WHEREAS, the City of Fort Worth (City) and Ned K. Burleson &
Associates, Inc. , (Engineer) made and entered into City Secretary
Contract No. 27585, (the Contract) which was authorized by the City
Council by M&C C-19801 on the 19th day of March 2002, and
subsequently revised by four previous amendments; and
WHEREAS, the Contract involves engineering services for the
following project:
Water and Sanitary Sewer Replacement Contract 2001 WSM-N
WHEREAS, it has become necessary to execute Amendment No. 5 to
said Contract to include an increased scope of work and revised
maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and through
their duly authorized representatives, enter into the following
agreement which amends the Contract:
1 .
Article I of the Contract is amended to include the additional
engineering services specified in a proposal letter dated February
220, 2005, a copy of which is attached hereto and incorporated
herein. The cost to City for the additional design services to be
performed by Engineer total $14,290. 68.
2.
Article II of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work and
services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall not
exceed the sum of $158,687 .88.
0910 RM
Ciff 11CM
FE M,fix
ORIGINAL
3.
All other provisions of the Contract which are not expressly amended
herein shall remain in full force and effect.
EXECUTED on this theday of I ` 1a1q
2005, in Fort Worth, Tarrant County, Texas.
ATTEST:
Contract authorization
Marty Hendri
City Secretary D9tF
APPROVAL RECOMMENDED: - %PPROVED: f )I
A. Douglas Rademaker, P.E . MarA. tt
Director, Department of Ass Cant City Manager
Engineering
NED K. BURLESON & ASSOCIATES, INC.
ENGINEER
By:
Name: Ned K. Burleson, P.E . , President
2565 E . Loon 820 N. Bldg. 12
Fort Worth, TX 76118
APPR D AS TO FORM AND LEGALITY:
a-ry to nberger
Assistant City Attorney
-2- CITY ��� Y
NED K. BURLESON & ASSOCIATES, INC.
Consulting Engineers
February 22, 2005
Liam Conlon
Department of Engineering
City of Fort Worth
1000 Throckmorton St.
Fort Worth, Texas 76102-6311
Reference: Amendment No. 5,Water and Sanitary Sewer Improvements
Contract 2001 WSM-N (Water and Sewer Improvements) D.O.E. No. 3599
Dear Mr. Conlon:
In response to your request, Ned K. Burleson and Associates is pleased to present this fifth Amendment
for additional services. The amendment shall include the following additional services:
• Storm Water Pollution Prevention Plan
• Additional design Fee for Original Service Re-Routes. Design of original extents of this project(re-
routes on 4th and 5th Streets)were completed before the City required that individual re-routes be
designed and shown on plan and profile sheets. Design fee for these re-routes is based off the
T.S.P.E. Curve A for the Current Estimated Cost(5.8%)x 85% x Estimated Cost for 4th& % 5 th Street
Private Sewer Re-Routes ($86,450.00)= $4262.00.
• Review, Adjustment, and Incorporation of Lopez Garcia and F.P. Greenhaw plan and profile sheets.
Fee is based on work hours from NKB personnel.
• Reimbursement for reproduction pertaining to the extension of the original project, and the additional
plan sheets from Lopez Garcia and F. P. Greenhaw.
A Summary of the proposed budget for this amendment is as follows:
Storm Water Pollution Prevention Plan $ 4,000.00
Additional Design Fee for Original Service Re-Routes $ 4,262.00
Review, adjustment, and Incorporation of Lopez Garcia and
F.P. Greenhaw plan and profile sheets $ 1,860.00
Additional Reproductions
Original sets 15 Sheets at 45 copies
Actual Sets 47 Sheets at 45 copies $ 2,880.00
Direct Printing Expenses—6 sets & 1 set Mylars
From Feb. 18, 2005 $ 1,288.68
TOTAL PROPOSED AMENDMENT No. 5 $ 14,290.68
(Water Cost= $ 3,077.74; Sewer Cost = $ 11,212.94)
0101%?Ull WORD
Fy. WORTH, TEX.
2565 E Loop 820 N • Fort Worth, Texas 76118 • 817-590-8800
PROJECT FEE DETAILS
Original Contract $67,505.57
Amendment No.1 $24,792.61
Amendment No.2 $24,620.63
Amendment No.3 $18,529.06
Amendment No.4 $ 8,949.33
Amendment No. 5 $14.290.68
TOTAL PROJECT $158,687.88
Water/Sewer Cost for entire project
(Water Cost = $66,604.77; Sewer Cost= $92,083.11)
If you have any questions or require additional information, please give me a call.
Sincerely,
Wade Goodman
Project Manager