HomeMy WebLinkAboutContract 44463-CO1 CITY SEC c 'Alf FORT WORTH® City of Fort Worth CONTRACT NO.. �' I Change Order Request Breakdown Project Namej 2011 Intersection Capacity Improvemetns at three(3)Locations City Sec# 1 44463 Client Project#(s)l 01815 Change Order Submittal# Date 9/5/2014 Contract Time Dept. TPW Totals CD Original Contract Amount $415,712.00 $415,712.00 180 Extras to Date Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date "$415,712.00 - ., $415,712,00 180 Amount of Proposed Change Order z `*` 49'139:30 $49139.30 Revised Contract Amount = $464;851:30=; - :°"' °"„x=fxx, $464,851.30 180 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO _ $0..00_ Additional Funding(if necessary) $49;139'30;t {_, $49,139.30 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 11.820 MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $519,640;00 Changes as shown on plans dated 3/3/14 to change traffic signals,lights,and striping for variour intersections on the project. Final Quantity Reconciliation to account for quantity overruns and under runs. C�F PO A 0000 000000 4Z/ 0 J. Cy ecrety �$ �° �i +'00000,0 S OFFICIAL BETA Y CITY SECRE FT.WORTH+TX • FORTWORTH City of Fort Worth Change Order Additions Project Name 2011 Intersection Capacity Im rovemetns at three 3 Locations City Sec# 44463 Client Project# 01815 Change Order Submittal# 0 Date 9/5/2014 ADDITIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total Remove Guardrail 4 Remove Concrete Pvmt TPW 115.00 SY 34.00 6 Remove Conc Curb&Gutter TPW 987 LF $13.00 11 2"CONDT PVC SCH 40(T) TPW 80.00 LF 10.00 12 2"CONDT PVC SCH 40(B) TPW 105.00 LF 21.00 24 2"Asphalt Pvmt Ty D TPW 50.00 SY $50.00 29 9"Conc Pavement TPW 120.00 SY 66.75 30 4"Conc Sidewalk TPW 434.00 SF 7.50 34 7"Conc Curb&Gutter TPW 99.00 LF 29.50 36 8"SID Pvmt Mrkg HAS W TPW 322.00 LF 2.00 39 Lane Legend Arrow TPW 1.00 Ea 120.00 40 Lane Legend Only TPW 1.00 Ea 140.00 43 Refl Raised Mrkg Ty I C TPW 54.00 Ea 3.25 $175.50 46 4"Remove Pvt Marking TPW 1,010.00 LF 1.50 47 8"Remove Pvt Marking TPW 97.00 LF 2.50 49 18"Remove Pvmt Marking TPW 335.00 LF 4.75 52 Conc Ret Wall w/Sidewalk TPW 10.00 SF 43.00 73 8/C 14AWG<ulti Cond Cable TPW 160.001 LF $2.25 76 No 8 Insulated Elec Condr TPW 990.00 LF 1.10 77 No 8 Bare Elex Condr TPW 10.00 LF 1.10 79 10-14 Ped Pole Assy TPW 1.00 Ea 330.00 86 Ty 1 Signal Foundation TPW 1.00 Ea 800.00 96 Traffic Control ITPW 1.00 Mo $2,250.00 105 Ground Box Small w/Lid TPW 2.00 Ea 700.00 107 4"SLID Pvmt Marking HAS(Y) TPW 800.00 LF 1.75 108 4"BRK Pvmt Markings HAS(W) TPW 200.00 LF 1.75 $350.00 109 5-Sect Signal Head Assmbly TPW 1.00 Ea $2,000.00 110 Loop Detector Cable Sawcut TPW 830.00 Ea $8.00 111 4/C 18 AWG Loop Lead-In Cable TPW 950.00 Ea 2.00 112 Ground Box Small w/Lid Apron TPW 2.00 Ea 950.00 113 3"Asphalt Overlay Type D TPW 60.00 SY $29.06 114 Adjust Grond Box to Grade TPW 3.00 Ea $160.00 115 Remove and Replace Existing Tree TPW 1.00 LS 5,850.00 116 24"Thermo Crosswalk TPW 616.00 LF 7.25 117 Remove&Install LED Sections TPW 3.00 Ea $120.00 118 Remove Signal Head TPW 1.00 Ea 115.00 5. 93 Furnish&Inst Sign Mast Arm Mount TPW 1.00 Ea 250.00 94 Furnish&Inst Sign Ground Mount TPW 4.00 Ea $625.05 5 . TPW $66,153.75 Sub Total Additions 66,153.75 Change Order Additions Page 1 of 1 FORTWORTH City of Fort Worth Change Order Deletions Project Name 2011 Intersection Capacity Improvemetns at three 3 Locations City Sec# 44463 Client Project# 01815 Change Order Submittal# _J Date 9/5/2014 DELETIONS I DESCRIPTION DEPT Qty Unit Unit Cost I ota Conduit PVC Sch P 5. L 14 3"Conduit PVC Sch 40 B TPW 190.00 LF $23.00 27 4"Asphalt Pvmt Ty B TPW 2.30 SY 39.00 35 4"SLD Pvmt Mrkg HAE W TPW 35.00 LF 1.75 37 12"SLD Pvmt Mrkg HAE W TPW 8.00 LF $3.50 38 18"SLD Pvmt Mrkg HAE W TPW 124.00 LF 5.25 41 Raised Marker Ty W TPW 96.00 Ea $3.25 42 Raised Marker Ty Y TPW 75.00 Ea 3.25 44 Refl Raised Mrkr Ty II A A TPW 8.00 Ea 3.25 45 Refl Raised Mrkr Ty II C R TPW 59.00 Ea 3.25 48 12"Remvoe Pvmt Marking TPW 20.00 LF $4.50 50 Remove Lane Legend Arrow TPW 4.00 Ea 55.00 51 Remove Lane Legend Only TPW 2.00 Ea 55.00 53 Topsoil TPW 206.00 CY 16.00 54 Block Sod Placement TPW 50.00 SY $4.00 55 Seeding Hydromulch TPW 25 .00 SY 3A0 56 Manhle Adjustment Major withCover TPW 1.00 Ea 1,600.00 57 Manhole Adjustment Minor TPW 1.00 Ea 2 0.00 58 Misc Structure Adjustment TPW 1.00 Ea $200.0 92 Salvage Traffic Signal TPW 1.00 Ea 1,000.00 97 Portable Message Sign TPW 15.00 WK $100.00 106 Irrigation Water Meter Relocation TPW 1.00 Ea 1,600.00 TPW $17,014.45 Sub Total Deletions $17,014.45 Change Order Deletions Page 1 of 1 M/SBE Breakdown for this Change Order --Amfb 41 MfSBE Su e f SeN: po ce ouor;tfii s GO j Rubio Trucking Haul Off Trucking $2,250.00 Total a $-4- Previous Change Orders ca# #� yDATE : . j s ': WOW ¢= x Total y� _ <$0:00 _' U1,W Uhange Urder Approval St-COApp01 Page 2 of 5 FORT NORTH. City of Fort Worth Change Order Request Approval (Change Order Breakdown Available in Links) For Change Order Submittal No.: 1 Change Order No.: St-COApp01 Date Started: 2014-10-14 City Sec. No.: 44463 Date Due: 2014-10-28 Project Name: 2011 Intersection Improvements Phase 1 01815 DOE Numbers: Project Numbers: DOE No. 6986 Project Intersection widening, sidewalks and traffic signals at 3 Description: locations, 7th @ Carroll St. , Handley Ederville @ Randol Mill Rd. and S Hulen @ Overton Plaza Project Manager: Lissette Acevedo City Inspector: Mike Collier Contractor: McClendon COUNCIL ACTION (If Required): M&C Log Name: M&C Number: M&C Date: COST AND DAYS SUMMARY: Requested Department: Cost($) Fund Account Center: Days: TPW $ 49,139.30 C295-541200-201390181583 0 Total Cost: $ 49,139.30 Total Requested Days: 0 Approval Status: RECEIVED OCT 2 p 2014 https://proj ectpoint.buzzsaw.eom/ bz web/Forms/FormPrint.aspx?Siteld=51500&Proces... 10/27/2014 urw Lnange vrclerApproval St-COApp01 Page 4 of 5 Approved: Yes Comments: User: Justin Blair Date: 2014-05-01 4:10 PM Approved: Yes Comments: User: Lissette Acevedo Date: 2014-06-19 8:38 AM Approved: Yes Comments: User: Justin Blair Date: 2014-07-02 2:52 PM Approved: Yes Comments: User: Lissette Acevedo Date: 2014-07-02 2:58 PM Approved: Yes Comments: User: Justin Blair Date: 2014-10-14 4:44 PM Approved: Yes Comments: User: Lissette Acevedo Date: 2014-10-16 2:02 PM Approved: Yes Comments: User: Todd Estes Date: 2014-10-17 2:18 PM Approved: Yes Comments: User: Andy Anderson Date: 2014-10-22 9:45 AM Approved: Yes Comments: User: Doug Wiersig Date: 2014-10-22 12:51 PM Approved: Yes Comments: https://proj eetpoint.buzzsaw.com/_bz_web/Forms/FormPrint.aspx?Siteld=515 00&Proces... 10/27/2014 CFW Change Order Approval St-COApp01 Page 5 of 5 User: Doug Black Date: 2014-10-23 5:06 PM Approved: Yes Comments: User: Fernando Costa Date: 2014-10-23 11:04 PM Action Required: https://projeetpoint.buzzsaw.comJ bz_web/Forms/FormPrint.aspx?Siteld=51500&Proces... 10/27/2014