard $ 16.35 $ 394,378.35
NAJOB\01 1979\Spec\01 1979.010b.doc P-2 y,
'CIf
`$:• �'IIII 777 `
DESCRIPTION OF ITEMS
SPEC PAY APPROXIMATE WITH BID PRICES WRITTEN IN UNIT AMOUNT
ITEM ITEM QUANTITY WORDS PRICE BID
6. 7,186 S.Y. 8" Reinforced Concrete Pavement
(Includes Joint Sealer and 7" STD
Attached Concrete Curb) (Sendera
Blvd.), complete in place for the
sum of
Twenty Dollars &
Twenty Cents per Square Yard $ 20.20 $ 145,157.20
7. 553 S.Y. 4' Sidewalks Along Open Space,
complete in place for the sum of
Twenty-Seven Dollars &
No Cents per Square Yard $ 27.00 $ 14,931.00
8. 775 S.Y. 4' Sidewalks Along Sendera Ranch,
(Sendera Blvd.) complete in place
for the sum of
Twenty-Seven Dollars &
No Cents per Square Yard $ 27.00 $ 20,925.00
9. 4 EA. Sidewalk Ramps (Sendera Blvd.), in
place for the sum of
Seven Hundred Dollars &
No Cents per Each $ 700.00 $ 2,800.00
N:\JOB\011979\Spec\011979.010b.doc P-3 :�I
\:rrr�.
DESCRIPTION OF ITEMS
SPEC PAY APPROXIMATE WITH BID PRICES WRITTEN IN UNIT AMOUNT
ITEM ITEM QUANTITY WORDS PRICE BID
10. 3 EA. End of Road Barricade, in place for
the sum of
Seven Hundred Fifty-Five Dollars &
No Cents per Each $ 755.00 $ 2,265.00
11. 1 EA. End of Road Barricade, in place for
the sum of(Sendera Blvd.)
Two Thousand
One Hundred Fifty Dollars &
No Cents per Each $ 2,150.00 $ 2;150.00
12. 1 L.S. Pavement Markings (Sendera
Blvd.)
Seven Hundred Fifty-Five Dollars &
No Cents per Lump Sum $ 755.00 $ 755.00
13. 1 L.S. Storm Water Management
Five Hundred Dollars &
No Cents per Lump Sum $ 500.00 $ 500.00
14. 1 L.S. Storm Water Management
(Sendera Blvd.)
Five Hundred Dollars &
No Cents per Lump SUm $ 500.00 $ 500.00
TOTAL STREET IMPROVEMENTS --- $ 668,215.10
N AJOB\011979\Spec\01 1979.010 b.doc P-4
LA t�U';d,";C`
City of Fort Worth requires a minimum of 30#/S.Y. The Paving Contractor will be responsible for a lime
series test as directed by the City of Fort Worth Construction Inspection Department.
Owner shall be responsible for installation of all silt barriers, sediment traps, check dams, and seeding.
The Earthwork contractor shall be responsible for the "Construction Entrance/Exit" installation.
N:\.JOB\011979\Spec\011979.010b.doc P-5 ,� 2
?If .. "rlfj �yti
This contract is issued by an organization which qualifies for exemption pursuant to the provisions of Article
20.04(F) of the Texas Limited Sales, Excise and Use Tax Act.
Taxes: All equipment and materials not consumed by or incorporated into the project construction, are subject
to State sales taxes under House Bill 11, enacted Augu$t 15, 1991.
The Contractor shall comply with City Ordinance 7278, as amended by City Ordinance 7400 (Fort Worth City
Code Sections 13-A-21 through 13-A-29), prohibiting discrimination in, employment practices,
The undersigned agrees to complete all work covered by these Contract Documents within 30 working days
from and after the date for commencing work, as set forth in the written Work Order to be issued by the Owner,
and to pay not less than the "Prevailing Wage Rates for Streets, Drainage and Utility Construction," as
established by the City of Fort Worth, Texas.
Within ten (10) days of receipt of notice of acceptance of this bid, the undersigned will execute the formal
contract, and will deliver an approved Surety Bond for the faithful performance of this contract. The attached
deposit check in the amount of five percent (5%) Bid Bond) is to become the property of the Developer, or the
attached Bidder's Bond is to be forfeited in the event the contract and bond are not executed within the time
set forth as liquidated damages for delay and additional work caused thereby.
Respectfully submitted,
Site Concrete, Inc.
By:
Jean S. Boney
Title: President
Address: 3340 Roy Orr Boulevard
Grand Prairie, TX 75050-4207
(S E A L) If Bidder is Corporation
Date
Receipt is acknowledged of the following addenda:
Addendum No. 1
Addendum No. 2
Addendum No. 3
N:\JOB\011979\Spec\011979.010b.doc P-6
WV14 G 2"
This contract is issued by an organization which qualifies for exemption pursuant to the provisions of Article
20.04(F)of the Texas Limited Sales, Excise and Use Tax Act.
Taxes: All equipment and materials not consumed by or incorporated into the project construction, are subject
to State sales taxes under House Bill 11, enacted August 15, 1991.
The Contractor shall comply with City Ordinance 7278, as amended by City Ordinance 7400 (Fort Worth City
Code Sections 13-A-21 through 13-A-29), prohibiting discrimination in, employment practices.
IThe undersigned agrees to complete all work covered by these Contract Documents within 30 working days
from and after the date for commencing work, as set forth in the written Work Order to be issued by the Owner,
and to pay not less than the "Prevailing Wage Rates for Streets, Drainage and Utility Construction," as
established by the City of Fort Worth, Texas.
1 Within ten (10) days of receipt of notice of acceptance of this bid, the undersigned will execute the formal
contract, and will deliver an approved Surety Bond for the faithful performance of this contract. The attached
deposit check in the amount of five percent (5%) Bid Bond is to become the property of the Developer, or the
attached Bidder's Bond is to be forfeited in the event the contract and bond are not executed within the time
set forth as liquidated damages far delay and additional work caused thereby.
Respectfully submitted,
r Site Concr Inc.
J By:
Jean S. Boney
Title: President
Address: 3340 Roy Orr Boulevard
Grand Prairie, TX 75050-4207
1 .
(S E A L) If Bidder is Corporation
fDate
Receipt is acknowledged of the following addenda:
Addendum No. 1
Addendum No. 2
Addendum No. 3
f
LIT
p N:\JOB\011979\Spec\011979.010b.doc P-6 '37 `�T.,'✓, �U �'
l
DESCRIPTION OF ITEMS
SPEC PAY APPROXIMATE WITH BID PRICES WRITTEN IN UNIT AMOUNT
ITEM ITEM QUANTITY WORDS PRICE BID
SECTION C - STORM DRAIN SYSTEM
440 1. 367 L.F. 60" Class III R.C. Pipe, Including
Trench Excavation and Backfill,
Complete in place for the sum of
One Hundred Forty-Two Dollars &
No Cents per Linear Foot $ 142.00 $ 52,114.00
440 2. 346 L.F. 42" Class III R.C. Pipe, Including
Trench Excavation and Backfill,
Complete in place for the sum of
Eighty-One Dollars &
No Cents per Linear Foot $ 81.00 $ 28,026.00
440 3. 75 L.F. 42" Class III R.C. Pipe, Including
Trench Excavation and Backfill,
(Sendera Blvd.), Complete in place
for the sum of
Eighty Dollars &
No Cents per Linear Foot $ 80.00 $ 6,000.00
440 4. 250 L.F. 36" Class III R.C. Pipe, Including
Trench Excavation and Backfill,
Complete in place for the sum of
Fifty-Nine Dollars &
No Cents per Linear Foot $ 59.00 $ 14,750.00
;c,'��'� �fir:;� �•
N:\JOB\011979\Spec\011979.010a.doc P-10
DESCRIPTION OF ITEMS
SPEC PAY APPROXIMATE WITH BID PRICES WRITTEN IN UNIT AMOUNT
ITEM ITEM QUANTITY WORDS PRICE BID
440 5. 458 L.F. 33" Class III R.C. Pipe, Including
Trench Excavation and Backfill,
Complete in place for the sum of
Fifty Dollars &
No Cents per Linear Foot $ 50.00 $ 22,900.00
440 6. 35 L.F. 27" Class III R.C. Pipe, Including
Trench Excavation and Backfill,
Complete in place for the sum of
Thirty-Eight Dollars &
No Cents per Linear Foot $ 38.00 $ 1,330.00
440 7. 256 L.F. 24" Class III R.C. Pipe, Including
Trench Excavation and Backfill,
Complete in place for the sum of
Thirty-Four Dollars &
No Cents per Linear Foot $ 34.00 $ 8,704.00
440 8. 68 L.F. 24" Class III R.C. Pipe, Including
Trench Excavation and Backfill,
(Sendera Blvd.) Complete in place
for the sum of
Thirty-Five Dollars &
Forty Cents per Linear Foot $ 35.40 $ 2,407.20
f�
N:\JOB\011979\Spec\011979.010a.doc P-11101
DESCRIPTION OF ITEMS
SPEC PAY APPROXIMATE WITH BID PRICES WRITTEN IN UNIT AMOUNT
ITEM ITEM QUANTITY WORDS PRICE BID
9. 247 C.Y. 6 - 9' x 5' Multiple Box Culvert,
(Sendera Blvd.), Complete in place
for the sum of
Three Hundred-Thirty Dollars &
No Cents per Cubic Yard $ 330.00 $ 81,510.00
10. 237 C.Y. 4 - 9'x 5' Multiple Box Culvert,
(Sendera Blvd.), Complete in place
for the sum of
Three Hundred-Thirty Dollars &
No Cents per Cubic Yard $ 330.00 $ 78,210.00
11. 1,712 L.F. Trench Safety (Storm Drain),
Complete in place for the sum of
No Dollars &
Ten Cents per Linear Foot $ 0.10 $ 171.20
12. 307 L.F. Trench Safety (Storm Drain),
(Sendera Blvd.) Complete in place
for the sum of
No Dollars &
Ten Cents per Linear Foot $ 0.10 $ 30.70
444 13. 2 Ea. 15' Standard Curb Inlet, complete in
place for the sum of
Two Thousand
Eight Hundred Twenty-Five Dollars
No Cents per Each $ 2,825.00 $ 5,650.00
N:AJOB\011979\Spec\011979.010a.doc P-12 :�', ;:'_•�.=._�, �;�; �:'..�.'
DESCRIPTION OF ITEMS
SPEC PAY APPROXIMATE WITH BID PRICES WRITTEN IN UNIT AMOUNT
ITEM ITEM QUANTITY WORDS PRICE BID
444 14. 5 Ea. 10' Standard Curb Inlet, complete in
place for the sum of
Two Thousand
Two Hundred Seventy-Five Dollars &
No Cents per Each $ 2,275.00 $ 11,375.00
444 15. 2 Ea. 10' Standard Curb Inlet (Sendera
Blvd.), complete in place for the sum
of
Two Thousand
Two Hundred Fifty Dollars &
No Cents per Each $ 2,250.00 $ 4,500.00
444 16. 1 Ea. 4' Square Drop Inlet, complete in
place for the sum of
One Thousand
Eight Hundred Twenty-Five Dollars &
No Cents per Each $ 1,825.00 $ 1,825.00
444 17. 3 Ea. Standard 4' Square Manhole,
complete in place for the sum of
Two Thousand
Seven Hundred Dollars &
No Cents per Each $ 2,700.00 $ 8,100.00
444 18. 1 Ea. Standard 6' Square Manhole,
complete in place for the sum of
Three Thousand
Five Hundred Dollars &
No Cents per Each $ 3,500.00 $ 3,500.00
!
V'
NAJOB\01 1979\Spec\01 1979.010a.doc P-13
DESCRIPTION OF ITEMS
SPEC PAY APPROXIMATE WITH BID PRICES WRITTEN IN UNIT AMOUNT
ITEM ITEM QUANTITY WORDS PRICE BID
410 19. 1 Ea. 24" Type B Headwall (includes
Grade to Drain Excavation),
Complete in place for the sum of
Nine Hundred Fifty Dollars &
No Cents per Each $ 950.00 $ 950.00
410 20. 1 Ea. 60" Type B Headwall (includes
Grade to Drain Excavation),
Complete in place for the sum of
Two Thousand
Eight Hundred Dollars &
No Cents per Each $ 2,800.00 $ 2,800.00
21. 45 S.Y. 12-18" Rock Rip Rap
Forty-Two Dollars &
Fifty Cents per Square Yard $ 42.50 $ 1,912.50
22. 11 S.Y. 6-12" Rock Rip Rap
Thirty-Three Dollars &
Fifty Cents per Square Yard $ 33.50 $ 368.50
23. 33 C.Y. 4-Flared Wingwalls (FW-S) (Senders
Blvd.)
Three Hundred Forty-Five Dollars &
No Cents per Cubic Yard $ 345.00 $ 11,385.00
NAJOB\01 1979\Spec\01 1979.010a.doc P-14
i
� Tull ''
DESCRIPTION OF ITEMS
SPEC PAY APPROXIMATE WITH BID PRICES WRITTEN IN UNIT AMOUNT
ITEM ITEM QUANTITY WORDS PRICE BID
24. 46 C.Y. Parallel Headwall Concrete (Sendera
Blvd.)
Two Hundred Forty-Five Dollars &
No Cents per Cubic Yard $ 245.00 $ 11,270.00
25. 1 L.S. Remove 42" Headwall (Sendera
Blvd.)
Two Hundred Dollars &
No Cents per Lump Sum $ 200.00 $ 200.00
26. 1 L.S. Pedestrian Handrail for Wingwall
(Sendera Blvd.)
Sixteen Thousand
Two Hundred Dollars &
No Cents per Lump Sum $ 16,200.00 $ 16,200.00
27. 854 S.Y. Grouted Riprap (18"-24" Dia.)
(Sendera Blvd.)
Fifty-Nine Dollars &
No Cents per Square Yard $ 59.00 $ 50,386.00
28. 1 L.S. Storm Water Management
Five Hundred Dollars &
No Cents per Sump Sum $ 500.00 $ 500.00
NAJ08\01 1979\Spec\011979.010a.doc P-15 �u,l �-
DESCRIPTION OF ITEMS
SPEC PAY APPROXIMATE WITH BID PRICES WRITTEN IN UNIT AMOUNT
ITEM ITEM QUANTITY WORDS PRICE BID
29. 1 L.S. Storm Water Management (Senders
Blvd.)
Five Hundred Dollars &
No Cents per Lump Sum $ 500.00 $ 500.00
SECTION C - - - STORM DRAIN SYSTEM $427,575.10
Section A-Water........................................................................................ $389,156.65
Section B - Sanitary Sewer........................................................................ $202,799.50
Section C - Storm Drain............................................................................. $427,575.10
TOTAL $1,019,531.25
NAJOB\01 1979\Spec\01 1979.010a.doc P-16
?q .., a ,��
PART B - PROPOSAL (cont.)
Within ten (10) days after acceptance of this Proposal, the undersigned will execute the formal
contract and will deliver an approved Surety Bond and such other bonds as required by the
Contract Documents, for the faithful performance of the Contract. The attached bid security in
the amount of 5% is to become the property of One SR, L.P., in the event the contract and
bond or bonds are not executed and delivered within the time above set forth, as liquidated
damages for delay and additional work caused thereby.
The undersigned bidder certifies that he has been furnished at least one set of the General
Contract Documents and General Specifications for Water Department Projects dated January
1, 1978, and that he has read and thoroughly understands all the requirements and conditions
of those General Documents and these specific Contract Documents and appurtenant plans.
The undersigned assures that its employees and applicants for employment and those of any
labor organization, subcontractors or employment agency in either furnishing or referring
employee applicants to.the undersigned are not discriminated against as prohibited by the terms
of City Ordinance No. 7278 as amended by City Ordinance No. 7400.
The Bidder agrees to begin construction within 10 calendar days after issue of the work
order by the Owner, and to complete the contract within 24 working days after beginning
construction as set forth in the written work order to be furnished by the Owner.
(Complete A or B below, as applicable:)
[ ] A. The principal place of business of our company is in the State of
[] Nonresident bidders in the State of , our principal place of
business are required to be —percent lower,than resident bidders by state
law. A copy of the statute is attached.
[ ] Nonresident bidders in the State of , our principal place of
business, are not required to underbid resident bidders.
[ ] B. The principal place of business of our company or our parent company or
majority owner is in the State of Texas.
NAJ08\011979\Spec\011979.010a.doc P- 17 �Q` �� ► '1u�4�
Receipt is acknowledged of the following addenda:
Addendum No. 1
Addendum No. 2
Addendum No. 3
Respectfully submitted,
Fou Constr on
( SEAL )
BY:
Json J. D iels
If Bidder is Corporation.
TITLE: V. Operations
ADDRESS: 11200 Old Seagoville Rd.
Balch Springs, TX 75180
NAJOB\011979\S ec\011979.010a.doc P- 18 N e'�h'I
I. STREET LIGHT COST ESTIMATE
QUANTITY UNIT COST TOTAL COST
INTERSECTIONS 10 EA $ 2, 000 $20, 000 .00
MID-BLOCK RESIDENTIAL 12 EA $ 2 , 000 $24, 000 .00
CHANGE OF DIRECTION RESIDENTIAL 5 EA $ 2, 000 $10, 000 .00
MID-BLOCK COLLECTOR 0 EA $ 2 , 000 $0 , 000 .00
MID-BLOCK ARTERIAL PARKWAY 0 EA $ 2, 500 $0 , 000 .00
MID-BLOCK ARTERIAL MEDIAN 0 EA $ 2 , 500 $0, 000 .00
RELOCATE EXISTING LIGHT 0 EA $ 1, 500 $0, 000 .00
Subtotal $54, 000.00
City' s Cost $00 , 000 .00
Developer' s Subtotal $54, 000.00
10% Contingencies $5,400.00
Project Total $59, 400.00
Adjacent Developer's Cost $0, 000.00
Developer's Cost $59,400.00
2% Inspection Fee $0, 00.00
(CFA CODE 2004094)
DEVELOPER'S COST: $59, 400. 00
SENDERA RANCH, PHASE III - SECTION II A
July 13, 2004
Fort Worth, Texas
January 3, 2005
PAGE I OF Exhibit C RECEIVED
Wfl,::1AA
JAN, 0 5 2005
II. STREET LIGHTS WORK DESCRIPTION:
1 . The Developer shall provide for the installation of streetlights at
the approximate locations shown in Exhibit "C" , immediately after
final acceptance of the street construction, in accordance with
engineering plans and specifications approved by the Transportation
and Public Works Department .
2 . Streetlights on residential and /or collector streets can be
installed using overhead or underground conductors with the approval
of the Director of Transportation and Public Works.
3 . The City will install all the streetlights that use overhead or
underground conductors on residential, and collector streets . the
developer agrees to pay the city the amount shown below prior to the
City starting it' s design efforts.
4 . Streetlights on arterial streets shall be installed with underground
conduit and conductors.
S . The Developer agrees to dedicate all easements required for the
installation and maintenance of the street lights and to provide for
the installation of any electrical transformers required for the
proper operation of the street lights
6. The estimated cost of this street light installation is detailed on
page 1 of exhibit C and is summarized below, the street lights will
remain the property of, and will be maintained by the City of Fort
Worth.
DEVELOPER'S COST: $59,400.00
SENDERA RANCH, PHASE III - SECTION II A
July 13, 2004
FORT WORTH, TEXAS
(CFA CODE 2004094)
Page II of Exhibit C
U IS
,
�- Td�
e ..ter: �+"I
III.
"STREETLIGHTS"
INTERSECTIONS
SENDERA RANCH BLVD & COWBELL RIDGE DR 1
COWBELL RIDGE DR & ROPING REINS WAY 1
COWBELL RIDGE DR & BARREL RUN 1
COWBELL RIDGE DR & ROPERS WAY 1
SNAFFLE BIT TRAIL & ROUND PEN• RUN 1
SNAFFLE BIT TRAIL & HOEDOWN WAY 1
SNAFFLE BIT TRAIL & TACK TRAIL 1
ROPING REINS WAY & HOEDOWN WAY 1
HOEDOWN WAY & BARREL RUN 1
ROUND PEN RUN & TACK TRAIL 1
MID - BLOCK
SENDERA RANCH BLVD 4
SNAFFLE BIT TRAIL 2
ROUND PEN RUN 1
ROPING REINS WAY 2
COWBELL RIDGE DR 1
BARREL RUN 2
CHANGE OF DIRECTIONS
ROUND PEN RUN 2
BARREL RUN 2
ROPERS WAY 1
SENDERA RANCH, PHASE III - SECTION II A
tv
Page III of Exhibit CE Lit DO
. usv�
IV
STREET NAME SIGNS
1. The City of Fort Worth will install the street name signs upon final
approval of the street construction. The street name signs will remain
the property of, and will be maintained by, the City of Fort Worth.
2. The Developer will pay for the street name sign installations required
for this development to the extent of $100.00 per intersection. This
unit cost will be revised annually by the Department of Transportation
and Public Works to reflect prevailing costs of materials and labor.
3. This development creates the following eleven (11) intersections at a
cost to the Developer of $1,100.00:
Sendera Ranch Blvd & Snaffle Bit Tr
Round.Pen Run & Snaffle Bit Tr
Hoedown Way & Snaffle Bit Tr
Tack Tr & Snaffle Bit Tr
Tack Tr & Round Pen Run
Sendera Ranch Blvd & Cowbell Ridge Dr
Barrel Run & Cowbell Ridge Dr
Ropers Way & Cowbell Ridge Dr
Roping Reins Way & Cowbell Ridge Dr
Barrel Run & Hoedown Way
Roping Reins Way & Hoedown Way
Sendera Ranch, Phase 3, Section 2A
CFA code: 2004094 July 23, 2004
RECEIVED
�y.JY L �.�C+� C1
N :fi.r �,y', Wig 5 2005
N o 0
O
O
W
o
U a+ a
Z
W O
` 0
C, s
Z
F� v
w Z9 W
aIx
�o
V
W
Q
U
O
F^
O
� z
T R
¢ MSEHI
� MSFHI
9S� W,r N
IV OV4831
a
9 J rY
pp 5
a 35f10H '08 3NIl KiNnoo 13 SVH N
z oa a
OOH c 9ST ru Frl z
z $
U
O
o
J U
SN18dS
o W
C
oa Nolsb $' a
531bg 3
0
a
0
U
as
!n
U
N
T
O
0
0
� � r
C,
u N c O
Z x z o L,
UW
o a
LZ
Z r
W W N
W C� 0
o
z
C/7 W ` W z a w
NIS
QQ O
t
i
...L �x
k:
W r
a,
W
[O J W /
O Q 7
O O 3= O a
mCC mcr U W
mO m0 Q� 0
/ to CD In LL. o
1 NYQ\- v'� v O o
�G1 - Q Q m
$ 3:: W U-
11:0
-11:0 00 C u
oa oa z O 2
�O O w
d Ir C N\ I J
o
C>
C�
Z
of
co
X Z61
0 Un
U-i UJ
Ca�cl
00
7 -1 t
10,
to
u CV
Ln
KhLOCr[O
z z r. $L
A 1 11
z
91 ir
t: Tt T:
It N
12
.looe
dal I
.100' II
LLI
LLJ
C6.\
LLJ
CD z
wF-
<
Lki
LLI —i
< cr-
LLI CD C
F-
ik
I
0 0 0
Er = = M
CL CL a- a- UJ —J
o
V) Lu
u
<
onM
<
co
LU
Lu X
LU �P
V
nOm
cn cn
7
-7. -7 T
OH
>1
`
10000, c
0
4-
0
a,
F-7
Lal LL) z >
LIJ LL) z 0 0
LLJ F-- kn LLJ P-
o V) V)LLJ V)
-j
UJ LL) ui 0 F ui
-j CL LL) LAJ CL
LJ
D-i 0: F- Li 0
Z
0 LLJ Ln C)
MW In
F- V)
V)
z
CL* a_ V)
C oz C) —
[if �0 Of X
CL CL— a_ LLJ -i