Loading...
HomeMy WebLinkAboutContract 45001-A1 r AMENDMENT No. 1 CITY SECRETAW TO CITY SECRETARY CONTRACT No. 4 5 0 C0NT GT M0. N-20)-1,/1 - WHEREAS, the City of Fort Worth (CITY) and National Switchgear Systems North Texas, dba National Field Services, (ENGINEER) made and entered into City Secretary Contract No. 45001, (the CONTRACT) which was authorized by M&C C-26477 on the 24 day of September, 2013 in the amount of $ 261, 510. 00; and WHEREAS, the CONTRACT involves engineering services for the following project : Village Creek Water Reclamation Facilities (VC WRF) Power Systems Arc Flash Analysis; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated September 09, 2014, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $45,041. 00. (See Attached Funding Breakdown Sheet, Page -3-) 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $306,551. 00. 3 . rn m All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. rn ---- �=, EXECUTED and EFFECTIVE as of the date last writ&M L004IRtory, `-� below. G(, vv 9j[ C; APPROVED: City of Fort Worth ENGINEER National Switchgear Systems North Texas,Inc./dba National Field Services ernan C sta Ati Suarez Assistant City Manager Account Manager IF I Al DATE: ` (� DATE: AP �V OMMEND Andrew T CronbergI P Interim Director, Water Department APPROVED AS TO FORM AND LEGALITY: M&C: Date: Douglas W. Black Assistant City Attorney ATTEST: 0000 Mary a ° Mary r °° °o�y City Se tary °°°° my()w`cov rK City of Fort Worth;Professional Services Agreement Amendment;PMO Release 8/1/2012 Page 2 of 3 performance by designs' NATOLI TM FIELD SERVICES www.natifield.com 651 Franklin Street tyler.debey(a)natlfield.com Lewisville,Texas 75057 (469)312-1228 Fax(972)420-0938 Farida, Per our conversation today I am requesting the additional funds to the amount of$45,041.00 be added to our contract for the hours we incurred to collect information and add it to the SKM model for additional electrical equipment not shown on the one-line. I have reduced the price from our Senior Engineering rate of$186/hour to our Junior Engineering rate of$146/hour. In the attached Professional Service Agreement on page 9 we called out the assumption that each 480V substation has on average 10 circuit breakers. We based our assumption on conversations with the plant electrical staff and other engineers who had previously done arc flash studies at the plant. Each substation on average had 30 circuit breakers almost 3 times the amount we assumed. Ryan (NFS engineer) had to spend more time onsite to collect the additional information and more time in the office entering in the data into SKM. Please provide authorization for the additional funds and provide a revised contract for our records. If you have any questions please let me know. Thank you, NAT' FIELD SERVICES Tyler DeBey EIT Electrical Engineer, Project Manager 469.312.1228 direct 800.300.01 57 toll free performance by design sn, 110 13 Your C) 0 0 0 ri ri � 0 0 o v 0 co Lq Ln 00 00 N O O o m m a� E +1 L O CQ J O C N 47 (0 QI N C O l6 U N � O ' L) v p O 0 4O O 6 bA Oi cc 1 N Q' N C O O � Q4- i O LL O �p 0 .O O a-+ C 'O Q a LN 4- 0 Z F