HomeMy WebLinkAboutContract 32224 AMENDMENT NO. 2 STATE OF TEXAS S CITY SECRETARY CONTRACT NO. ✓ d o�`� (No M&C Needed) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and Parsons Water and Infrastructure, Inc. (Engineer) made and entered into City Secretary Contract No. 31257, (the Contract) which was authorized by the City Council by M&C C-20470 on the 4th day of January, 2005; and subsequently revised by one previous amendment; WHEREAS, the Contract involves engineering services for the following project: Water and Sanitary Sewer Main Replacements on Throckmorton Street and 14th Street WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated August 5, 2005, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $10, 132 . 98 . 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $94 , 657 . 96. ORIGINAL 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the day of 6 2005, in Fort Worth, Tarrant County, Texas. ATTEST: �\-\t�) �A�b"&L��L7 Marty Hendrix City SecretaryNO M&C REQU[RED APPROVAL RECOMMENDED: RO A. Douglas Rademaker, P.E. Marc tt Director, Department of Assi tant City Manager Engineering PARSONS WATER AND INFRASTRUCTURE, INC. ENGINEER By: % 4 Name: Marvin Williams Vice President 4500 Mercantile Plaza Dr. , STE 235 Fort Worth, TX 76137 APPROVED AS w FORM AND LEGALITY: Assistan Cit tt,orney ar.,�� ❑r �,at PARSONS 4500 Mercantile Plaza Drive,Ste 228•Fort Worth,TX 76137.(817)759-4820•Fax(817)834-2165•www.parsons.com August 5, 2005 Mr. Rakesh Chaubey, P.E. Engineering Services City of Fort Worth 1000 Throckmorton Street Fort Worth, Texas 76102-6311 Re: Request for Amendment No. 2 Water and Sanitary Sewer Replacement -Throckmorton St. and 14`h St. Project No. 00136 Dear Mr. Chaubey: The original scope of work for this project included topographic and subsurface utility surveys along Throckmorton St. from 14`h St. to 11`h St., along 11`h St. from Throckmorton St. to Houston St., and along 14`h St. from Throckmorton St. to Houston St. Parsons submitted a Conceptual Design Report to the City of Fort Worth on April 8, 2005. This report included five alternate alignments for relocation of the gravity sanitary sewer. Three of the alternatives were eliminated during the Conceptual Design review meeting on May 6, 2005. Alternative 4 provided for a portion of the line to be routed along the new 12`h St. from Throckmorton St. to Houston St. and north along Houston St. to tie into an existing manhole at the intersection of 11`h St. and Houston St. Parsons did not provide survey information for this alignment because construction in the new 12`h St. and Houston St. was not in the original scope of work. Parsons was asked to do additional due diligence work to locate other subsurface utilities along this alignment. Parsons completed the additional due diligence work and submitted a revised Conceptual Design Report on June 7, 2005 which showed the subsurface utilities based on the best information available from the utility companies. Parsons strongly recommends that a topographic and subsurface utility survey be completed along the new 12`h St. from Throckmorton St. to Houston St., along 13`h St. from Throckmorton St. to Houston St., and along Houston St. from 11`h St. to 13`h St. to make certain that all of the subsurface utilities have been correctly located in the project area so that there are no delays during the construction phase of the project because of unknown utility interferences. The cost for the additional topographic and subsurface utility survey is $10,132.98 which includes a 10% mark-up allowed by our contract. A breakdown of the costs is attached. Therefore, we request an amendment in this amount to cover the costs _ of the additional survey work. Original Contract Amount $ 81,319.98 Amendment No. 1 $ 3,205.00 Amendment No. 2 $ 10,132.98 Total Contract Amount $ 94,657.96 Please do not hesitate to contact me via e-mail at jack.thibodeaualDarsons.com or on my cell phone at (972) 898-3462 if you have any questions or need additional information. Sincerely, J ._ Thibodeau, P.E. Senior Project Manager Attachment Amendment No. 2 Cost Estimate Project No. 00136 SUE PM $ 123.78 3 $371.34 PE $ 110.74 8 $885.92 SUE Mgr $ 83.62 24 $2,006.88 SUE Tech $ 44.72 48 $2,146.56 CADD $ 67.76 12 $813.12 Tech Support $ 41.33 6 $247.98 $6,471.80 Vac Truck $ 80.00 0 $ - Des Truck $ 15.00 48 $ 720.00 $ 720.00 $ 7,191.80 Surveying RPLS 75 2 $150.00 Survey Tech 65 4 $260.00 3-Man Crew 115 14 $1,610.00 $2,020.00 Subtotal $ 9,211.80 10% Mark-Up $ 921.18 TOTAL SUE & Survey $10,132.98 r