HomeMy WebLinkAboutContract 30023 Halbach-Dietz CITY SECRETARY Architects CONTRACT NO . Architecture Space Planning Interior Design 4388 West Vickery Blvd., Suite 200 Fort Worth, Texas 76107 (817) 737-0725 (817) 737-6261 FAX Fax Transmittal, To: Bill Matysek From: Joe Halbach Attn: 392-8488 Date: 4.30.4 Job: 04012 Re: Bolt Street Comprehensive As-Builts Project Scope The above project consists of CAD drawings, based on owner-provided technical information, that will graphically and accurately show the following: 1. Grounding locations 2. Roof equipment grounding locations including roof top units, antenna, lightning protection and any other grounded equipment 3. Fire tech room power and circuit locations 4. Panel locations 5. Underfloor junction box locations serving console units 6. Main tech room rack locations 7. UPS lighting locations 8. Updated panel schedules 9. Cable tray locations 10. Console locations with correct numbering 11 . All items included on Attachment A - "Bolt PSAP Building Drawing Updates, Project Scope Clarifications" date 4.28.4 I. Architectural Services 1. Meet with City of Fort Worth and IT to determine project scope (already completed). 2 Provide project coordination and assistance to City of Fort Worth and IT. 3. Provide coordination and management of the consultant work. 4. Provide " cad clean up" to floor plan, reflected ceiling plan and roof plan in order to make a "base drawing" from which all other architectural and MEP drawings will be produced. Halbach• Dietz Architects Bolt Street As-Built Drawings P ge 1 Project No.04012 City Of Fort Worth - 5.. From the base floor plan, draw all cable tray locations. 6. From base reflected ceiling plan, draw ceiling cable tray locations. III. Electrical Services The following drawings will be produced using owner provided information: 1 . A cad drawing indicating routing and ground bus bar locations for raised floor and console grounding. 2. A cad drawing indicating routing and terminations of main, tower and earth grounding. The owner will provide Wells Doak this information via hand drawings. Wells Doak will produce a cad drawing with the information provided by the owner incorporated. 3. A cad drawing indicating roof equipment and lightning protection grounding. 4. A cad drawing indicating the fire tech room power with circuit numbers indicated. We will provide two separate plans on this drawing of the tech area. One plan will indicate the existing type of devices used, and the other plan will indicate the circuit numbers of those devices. 5. A drawing indicating all existing panel locations and designations 6. A drawing indicating under-floor junction box locations and conduit routing in the call center area. 7. A drawing indicating existing main tech room rack locations and circuiting at racks. 8. A drawing indicating locations of light fixtures in the facility connected to emergency power source(s). 9. A drawing or drawings of panel schedules with equipment being served indicated. Exclusions 1. General Additional services - services performed by Halbach•Dietz Architects and its consultants and that involve changes in the "Project Scope" listed above. 2. Specific Additional Services a. Field verification 3. Reimbursable Expenses including printing, plotting and courier expenses. 4. Field Verification Estimated Fee I. Architectural $3,000.00 II. Electrical $6,000.00 Total Estimated Fee $9,000.00 i Halbach• Dietz Architects Bolt Street As-Built Drawingsl Page 2 Project No.04012 City Of Fort Worth We will bill you monthly on an hourly basis using the following hourly rates: Halbach-Dietz Architects Joe Halbach $90.00 Jeff VanCuren $80.00 Amy Sorley $70.00 Wells Doak Engineers Inc. Ron Walters $85.00 We appreciate the opportunity to work with you on this project and look forward to beginning work upon your approval. Sincerely, Halbach-Dietz Architects Joe H Ibach, AIA fl-TIJA'122L> - Signed Halbach• Dietz Architects Bolt Street As-Built Drawings Page 3 Project No.04012 City Of Fort Worth CFW TPW ARCH SER PAGE 02/02 BOLT PSAP BUILDING Drawing Updates Project Scope Clarifications 1. Grounding System layouts/diagrams (main,earth,console, raised floor,roof top and tower grounds). 2. Updated roof top drawings to include all equipment grounding, lightning protection,roof penetrations and new antenna installation information. 3. Updated Fire Technology Room drawings containing Tack locations,power panels and outlet placement. 4. Updated Police Technology Room drawings containing rack locations, power panels and outlet placement. 5. Building drawing to include all electrical panel locations and their designations, 6. Updated electrical schedules to include existing and,new panels with circuit designation information. 7. PD and FD dispatch floor grid drawing to include under floor junction box locations and layouts, and console placement with associated numbers. 8. Individual:drawings of cable trays (RF,V&D, SBC 911, Expansion),runs and locations under floor, above ceiling and above racks.(7 drawings) 9. Combined drawing of all trays 10. UPS Lighting locations �4 11. Provide(2) electronicxas well as. alo4 with the right to reproduce fo al use. IN TESTIMONY THEREOF, the City of Fort Worth has caused this instrument to be signed in triplicate in its name and on its behalf, by its City Manager and attested by its City Secretary, with the Corporate Seal affixed; and the Architect has also properly executed this instrument in triplicate copies, each of which is deemed an original. EXECFDCITY OF FORT WORTH,TEXAS,THIS ' day of ,A.D., By: APPROVED: amename Office(President or Vice-President) �y: Assistant City Manager APPROVAL RECOMMENDED: RECORDED: By: � By: Transportation and Public Works City cretary APPROVED AS TO FORM LEGALITY: By: t' Date: /� Assistant Ci ttorney Contract Authorization nate