HomeMy WebLinkAboutContract 46024 CITY SECWAW
C014TRACT NO.
Developer and Project Information Cover Sheet:
Developer Company Name: Centergy, West 7`�L.P.
♦rM
Address, State,Zip Code: 8235 Douglas Ave., Suite 900 1 Dallas,TX 75225
Phone,E-Mail: (214)368-7200,wmiller @centergyretail.com
Authorized Signatory/Title: West Miller,Director
Project Name and Brief Description: 54"Water Main Relocation to serve Left Bank
Project Location: Harrold Street between West 7`h and Dakota Street
Plat Case No.: N/A Plat Name: N/A
Council District: 3 City Project No: 02212 J
CFA: 2014-045 DOE: 7171
To be completed by staf.
Received by: Date:
fh7
c^7
�7
c7
4
Ca
i�
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX
i
COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.
WHEREAS, the undersigned Developer ("Developer") desires to make certain
specific improvements as described below and on the exhibits attached hereto
("Improvements") related to a project generally described as Left Bank 54" Water Main
Relocation'("Project") within the City of Fort Worth, Texas("City"); and
WHEREAS, the City has no obligation to participate in the cost of the
Improvements or Project; and
WHEREAS, any future City participation in this CFA is subject to the availability
of City funds and approval by the Fort Worth City Council and shall be memorialized as an
amendment to this Agreement; and '
WHEREAS, the Developer and the City desire to enter into this Community
Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements and the
Project.
NOW,THEREFORE, For and in consideration of the covenants and
conditions contained herein,the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March
2001, approved by the City Council of the City of Fort Worth, as amended, is
hereby incorporated into this Agreement as if copied herein verbatim.
Developer agrees to comply with all provisions of said Policy in the
performance of its duties and obligations hereunder and to cause all
contractors hired by Developer to comply with the Policy in connection with
the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6,
Section II, of the Policy and recognizes that there shall be no reduction in the
collateral until the Project has been completed and the City has officially
accepted the Improvements. Developer acknowledges that the said
acceptance process requires the Developer's contractor(s) to submit an
2
affidavit of bills paid signed by its contractor and consent of surety signed
by its surety to ensure the contractor has paid any sub-contractors and
suppliers in full. Additionally, the contractor must also provide in writing
that the contractor has been paid in full by Developer for all the services
provided under their contract.
C. Developer agrees to cause the construction of the Improvements contemplated
by this Agreement and that said construction shall be completed in a good and
workmanlike manner and in accordance with all City standards and the City-
approved construction plans, specifications and cost estimates provided for the
Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof. Water (AL Y. ,,
Sewer (A-1) N/A_, Paving (B) NlA ,, Storm Drain (B-1) N/A , Street
Lights & Signs(C) N/A .
E. The Developer shall award all contracts for the construction of the
Improvements in accordance with Section II, paragraph 7 of the Policy and the
contracts shall be administered in conformance with paragraph 8, Section II, of
the Policy.
F. For all Improvements included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed,
said contractor to meet City's requirements for being prequalified, insured,
licensed and bonded to do work in public streets and/or to perform
water/waste water construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance
bond in the names of the City and the Developer for one hundred percent
(100%) of the contract price of the Improvements, and a maintenance bond
in the name of the City for one hundred percent(100%)of the contract price
of the Improvements valid for a period of two (2) years from the date of
final acceptance insuring the maintenance and repair of the constructed
infrastructure during the term of the maintenance bond. All bonds to be
furnished before work is commenced and to meet the requirements of
3
Chapter 2253, Texas Government Code.
ill. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer-awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required by
said documents and same will be evidenced on the Certificate of Insurance
(ACORD or other state-approved form) supplied by the contractor's
insurance provider and bound in the construction contract book.
iv. To require its contractor to give at least 48 hours' advance notice of intent
to commence construction to the City's Construction Services Division so
that City inspection personnel will be available; to require the contractor to
allow the construction to be subject to inspection at any and all times by
City inspection forces, to not install or relocate any sanitary sewer, storm
drain, or water pipe unless a responsible City inspector is present and gives
his consent to proceed, and to make such laboratory tests of materials being
used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City in order to schedule a Pre-Construction Meeting. The
submittal should occur no less than 10 working days prior to the desired
date of the meeting. No construction will commence without a City-issued
Notice to Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and
service lines have been completed to the satisfaction of the Water
Department.
G. Developer shall provide, at its expense, all engineering drawings and
documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to
serve the development or to construct the Improvements contemplated herein.
I. City shall not be responsible for any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the
a
community facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the
City harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement.
L. The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to any
property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed by said
Developer, his contractors, subcontractors, officers, agents or employees,
or in consequence of any failure to properly safeguard the work, or on
account of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub-contractors, officers, agents or
employees, whether or not such injuries, death or damages are caused, in
whole or in part, by the alle-ed neglizence of the City of Fort Worth, its
officers, servants, or employees.
M. Developer will further require its contractors to indemnify, defend and
hold harmless the City, its officers, agents and employees from and against
any and all claims, suits or causes of action of any nature whatsoever,
whether real or asserted, brought for or on account of any injuries or
damages to persons or property, including death, resulting from, or in any
way connected with, the construction of the infrastructure contemplated
herein, whether or not such injuries, death or damages are caused, in
whole or in part, by the allezed neglikence of the City of Fort Worth, its
officers, servants, or employees. Further, Developer will require its
contractors to indemnify, and hold harmless the City for any losses,
5
damages, costs or expenses suffered by the City or caused as a result of said
contractor's failure to complete the work and construct the improvements
in a good and workmanlike manner,free from defects, in conformance with
the Policy, and in accordance with all plans and specifications.
N. Upon completion of all work associated with the construction of the
Improvements, Developer will assign to the City a non-exclusive right to
enforce the contracts entered into by the Developer with its contractor along
with an assignment of all warranties given by the contractor, whether express or
implied. Further, Developer agrees that all contracts with any contractor shall
include provisions granting to the City the right to enforce such contracts as an
express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the developer's share of the total construction cost as stated in
the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years,
provided, however, if construction of the Improvements has started within
the two year period, the developer may request that the CFA be extended
for one additional year.
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee, its
agreement with its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements
if at the end of two (2) years from the date of this Agreement (and any
extension period) the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the
completion of the construction of the Improvements or to cause the payment
of costs for construction of same before the expiration of two (2) years if
the Developer breaches this Agreement, becomes insolvent or fails to pay
costs of construction and the financial guarantee is not a Completion
Agreement. If the financial guarantee is a Completion Agreement and the
Developer's contractors and/or suppliers are not paid for the costs of
supplies and/or construction, the contractors and/or suppliers may put a lien
upon the property which is the subject of the Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
7
Cost Summary Sheet
Project Name: Left Bank 54" Water Main Relocation
CFA No.: 2014-045 DOE No.: 7171
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any
additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information..
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 1,318,430.00
2.Sewer Construction
Water and Sewer Construction Total $ 1,318,430.00
B. TPW Construction
1,Street
2.Storm Drain $ _
3.Street Lights Installed by Developer
TPW Construction Cost Total $ -
Total Construction Cost(excluding the fees): $ 1,318,430.00
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 26,368.60
D. Water/Sewer Material Testing Fee(2%) $ 26,368.60
Sub-Total for Water Construction Fees $ 52,737.20
E. TPW Inspection Fee(4%) $ -
F TPW Material Testing(2%) $
G. Street Light Inspsection Cost $
H. Street Signs Installation Cost $
Sub-Total for TPW Construction Fees $ -
Total Construction Fees: $ 52,737.20
Choice
Financial Guarantee Options,choose one Amount (ck one
Bond=100°x6 $ 1,318,430.00
Completion Agreement=100%/Holds Plat $ 1,318,430.00
Cash Escrow Water/Santa Sewer=125°x6 $ 1,648,037.50
Cash Escrow Paving/Storm Drain=125% $
Letter of Credit=125%w/2 r expiration period $ 1,648 037.50
R
IN TESTIMONY WHEREOF,the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager,attested by its City
Secretary, with the corporate seal of the City affixed,and s ' D eloper has exec t is
instrument i druplicate,at Fort Worth,Texas this day of (f�
20n .
CITY OF FORT WORTH-Recommended by:
Water Department Transportation&Public Works Department
N/A
Wendy Ch' abulal, EMBA,P.E. Douglas W. Wiersig, P.E.
Development Engineering Manager Director
Approved as to Form &Legality: Approved by City Manager's Office
Douglas W. BTaJ7 Fernando Costa
Assistant City Attorney Assistant City Manager
M&C No. 4 k
Date:
ATTEST:
S
�g .0X
ar L y p °
City Secre � �S°
�
ATTEST: DEVELOPER:
Centergy West 7`h,LP
By: Centergy West 7`h GP,LLC
its ge ral partner
Signature Signature
(Print)Name: Are ik) X4AA4",1 Print Name:We-r.f' (ll eve-
7V,t AAr17`Ez Q"MAJ Title: Pr i i d '`
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH,TX
9
Check items associated with the project being undertaken; checked items must be included
as Attachments to this Agreement
Included Attachment
xM Vicinity Map
x0 Exhibit A: Water Improvements
xI Water Estimate
Exhibit A-1: Sewer Improvements
Sewer Estimate
Exhibit B: Paving Improvements
Paving Estimate
Exhibit B-1: Storm Drain Improvements
Storm Drain Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Estimate
(Remainder of Page Intentionally Left Blank)
R
DoE o 35W
199 R0?-
z
121
h rBO�o u' AIRPORT FWY
51
WHITE SEMEMERT R 2 P11I
J WHITE SfTREMER RO E V�
PROJECT HARRO
LOCATION ST
W 77H S I,y ST 87
E$1 5 g W L NCA TER AVE 30
�p BOYS F
it z
O 3 h PENN YLVANIA VE E HA 777E ST 4j..
ti � ly
2 Q
3599
30
W ROSEOALE ST
ti
y Q
x �c� _
2 in
Not to Scale
BURY LEFT BANK-54"WATER MAIN
RELOCATION
5310 Harwd Hill Road,Suds 100 DAKOTA STREET TO FIFTH STREET VICINITY' MAP
Dallas,T-75230 CENTERGY RETAIL,LLC
TsL(672)991.0011 Fax(672)901-0278 8235 Douglas Avenue,Suite 900
TBPE s F-1048 T3PL6 s F-10107502 Dallas,Texas 75225
Copyright 0 2014 Contact-West Miller,214.368.7200(Ofo),214.616.3060(Mbl)
DATE:March 27,2014 SCALE:AS SHOWN DRAWN BY:JRN FILE:VICINITY MAP.DWG PROJECT No.0104157-30004
F1P10115rOMO 3 AM ld-Fat MbM1FMOWEZXWOVFAM-27-14)XVIO WWPAq QOM byy,Yn w Wr 27.113:14M
41,
0
U
EXISTING 4'
(IF II
L
WATER MAIN
TO REMAIN
p
0 100 200 300 400
EXISTING 54"
1"=200' 1 WATER MAIN
TO B E REMOVED
z
LAJ
0
Fi
uj
LLJ
Z
X
ii
/Y
iA
L
ST ET_
PROPOSED 54"
WATER MAIN
RELOCATION I X
j
Z,
A i
_0
11iT
X,
EXISTING 54"
WATER MAIN
TO REMAIN 1;*
(it
L
Y
j
I,: T- ... / X —�- —= k Tl�:,d�!j ��-
- _WEST 6TH STREET
LEFT BANK-54"WATER MAIN
BURY RELOCATION EXHIBIT A:
5310 Haweat HUI Road,Suft 100 DAKOTA STREET TO FIFTH STREET
Coft.Tax..75M CENTERGY RETAIL,LLC 54" WATER MAIN
T.I.(:12)991-0011 Fax(972)991-0278 8235 DOU&3 Avenue,Suite 900
TBPE 0 F-1019 T8PL8 0 F-10107502 Dallas,Texas 75225 RELOCATION
Copyright 0 2014 Contact-West Miller,214.368.7200(Ofc),214.6163060(Mbl)
DATE:March 27,2014 1 SCALE:AS SHOWN I DRAWN BY:JRN FILE:54"WATER MAIN OVERALL.DWG PROJECT No.0104157-30004
00 42 43
DAP-BID PROPOSAL
Page 1 of 1
SECTION 00 42 43
Developer Awarded Projects-Proposal Form
LEFT BANK-54"WATER MAIN RELOCATION
Specification Estimated
Pay Item Section No. Quantity Name of Pay Item with Unit Price in Words Unit Price Amount Bid
3311.1161-54"Polyurethane Coated Steel AWWA
C200 Water Pipe(Pressure Class 200;IncludingliYA
Installed in Trench with Crushed Rock
1 331114 1900 LF Embedment;Tunnel Liner Plate or Steel Casing) $ 399.68 $ 759,392.00
Three Hundred Ninety-Nine Dollars and
Sixty-Eight Cents Per Unit
3311.0011-54"Polyurethane Coated Steel Pipe
Fittings
2 33 11 14 1 LS
Eighty-Eight Thousand Eight Dollars and $ 88,008.00 $ 88,008.00
NO Cents Per Unit
3304.0002-Cathodic Protection System for Steel
Pipe
3 330412 1 LS Tweenty-Six Thousand Four Hundred Ninety-Five $ 26,495.00 $ 26,495.00
Dollars and
NO Cents Per Unit
3305.1207-72"Casing/Tunnel Liner Plate By Other
4 33 05 21,33 05 48 LF Than Open Cut $ 4,250.00 $ 204,000.00
22 Four Thousand Two Hudred Fifty Dollars and
NO Cents Per Unit
3312.0113-Connection to Existing 54"Water Main
5 33 12 25 2 EA Tweenty-Three Thousand One Hundred Thirteen $ 23,113.00 $ 46,226.00
Dollars and
NO Cents Per Unit
3305.0203-Imported Backfill-CLSM
6 33 05 10 225 CY Eighteen Dollars and $ 18.50 $ 4,162.50
Fifty Cents Per Unit
3339.1101 5'Manhole for 54"Waterline Access
33 39 10,33 39 (including extra depth)
7 20 1 EA Sixteen Thousand Dollars and $ 16,000.00 $ 16,000.00
NO Cents Per Unit
3312.1005-6"Combination Air Valve Assembly for
Water
8 33 12 30 4 EA Tweenty-One Thousand Six Hundred Fifty-Two $ 21,652.00 $ 86,608.00
Dollars and
NO Cents Per Unit
3312.6003 8"Blow Off Valve&Vault
9 33 12 60 2 EA Fourteen Thousand Five Hundred Dollars and $ 14,500.00 $ 29,000.00
NO Cents Per Unit
3201.0400-Temporary Asphalt Paving Repair
30 320108 385 LF Tweenty Dollars and $ 20.00 $ 7,700.00
NO Cents Per Unit
3305.0109-Trench Safety
11 33 05 10 1852 LF One Dollars and $ 1.36 $ 2,518.72
Thirty-Six Cents Per Unit
3292.0400-Seeding,Hydromulch
12 _9Z— 6679 SY One Dollars and $ 1.42 $ 9,484.18
Forty-Two Cents Per Unit
3125.0101-SWPPP>1acre
13 31 25 00 1 LS Thirty-Five Thousand Four Hundred Tweenty-Eight $ 35,428.00 $ 35,428.00
Dollars and
NO Cents Per Unit
3471.0001-Traffic Control
14 34 71 13 8 MO Four Hundred Tweenty-Five Dollars and $ 425.00 $ 3,400.00
NO Cents Per Unit
$ 1,318,422.40
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS LEFT BANK-54"WATER MAIN RELOCATION
Form Version 6/12/2014 CITY PROJECT NO.02212