Loading...
HomeMy WebLinkAboutContract 44677-A1 CITY=SECMTAW UUI e, 0WRACT Nn,,_ AMENDMENT No. l TO CITY SECRETARY CONTRACT No. 44677 WHEREAS, the City of Fort Worth (CITY) and Tank Industry Consultants, Inc, (ENGINEER) made and entered into City Secretary Contract No . 44677, (the CONTRACT) which was authorized by M&C C-26360 on the 23rd day of July, 2013 in the amount of $104, 300 . 00; and WHEREAS, the CONTRACT involves engineering services for the following project: Northwest Elevated Storage Tank Rehabilitation Project; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated October 3 , 2014, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer totals $49, 999 . 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $154, 299. 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect . EXECUTED and EFFECTIVE as of the date last written by a signatory, below. City of Fort Worth UFFOW8,L t� ) Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 ���' � ���� Page 1 of 2 RECEIVED 2 3 2014 APPROVED: City of Fort Worth ENGINEER Tank Industr Consultants, Inc Fernando Costa Gregor R. "Chip" Stein, P.E. Assistant City Manager Managing Principal DATE : Q ,'Z" 1,4 DATE: [0 - (3 - 14 APPROVAL REC MENDED: Andrew T. Cronberg, Interim Director, Wat Department APPROVED AS TO FORM AND LEGALITY: M&C: N Date: Douglas W. Black Assistant City Attorney ATTEST: .l ®F p \14,00006000000 0 � ci o o°g- _ o° b Mary J. Kayser o g0 °0 City Secretary °o° °°°°.� OFFICIAL RECORD City of Fort Worm CITY SECRETARY Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 �. WORTHj TX Page 2 of 2 k TANK INDU CONSULTANTS 7740 West New York Street Telephone—317/271-3100 Indianapolis,Indiana 46214 FAX—317/271-3300 Christopher Harder,P.E. Engineering Manager/Water Production October 3,2014 Fort Worth Water Department 1000 Throckmorton Street Fort Worth, Texas 76102 RE: Funding Request for Professional Services Rehabilitation of Northwest Elevated Water Storage Tank Fort Worth, Texas City Project No. 213 8 City Secretary Contract No.44677 M&C No. C-26360 TIC Ref. 13.170.S465.009 Dear Mr.Harder: TIC requests an increase in funding for the referenced contract for engineering services for the Northwest Elevated Tank Rehabilitation Project. As you know,the agreement calls for TIC to provide services on a time and expense basis with an estimated Not-To-Exceed limit established before the actual scope of work was defined and the contractor selected. As we have discussed,the additional cost to the City resulted from the additional time the contractor needed to complete the work: There was no overbilling, or unnecessary work or expense billed. Please take into account the following as you consider our request: 1. Our fee estimate for the project was not based on a detailed inspection of the tank or known scope of work. 2. We estimated a typical contractor would take about 16 weeks to complete a typical rehabilitation, but the contractor was on site for 24 weeks. 3. Inclement weather conditions(wind and rain)resulted in longer hours (overtime) on good weather days. This overtime increased cost. On several occasions rain required rework, e.g. reblasting of areas already blasted. 4. The contractor had a relatively small crew of men working longer hours resulting in more overtime for our observer. 5. The contractor achieved Substantial Completion thirty-five days after the required date. Please remit to: 7740 West New York Street,Indianapolis,Indiana 46214 Page 2 October 3, 2014 The table below provides details including classifications,time, expenses,etc for the additional funds needed. Services Invoice Amount Date Evaluation 29620 $8,098.90 10/22/2013 Specifications 29782 $9,977.83 11/21/2013 Employee Name Hours Rate Total 167 Registered Engineer 19.25 $42.97 $827.17 230 Project Manager 36.15 $52.77 $1,907.64 348 Field Technician 1042.75 $24.69 $25,745.50 318 Field Services Manager 48.75 $35.87 $1,748.66 43 Senior Principal Engineer 3 $91.00 $273.00 238 Clerical 21.5 $17.33 $372.60 338 Clerical 1.75 $13.70 $23.98 $30,898.54 Payroll Burden 2.31 $71,375.62 Total Professional Services $102,274.16 Direct Costs Qty Cost Amount Transportation 739 $0.60 $443.40 Per Diem 157 $165.00 $25,905.00 Meals 2 $3.89 $7.78 Subcontracted Expenses JDE 2 $6,732.00 $6,732.00 Laboratory Analysis 18 $10.00 $180.00 10%Markup on Subcontracted Expenses $691.20 Total Other Direct Costs $33,959.38 Total Professional Services: $102,274.16 Total Other Direct Costs: $33,959.38 Total Resident Observation $136,233.54 NTE $104,300.00 Project Billed to Date $154,310.27 Remaining ($50,010.27) Page 3 October 3, 2014 JDE Invoice#740(not invoiced) $7,135.00 TTI Laboratory Analysis(not invoiced) $370.00 Contract Administration(not invoiced) $403.06 (57,918.32) Change Order $49,999.00 TIC Write Off $7,919.32 If you have any questions or need additional information,please contact me. Sincerely, Tank Industry Consultants q J" 'p" Stein,P.E. Managing Principal enclosure cc Ray Penny—TIC,The Woodlands