Contract 44155-CO6
r:4ATY OIECRM FORT WORTH,: City of Fort Worth �C�CrI�G?Q�►T X,a. Change Order Request Project Name North Beach Street from Vista Meadows to south of Shiver City Sec# 44155 Client Project#(s) 01292 Project Description 4-lane divided arterial street from Vista Meadows Drive to south of Shiver Road Contractorl Mario Sinacola&Sons Excavating,Inc. Change Order# © Date 1 10/14/2014 City Project Mgr.1 Michael Weiss,P.E. City Inspector FTom Miller Dept. TPW Water Sewer Contract Time Totals (CD) Original Contract Amount $4,738,543.04 $0.00 $0.00 $4,738,543.04 400 Extras to Date $494,820.30 $524,400.00 $1,019,220.30 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $5,233,363.34 $524,400.00 $0.00 $5,757,763.34 400 Amount of Proposed Change Order $82,300.00 $0.00 $0.00 $82,300.00 45 Revised Contract Amount $5,315,663.34 $524,400.00 $0.00 $5,840,063.34 445 Original Funds Available for Change Orders $189,456.96 $189,456.96 Remaining Funds Available for this CO $0.00 $0.00 $0.00 Additional Funding(if necessary) $82,300.00 $82,300.00 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 23.25% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $5,923,178.80 JUSTIFICATION(REASONS)FOR CHANGE ORDER Provide a footing for pannel fencing,just S of Alta Vista on the S bound side of Beach.Fence to be built by the homeowner's association. Footing and fence raised to block view into back yards due to raised street grade.Install curb and gutter on both sides of center median at the S end of the project and on N bound inside lane,just N of Herita1, 30 day added for the wall at Alta Vista and 15 days added for the curb and gutter. 'IF 0,1? �o ° �o Atte tl by: �o ooh r0FF1C1fA;\L RECORD ® i7 �p11't)S La�1�UF14J,y'Mary d. Kayser, CIlty Secretary �; M7Wmv V E It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Or . Contractor's Company Name Contract (Name) t Signature D to Mario Sinacola&Sons Excavating,Inc / At-'1 O / In S rvisor Ppte roj ct Man r/Program Manager Date Assistan Date ecto Co a;fi g Depart ent(Dept Date tTT \. Assistan ' A ey Date As tant City Manager Date 0 —Z t.,I 'e ' /C 2 /* \ Council Action(if required) M&C Number M&C Date Approved c� RECEIVED OCT 2 3 2014 \ rr � p o » \ 9 3 c -0 _3 a / X 0 K ° \ — q C § —0. / r 2 \ CD oc ± X « £ e 2 t g m E w % & ¥ 8 \ Cl) C _ 7 m \ § a & $ ƒ ƒ G ® E ƒ CD Cl) M S / a \ o 0 k_ / cc % 0 g ® / k / E ) � n ƒ E ■ 2 / =0 to m O 9 Oh CD g CL _k C 4 3 D 0 / CL cl) 0 A / (0) ° $ 0 S w D » a % D 7 0 \ C.n 2 # / . e E m 2 � � % 2 0 r C: E � _ / \ S \ 0 ^ CD ) ^ ? o � n v oa cD O Q D CL CL r+ 0 v m 00 m N O N c a --I o nL m D n m m Q 0 En cn 00 OC) N N W W 0 EH CD O O O O O O O O O O O O O 7 D 2 / o \ CD / m o CD R \ � ƒ / 7 / # J q _ f < e J 2 \ f CD e m 0- m CD / � k m 0 ƒ Cl) 90 \ \ w 0 7 / m e / \ J 0 \_ g s 3 \\ ƒ ? / CD ® § / / k m cn r m O 9 O h ƒ m ( o 0 m ® 20 3 / g � / =o 2 � n � 2 CO) m s / o w # § E & 2 D e / a � ) C: f f � / 0 � Cl) 0 / # \ 0 2 a & o cn E n 3 N m (D O (D (D (D rr O .O v UQ fD N O -h N c O' --I O_ O O N CD N CD (D O O EA of Q9 O O O O O O O O O MMBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders co# DATE AMOUNT Total $0.00