HomeMy WebLinkAboutIR 7296 INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 7296 a yon Fokr� To the Mayor and Members of the City Council June 2 8 , 1988 *rExA`�s Subject: PETITION ON ALLEGED PROPERTY DAMAGE ON PECOS AND EASTOVER STREETS On April 26, 1988, Robert A. Carter appeared at the Fort North City Council meeting with a petition on the alleged damage to lawns and sprinkler systems by .Lone Star Gas as a result of construction of a new gas main on Pecos and Eastover Streets. The petition was referred to the Public utilities Supervisor for review and resolution. The area of Pecos and Eastover Streets encompasses about one-half mile. The area was inspected by the utilities Supervisor and the Lone Star Gas General Superintendent on April 280 1988 and it was found that all yards and parkway lawn areas have now been restored/repaired to the original or better condition. It appears that Lone Star Gas has taken reasonable measures to restore this area; it has hauled in and filled the pipeline trench with brown sandy loam and has raked and smoothed the new soil level with the existing terrain. The owners and occupants will be responsible for reseeding; some of the residents have already done this. In Mr. Carter' s appearance before the City Council , he presented the petition and a letter; the letter is dated October 28, 1987 , and the three-page petition is dated October 23, 1987. There also is one typed page with 11 OOL names and addresses labelled "third list - April , 1988." In response to questions of the City staff as to the period(s) of time involved in both phases, Lone Star Gas Company has provided the following information: A) The gas main reconstruction involved the replacement of 2. 127 feet of older polyethylene pipe (Poly I) of 1-114" , 2" and 3" sizes with an improved "Poly II", 3" gas main. B) At the end of the construction period, Lone Star Gas received about nine calls from residents, requesting further work be done which included restoring fences , sprinkler head repairs, bird baths , and other minor items. These complaints have been resolved . The initial dirt restoration was done to avoid the possibility of people walking into the excavated trenches, and all customers/residents were advised that, after the initial fill , more "good" earth would be brought in to finish the project. The hauling in, smoothing, leveling of the new fill dirt was completed early in April , 1988, about two weeks prior to the utilities Supervisor's field inspection on April 28, 1988. The new gas main replacement project was performed by a contracting firm, Bayport Pipeline Company, between July 28, 1987, and September 29, 1987 , and was inspected periodically by both the Lone Star Gas Company and the City of Fort Worth Public Works inspectors. The fill dirt restoration project was done by the same firm and was completed on or about April 14, 1988, about two weeks prior to Mr. Carter's appearance before the City Council . [ISSUED BY THE CiTY MANAGER I FORT WORTH, TEXAS INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 7296 o . 2 To the Mayor and Members of the City Council June 28 , 1988 PETITION ON ALLEGED PROPERTY DAMAGE ON PECOS AND Subject: EASTOVER STREETS If additional information is desired, it will be furnished upon request. 1ouglas Harman ty Manager DH:kc 001L [ISSUED BY THE CITY MANAGER FORT WORTH, TEXAS