HomeMy WebLinkAboutContract 42671-A1 CITY SECRETARY CONTRACT NO. U AMENDMENT No.1 TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and HDR Engineering, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 42671, (the CONTRACT) which was authorized by M&C C-25,312 on the 6th day of December, 2011 in the amount of $ 320, 556; and WHEREAS, the CONTRACT involves engineering services for the following project : Tony' s Creek Open Channel Study - Study No: ' kS"'0374, &ner-'-k WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated September 18, 2014, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $43, 663. 00. 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $364, 219. 00. 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX RECEIV ED SEP 2 9 2014 Page -1- APPROVED: City of Fort Worth HDR Engineering Inc. Fernando Costa ca A. Bathurst, P.E. Assistant City Manager Vice President DATE: 9/,Z `/+ DATE: APPROVA RECOMMENDED: d5► Doug W. Wiers ,Ph.D. , P.E. Director, Transportation and Public Works Department APPROVED AS TO FORM AND LEGALITY: M&C: Date: Drnr 49RNT O R Assistant City Attorney ATTEST: Fps o°pO°000°o 10 0 OX Mary J. K Yis er o 8 y City Secretary o°°,°°°00 S OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page -2- F)l September 18, 2014 Mary Hanna,P.E. Professional Engineer Storm Water Management Transportation and Public Works Dept. 1000 Throckmorton Street City of Fort Worth, Texas 76102 RE: Updated Proposal—Amendment#1 Tony's Creek(Stream MC-1)Open Channel Study City Study No. SWS-037 City Secretary Contract Number 42671 Dear Ms. Hanna: Based on our recent scope and fee negotiations,enclosed please find for your review our updated contract documents pertaining to Amendment#1 for the Tony's Creek Open Channel Study, SWS-037. The results of the Hydraulics analysis revealed significant flooding potential in the storm drain systems in the Northwest Diamond Hills (Fostepco Heights) and 32nd Street to the west of Long Avenue which merits including these systems in the Tony's Creek ICM model. The purpose of this amendment is to enhance the Open Channel Study by including the storm drain from as-built plans for these two areas, and add the current feasibility tasks to the existing analysis of alternatives. Identification of additional storm drain alternatives in these areas will reduce overland flooding and roadway overtopping. As such, the requested amendment includes the following tasks: • Task 2f - for the CCTV condition assessment and 2g for the Level D SUE • Tasks 3g to 3k - to include the two storm drain systems modeling in the Tony's Creek ICM model • Tasks 5.b.1 to 5.b.7- for additional analysis of alternatives and mitigation strategies • Additions to Tasks 1 and 6 for project management and QA/QC. Schedule HDR estimates that it will take an additional 3 months to perform the services outlined above. The remainder of the project schedule will remain the same. Deliverables Deliverables will remain the same as outlined in the contract. hdrinc.com 600 W. 61'Street,Suite 100,Fort Worth,TX 76102-4002 T 817-333-2800 F 817-333-2818 Fee Estimate HDR is proposing to complete the additional services outlined above for a lump sum fee of$43,663.00. Invoices will be sent monthly and will be based on a percent complete of the lump sum fee. HDR's fees for the aforementioned services are shown in the Exhibit B-2 attachment and are itemized below: • CCTV condition assessment and Level D SUE $ 10,000.00 • ICM modeling of 2 storm drain lines $ 14,301.00 • Analysis of alternatives and mitigation strategies $ 9,771.00 • Project management and QA/QC. 9,591.00 Total Services $43,663.00 Professional Services $ 32,160.00 Sub-contracted Services $ 10,000.00 Expenses $ 1,503.00 Amendment Request No. 1: $43,663.00 With DFW Infrastructure providing the required CCTV and The Rios Group providing the SUE services,our proposal consists of 22.90% M/WBE participation, above the project goal of 20%. Should you have any questions please do not hesitate to contact Mr.Rodrigo Vizcaino,P.E. at 972-960-4466. Sincerely, L s Bathurst,P.E. Vice President/Managing Principal Enclosure cc: Exhibit B-2(w/enclosure) !� ' m '■§EE §a ■!2 ■§■■■$" E_A»!b#ei ■2■r5 "( _ ! . ... . �.. ._ ... .,.`,�. \ `, I , «■ §!m ■�;;,4 ■7,R�R2R ■_@,^ J$!»»!! I ! e; ■!� lr;;Ga ■!;!R@a# ■���, dc 22!$! ■|]� ■ - - 27 ' § `§!■■ §§ |■* ■i§§■■ FORM MI■! . B ! - ... - -®- -®-® ---- -- - ® - k w t 2 �§ ��R ■, ° z 0 A 1° � s 3_ . §k� @\ . �,,,�� ■�� _ ,� )7 3 2"22f�;. o I u ■ �_ J2 2 |)\§88888 Z . . 7 ■■ » . \ . � \jl:: 16 ;\\�)\})�}:5;® .! &\f :.`!; \k:\2r\ 22222&;{{)§-! ■a! !�\\j} !)!!)!§, !3}! � \2)) m;w mw /) s; |!! {/� 22/ /�2