HomeMy WebLinkAboutContract 46108 C1W SECR AW. L-1 l P I CONTRACT NO. ow INTERLOCAL COOPERATION AGREEMENT FOR DESIGN SERVICES OF WILLOW SPRINGS ROAD AND BLUE MOUND ROAD WHEREAS, NORTHWEST INDEPENDENT SCHOOL DISTRICT, a Texas independent school district, ("District") and the City of Fort Worth, a Texas municipal corporation ("City"), each desire that certain roadway and street improvements are made to Willow Springs Road and Blue Mound Road in the City of Fort Worth, Tarrant County, Texas, (the"Project"); and WHEREAS, District desires the Project to advance on an earlier schedule than it might otherwise have been implemented; and WHEREAS, District and City(collectively, the "Parties") desire to enter into this Interlocal Cooperation Agreement("Agreement") in order to accomplish the goals of the Parties; and WHEREAS, both the City and the District have authority to enter into this Agreement pursuant to Chapter 791 of the Texas Government Code; and WHEREAS, District has retained the services of M.J. Thomas Engineering, LLP to provide for the design of the Project; and WHEREAS, the City desires to contribute to the costs of the District's design of the Project, as further described in this Agreement; and WHEREAS, City has reviewed both the scope, fee, and schedule for the design of the Project and find them to be fair and reasonable; and WHEREAS, it is understood that this Agreement may be amended from time to time to accommodate expanded scope and cost participation; and WHEREAS, Construction of the Project will be performed by the City at its cost, and the District shall reimburse the City for a portion thereof, all as set forth herein, subject to availability of funding and based on a public bid process; and WHEREAS, construction of the Project may be accomplished in phases by the City. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein,the City and the District do hereby agree as follows: General Requirements A. The Project will generally consist of improvements related to the NISD-CFW Interlocal Agreement re:Willow Springs c �Bl e�oun p ovements Page l -�__ RECEIVED NOV - 32014 construction of a portion of Willow Springs Road and Blue Mound Road ("Blue Mound Phase") as such improvements and the location of such improvements are further described depicted on Attachment A hereto. B. District has retained MJ Thomas Engineering, ,LLC., as the "Engineer"for I the Project pursuant to a written agreement reviewed and approved by the City(the"Engineering Contract")attached as Attachment C. C. 1. City agrees to reimburse District for the actual cost to complete the design of that portion of not immediately adjacent to the Willow Springs Phase at an amount not to exceed $ 394,576.47 upon presentation of plans for Willow Springs Phase, including, as appropriate, engineering drawings, studies, renderings, contract specifications, estimates, and other documents, (collectively the"Willow Springs Work Product") necessary to construct the improvements contemplated by this Agreement. 2. City agrees to reimburse the District for the actual cost to complete the design of the Blue Mound Phase at an amount not to exceed$ 150,887.21 upon presentation of plans for Blue Mound Phase, including, as appropriate, engineering drawings, studies, renderings, contract specifications, estimates, and other documents, (collectively the "Blue Mound Work Product") necessary to construct the improvements contemplated by this Agreement. An estimate of the design costs and fees is attached hereto as Attachment B. D. When the design is completed and accepted by the City, the District agrees to provide an escrow account for its pro-rata share of the construction cost based on the engineering opinion cost plus a reasonable increase per year for local inflation increase until December of 2017 based on the City formula to reimburse the City one half of the City's actual documented construction costs for the portions of Willow Springs Road upon which District's currently-owned property has frontage. The escrow account will be drafted monthly during the construction based on approved pay-applications by the City and approval on the district's engineer on record. E. To the extent permitted by law, the District covenants and agrees to, and by these presents does hereby, indemnify, hold the city, its officers, agents and NISD-CFW Interlocal Agreement re:Willow Springs Rd and Blue Mound Rd Improvements Page 2 employees harmless against any and all suits, actions or claims of any character, including, but not limited to, those for property damage or loss and/or personal injury including death, that may relate to, arise out of or be occasioned by (i) District's breach of any of the terms of this Agreement or (ii) any act or omission of District or any of its affiliates, officers, agents, associates, employees, contractors or subcontractors, related to the Project, except that the indemnity provided for in this paragraph shall not apply to any liability resulting from the sole negligence of the City its officers, agents, employees, or separate contractors, and in the event of joint and concurrent negligence of both District and the City, responsibility, if any, shall be apportioned comparatively in accordance with the laws of the State I of Texas. F. District agrees that the Engineering Contract shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contract. City shall have design review and the right for input at a minimum of 15, 30, 60, and 90% design milestones. District agrees to follow City's locational criteria for sewer, water and other transmission facilities. G. The Parties acknowledge and agree that the performance by City and District of their respective obligations under this Agreement constitute governmental functions. H. All payments, if any, required to be made by District or City hereunder shall be payable from such party's current revenues or other funds lawfully available for such purpose. 1. The Parties agree that City and District have not waived their respective sovereign or governmental immunity by entering into and performing their respective obligations under this Agreement. [the remainder of this page is intentionally left blank;signature page to follow) NISD-CFW Interlocal Agreement re: Willow Springs Rd and Blue Mound Rd Improvements Page 3 IN TESTIMONY WHEREOF,the City and District have each caused this instrument to be executed in quadruplicate in its name and on its behalf by its duly authorized representative. EXECUTED and EFFECTIVE as of the date last written by a signatory,below. APPROVED: CITY: DISTRICT: CITY OF FORT WORTH North stl D. Fernando Costa Joolraswich i Assistant City Manager Chief Financial Officer DATE: /0 3111+ DATE: AP OVAL RECOMMENDED: f U Douglas lk Wiersig Director,Transportation and Public Works Department APPROVED AS TO FORM AND LEGALITY: M&C: - - (/ Date: Douglas W.Black Assistant City Attorney ATTEST: �o o OFF6CM RPECORD Mary J. Kayse r �A City Secretary ° 4 �O Ii G1Ry NISD-CFW Interlocal Agreement re:Willow Springs Rd and Blue Mound Rd Improvements Page 4 List of Attachments to this Agreement Attachment A—Project Description Attachment B -Project Design& Construction Financial Summary Attachment C—Engineering Contract [follows] i 1VISD-CFW Interlocal Agreement re:Willow Springs Rd and Blue Mound Rd Improvements Page 5 O on I I Lo e e BLUE MOUND ROAD °LL �o w F Q Ras Lo N O W Cl W \ Z g � � Q o 0 1 � C9 Z W N Z Z W � 3 2 3 U � � m � d0 W CK J IT f — W C9 Q W Z LaI N — — V Q N W T1 T1T I I I ATTACHMENT B, Page 1 V.R. Eaton High School at Willow Springs & Blue Mound Rd Engineers Estimate of Probable Cost Package II- ILA Willow Springs & Blue Mound Road $14,317,851.64 MJ Thomas Engineering-Design Fees EWmated Engineering Fee $715,892.58 City Share City Share NISD Share Blue Mound Willow Springs Willow Springs TOTAL Contract Contract Date Off-Site Design Fee S%of Construction Cost Amount Invoice Amount Invoice No. Date Invoice5tatus 22.50% 58.00% 19.50% 100.00% 8/6/2012 Predevelopement Per Contract 20% $75,000.00 1773 11/21/2012 Paid by NISD $16,875.00 $43,500.00 $14,625.00 $75,000.00 $19,050.00 1795 2/6/2013 Paid by NISD $4,286.25 $11,049.00 $3,714.75 $19,050.00 $16,379.31 1987 2/1/2014 Processing $3,685.34 $9,500.00 $3,193.97 $16,379.31 $18,614.43 1988 3/1/2014 Unpaid $4,188.25 $10,796.37 $3,629.81 $18,614.43 $14,061.06 1989 4/1/2014 Unpaid $3,163.74 $8,155.41 $2,741.91 $14,061.06 $73.72 1990 5/1/2014 Unpaid $16.59 $42.76 $14.38 $73.72 Construction Drawings Per Contract 63% $32,758.64 1987 211/2014 Processing $7,370.69 $19,000.01 $6,387.93 $32,758.64 $194,406.59 1988 3/1/2014 Unpaid $43,741.48 $112,755.82 $37,909.29 $194,406.59 $198,959.96 1989 4/1/2014 Unpaid $44,765.99 $115,396.78 $38,797.19 $198,959.96 $24,887.55 1990 5/1/2014 Unpaid $5,599.70 $14,434.78 $4,853.07 $24,887.55 `.d`�'g PO.`°...."° ty B Scope Deleted per 7/8/2014 meeting with attendees " lim Walker,Dennis McCreary,Mehran Aghll(and Michael Thomas.Future City Project. TOTAL MI THOMAS ENGINEERING DESIGN FEES 100% $594,191 $133,693.03 $344,630.93 $115,867.36 Mi Thomas Engineering-Reimbursable Fees Proposal Proposal Date Service Amount Invoice Amount Invoice No. Date Invoice Status City Share City Share NISD Share TOTAL Off Site Survey Willow Springs and Blue Mound Rd $10,700.00 1472 1/27/11 Paid by NISD $2,407.50 $6,206.00 $2,086.50 $10,700.00 City 80.5%(WS 58%,BM 22.5%),NISD 19.5% 6/18/2012 Topographic Survey City 80.5%,NISD 19.5% $10,120.00 $10,120.00 1748 8/29/12 Paid by NISD $2,277.00 $5,869.60 $1,973.40 $10,120.00 `°P-t 8 Scope Deleted per 7 18/2014 meeting with attendees Jim Walker,Dennis McCreary,Mehran Aghili and Michael A...:..lpatedl D._:..,..,,r_.,.......,.. $2,40¢gg Thomas.Future City Project. r$5,280.00 Location of Potholed Existing Pipelines-Survey $5,280.00 $5,280.00 1791 1/15/13 Paid by NISD $5,280.00 $25,600.00 1 11/12/2012 Willow Springs Test Holes-City75%,NISD 25% $24,800.00 1763 11/12/12 Paid by NISD $18,600.00 $6,200.00 $24,800.00 10/16/2011 Traffic Impact Study-NISD High School#3 $28,125.00 $22,500.00 1655 1/30/12 Paid by NISD $22,500.00 $22,500.00 $5,625.00 1697 5/29/12 Paid by NISD $5,625.00 $5,625.00 Signal Warrant Studies City 50%,NISD 5076 $8,900.00 $7,120.00 1655 1/30/12 Paid by NISD $1,780.00 $1,780.00 $3,560.00 $7,120.00 Signal Warrant Studies City 50%,NISD 50% $1,780.00 1697 5/29/12 Paid by NISD $445.00 $445.00 $890.00 $1,780.00 Traffic Signal Design$12,000 per Intersection $24,000.00 $13,866.25 1923 2/26/14 Paid by NISD $3,466.56 $3,466.56 $6,933.13 $13,86 City 50%(WS&BM),NISD 50%(WS&Mascot) $10,133.75 Not invoiced $2,533.44 $2,533.44 $5,066.88 $10,13_ No Proposal Traffic Consultation Services $2,150.00 $2,150.00 1839 5/28/13 Paid by NISD $2,150.00 $2,150.00. TOTAL MI THOMAS ENGINEERING REIMBURSABLES $114,075.00 $114,0 Other Reimbur5ables 10/3/2012 Geotechnical Investigation Willow Springs&Blue Mound $27,840.00 $19,043.00 86541 1/7/2013 Paid by NISD $4,284.68 $11,044.94 $3,713.39 $19,043.00 Fugro Proposal 004-0012-1047R TOTAL OTHER REIMBURSABLES $19,043.00 TOTAL • $727,309.26 • t $727,309.26 Engineers Opinion of Probable Cost Blue Mound Road-By City $3,223,039.70 Willow Springs-City Portion 75% $8,306,095.43 Willsow Springs NISD Portion 25% $2,788,716.52 City Total Willow Springs(58%)&Blue Mound(22.5%) 80.5% $11,529,135.13 NISD Total 19.5% $2,788,716.52 $14,317,851.65 7/15/2014 ATTACHMENT B, Page 2 Engineer's Opinion of Probable Cost trNlattu.fewu.. .rN.�4 ,. 1111_. E..,S,,.N9 1133 _ 13...ye.. 1391°+0 aur]saa a u9 D...y 8N9vrp 1 18 Wdi:3l Retrove 6etlerak NSF St+ 1.63 351 St�6 Ph1.3 15X].82 St+�1.N 351 � 31.3 33564/.81 2 W{1.07W Retrore Ma4lot - FA S 6691 3 3 0691 E23T3 S 06.91 3 5849+ 523.79 3 341.051 fteirane FerRe LE_ 3s S 424 5161.12 3112 5 924 313,19488 400 S 429 51,695.3 3550 Sd2d 515.323 d 191.0800 Remove RPRap _SF S 259 2'v00 8 259 56,4352 5 259 Y.AJ 5258 f6,gFvm _ 5 0241130 F of rc Rik SV_ 5 9]6 1122 5 A)6 114950.]2 5 9.76 1122 39.T6 310,950.)1 6 29112 fl 36'V/R Lare LF 399 S 5. 31),910. 116 S 5.. 5s1M- 5 S.m 514 S1S1 59.13.3 .__ 20.30 %11 31W.W6- 0241112 R 0.551311 P+rrl _ SY 943 S 611 44,94].90 12553 S fiii 3)6599.81 255) 5 6.11 415.6233) 0 0X1.133 Renwef cCVb4GLLtu Lf S 46 T1 s 449 53,1432 Y 46 ]- NB 3314)- 9 W41.15105ainge FSe _EA S 1+0.16 3 5 310.16 4930.43 S 111116 3 331Y16 5930K 10 0241.3011 Remove t5'Slmmllne- LF- 5 3 15.3 E)15.W 3 S 15.3 51399.10 3 153 133 5153 5211470 ii 0341.3015 arrgN 24'Slmmlare - -- LF -S 20.27 361 S 37,436. W S M2J 54691 90] fIDT Ss,tOB_W 12 0241-Ramore4-p-t EA -5 823)3 1 5 823]3 E833]J 1 S 821.]3 5921)3 I fs23T3 116n,K 13 W41.dG]1 Rerrcre 1131°33557 FA 4 S i.Mp91 SS01 S6B 1e 5 1,203.92 5216)0.46 -S 133.42 22 31,hU92 SM,406I9 14 26010101 Ekctrd FaolS -S 330.- 1 S 3,500.3 $351.2 -3 3.5'.W 1 5].30.- 33.533 15 26030111 ELECSERV FED EA -S 4.9143 3 3 A.M. S1Q7Sfi70 -4 9,910.3 3 N914W 519.]%70 16 L6 -3 1500.3 t 5 1532 51,5313 -5 1.500. 1 511533 51500.3 17 2603 3011 2CGlAT PVC SCH6m ;169 S 432 51),9)1.20 5,822 1 632 44s,845.04 1.030 s 44 58,5213 904 5432 575395N LF is 2EP3.3012 7[61.537 PVC 53161°1 lF -1 163 4- 5 143 $8,0952 -S 16.m 4q Stfl3 N.0053 19 235_-t42'COhVT RY(Raeq_ LF -3 25.- tl $ 252 51000- -S E.1 tl 315. 41m0.- __- 333 5 426 5275724. -3 420 333 M18 32]4724 20 2605.3-13'COMTPYC SCH tl(<L_ LF E 62s ]t9 5291 31)2%. 21 25-30223-CC03>RVCSOt6.3 _!F -S 24.1 ]19 S 24- 41],2%.W -1 24W 21 3110 0 5i l3azrerg AC s 4113. SJ6,m03 15 S 4,500.. 315),5-. 1 4 d:.mW 190003 6 N51W 3ffi,5'.. 23 3110 02 6' TT Fetroval EA ZS S 12.53 58,18.- 118 S 175- 520,650.00 11 S 1712 52.2113 3 $1761 S..-. 3110.010312-18'73°°RetrwY -S 2Mm 5 S 2841 51 aS].Po t 5 2641 51N.. 16 52%2 51,7111 25 3110010318'-24 Tree Rertv21 EA i S 311 1396.- -S 391. -$ 3963 1 5395.1 -I 6 25 31230101 Dn(13ae54d 6vsra0on W PYr CV 149. S 1116 52.3,600.. 1),33 3 1326 S229,393W 8132 S 1328 $110,05°3 13601 11123 5578.136- 2) 31'_`5.0101 5l-P 1133° LS 1 S 50,-0.- S`A 0-3 -S 50,0'.1 53130.3 150,.0.3 1 313].0101 Cauep _ ST -S X.- 1111 S X- SHJ 0.:a 55 -3 Xm 1111 3542 53.049.55 A 313).0131uSbre R�rapyrou:w SY 2m 5 102. 11,612. 2,310 3 1380 32]4`544Po S 1023 3000 4113 33..60.3 - 32111-WE tdLM _ Ttl 191 S 1%4 544fi504 95)S 15032 5145,359.44 135 5 150.32 $10.44?52 f9m 515032 5210.944. J1 32119502 0-LmeTreaSrM_ SY 14,1. S 215 53,912. 44,666 S 2]5 5122,631.60 6.481 E 2]5 st).31.- 6612 5275 Si79.5)SU] 31 3212 302 2'Aytut PnrdJr)kD_ ST 3,718 5 13.34 59459612 5,032 S 13X 12669 - 4 13.30 BI3 51331 5116.7151 3212891 PlUFtivat Rau Type6_ 3,]18 5 2443 S1D5.)0274 6462 $ 28.43 4126,05150 Y 2443 813 SM6 SIII,5576 X 3113030'15'COrc SAewak 18.411 1 125 33.)0475 38,3% 3 415 512,1650 2.151 5 425 530.400.25 61940 N25 5183.18/30 sF - 23] S fim SID.D7631 1021 5491 33.30fi93 35 3213.061 6'CmerHx prexa7_-_ 3` -S 63 7,104 3 693 44923471 36 32130502 Wr Free Ramp,Type_U-1_ EA 4 5 650.79 $;69316 1 S 40.]9 S334W 1 E 6319 S330.g0 5 XG0.79 333395 37 321305. rFree Ramp,Ty�µt EN -4 69480 5 3 fi9488 53,q]4tlJ -5 694.BS 5 3699°8 53,gJ4.tl 3 3213050/fiarrzr Free Ramp,Typeµ2 EA -5 5:9.3 1 4 960. 4474. 1 4 850.3 NIS- 1 59593 593. 39 321305.Dr Free Rarry Type 4 s0.450 c845 fig 3 Od5.3 1 5&512 SBK.3 6 3213 8Ne Free RU T3 C3 -FJ.- 2 5 950.3 519311 -3 Y0..- - Y 93.W 2 593.W 11,9W.W 41 321307Po N9t Sea9rt __ LF /0,000 5 1.3 $15,911 1656 S 1.59 524293.3 3.]11 S 159 4$.843W J02tl 5158 36,W13 6 32150 O1 6Cm0CUD bGr@er lF 3.239 5 Mm 41,]71.X 6,124 S 893 5128,17112 1.139 s Mm Sz3,014X 1052 f33L0 3219,]68.. 5 3216.0102 1'Cm0 C3a5ertlGWer - _LF -3,6/5 3 1499 $51.68415 5,185 S 1499 589736.14 1539 S 14% SMm96+ 10500 St199 3157.3951 M 331]03145LDRm1 YxF1g HAS 0"0_ - _LF_ _ 29)0 S 191 511]01.3 4139 S 3.91 416,307.4 1.1 E 3.90 55.44159 4500 5391 533,60.3 45 321]00341411 Writ NaAng HASjYrj_ lF -S 1.62 1,765 5 1.62 524092 rX $ 1.62 51,169. 1`.,00 51.. 5403.3 K 3217.050124'SLD WrtQ YaAevi F43E L\!3_ LF- 93 Y fiF5 5645 J5 16 S 6.95 49]3. Or 5 6m 53M.4 23 X91 31,9K.m 47 32171.1 Laru.L_cyemJ Nroa - EA- T S 1393 3114].51 W S 16393 5491).a] 4 5 163.93 56%]2 qi 51393 %]21.13 49 321)1.3 tareL gMIMLMOw _ _ Fl. 2 5 1..- 11.,2 6 S 1.. 51,163 -5 111 8 5190. f1,5M3 49 3217.10041are LCgrtl_pJ(_ EA 9 S 191.13 576532 19 S 191.3 5263462- 2 3 1913) SJB24 ID 5191.33 21. SS W 32.1/.136 Lvrx LCgeM BAe -- EA 22 s 35).85 59,09292 W s 3.61.85 51213339 3 4 36).86 511123 % 52.510.6 321..4® 51 3217231 R-Ma,-Y EA- 62! 5 3.m 51,91494 1165 5 303 53,59129 563/.49 194 U.. .I- 62 32172002 Ra¢M Nnfrsr TYY EA- 3]0 $ 3m 51,1363 1,212 5 111 53,]3295 78 5 J.3 $2639 1800 5300 35,1123 3 321].2102 REFLRaSMYaritr TY3C EA 4 Y 445 530270 635 4 4K SZ625.75 3 E 45 5135.65 770 31,45 53,44930 54 3217.2103 REFLR. NarMr T_YIM-A _ Eq bt 5 411 $1135.12 683 S dm SZ75243 44 5 5171.32 1m1 S'l 341513 3 3231.0113 6-Ctgk,Lia�6Yee1 lF -S 14. 2,20 5 14. 5313,.93 -S 19.. 2301 514. 33813 4 31310211 Da�Rtl N9a FetC_e MahlEMts lF -5 5. ;JW 5 5141fi2.. -5 i3 TiW SS3 516.1923 57 3231..0410 GatgSYel FA -3 375.3 1 1 3711 5375. 5 3)5- 1 33753 SS/5m 3 3231.308 t6 Gate SeN- - FA -5 5[01'0 6 5 500. 53.OPo -5 590.3 8 3`u00W 333313 N 3291013 Tops'.__ -- CY_ -S 10.3) 2500 5 16.3] 56,925- - 5 16.31 Z5W 3183) 16,9153 382013 3 Sad Pli ed --S S 45 1,900 S 1. 4943. $ I.. S44 546390 b1 3I820wW SezWg.H7dm94D-- - - -ST - 951 S 15 54660.3 ],]3 3 - 511,470.00 2]3 5 Z. N'.0.- 15000 31.5 32220000 61 3292 -setWy,601 R.rGOO&artrt--- --SY- 2001 E 2. 31,0'.- 500 3 2. $1150.Po $ Z. 252 523 38.250.3 63 32?2PAJ S x3rg _EA_ 1 s 451- N.0.. 2 S 4,533 492000 1 5 45003 59500. q S(51m 51420.3 v 64 3305 t.Fipbrffigy FipYaWnd EViaYgLlY3ie FA_ 5 S 433 12141 9 43,3000 6 S 643 5;411 ID Ztl000 34Dm.- 4 330501.TterMSal4y lF 3,9.5 123 55053. 8,475 S 1260 S1 W,c... 2015 5 123 52653- 1653 51280 5185,.01 4 3305.0110 L[3t1 Y_vk_A 1.4- 67 3395.0111 Va3re Blv Ad,NLene11_--- EA -S 2.,12 9 S 4218.12 31]69. 1 5 26.12 5104. 9 .- N,873- 4 334.0110 Yadch 0.qusVrtv0�11apM-Covet EA -S 3,031 2$ 3,000.. 54.02 15 3103.. $1532 2 0,130.1 %OWW 3 331+.0141 Du-LY.Iron lYa'sr F[f4gwl R_eL-ar_9 TIX! - S 461234 1 3 669234 44,64234 1 S 4842N N64231 2 N6923q 39,2843 70 33110141 6'.3sr Rpa lF -S R2B 110 S 47.24 5520080 110 S 4/TS 45.3103 220 wm 510.61.3 ]1 .1;:-1 16VPVC 0905 a`er Pya -- LF -5 10.36 1,911 S ]0.}i 41X,457.53 1911 S 3016 S1NS1.95 3sII 0a. 126891592 ]3 .11.371 3a Cowe:e AK':aA 0303YAtef F!M LE -E 40231 514 $ 40231 12.,]6].X -E 6231 514 Stl23 $-.73.34 3311.23].H CoevMe NNVYAC303 Ytafer P{pe, 3F _S 4. 514 S 459 - S 43 52,1133 619 NW 52)/13 74 33120001 Fre H13ar{_ _ 3 291053 2 4 2,910.63 55,821.4 3 5 1,91053 %)311`0. 6 5291051 5143265 -- 1 5 ;71- $1 YAW 1 521'.W 5?r3W JS 331201_13 CavKCtq_t F_a_i3Vi91EYJata Natr FA_ -S ?7-W 1 E 2)23 51,332 76 11120110 GP Onto Embn36'IYafer Nain _EA -S 4566.15 3 3 8,556.15 521,300.30 1 S 0,5%15 N2]flm 3 18,65615 525,664dS 77 53123036-G eValx -EA -S 1.10].91 1 s 1,11).41 $1,10741 1 4 1,10].41 41,101.41 2 51,101.41 522113 70 33123Wfi i6'GaY VOITe w/Nate EA -$ 1;41120 2 5 1;41181 12982369 2 Y 1;411,84 32402160 d 512411.80 36.69).36 T9 33124314 30 316 Ta{pp3kree Ve6e. FA -5 25,011 1 4 Y, - 512,5.CO 1 $ 35.0003 5$1.1. 1 125,0002 12$11-.W 3 33 1 Xl 2 C IXl 11 --LF 1 1 5 3]35.. 31.06].3 1 UT54110 51,]3511 st JX1.020121'RCP,�sslll_ _ LF 659 5 T3.T2 56,591K ]26 4 r3 T2 553,650.16 "b 5 T1.R $2.31.36 1415 S7;R Y13,OSi.W 3 .41.1.2 3�36or C11aeR _ _ _1 260$ 1MW 4312'.. -S 1MW -S 120. .1 41MW 331.II0.W 3 3341.1102 43 Bat Cdaert_ __ LF 321 S 1142 34;019.3 Cm 4 116. 352,9162 IS S 11850 520%. 351 S11e50 12,52. BO ]341.t336v3 DOi Q4reR _ _ 1 t3 S 183.. 52216. -S 2053 -S 2-.. 1m 523.3 5221(0. i 4 3X1,163 JYJ BOt 39.7°8 ____ LF ?%]4 255.3 $562235.3 W. EE64. 33412.110r4Fm CWn1 __ LF -3 3153 3,235 4 3)6.3 S1 Y14,]50. -S 37510 3266 532.5. 11124.].3 87 3349.0101383 dVZMMeRHr EA_ 19 5 33.00 54900.. 0 5 351.. 52,625.3 t s 350.. 5175. 22 53503 $7,12. 08 336.13221'FWetl ikadrzt tpye__ _. EA -S 1,201. 1 S'. .1 $1--m 89 3349,60pi_1PRecessed Mxt - --EA- 1D E 2]1197 $2].11670 4 5 2711.9] 51084789 2$ 2711.97 55.923.9/ 16 52711.9] 16.-. m 336.700+4IXOp,kle! EA 3 5 3117.51 5935253 -5 3,11751 -S 3.11..51 53.117.51 39,3523 3 91 3411.1.03 35M.SgNIHZad Aasmdj FA -3 825.. 7 5 823. SS.PS. ]2 M. 54.)351 19 5021. 511,650.3 4 34N.t0246ec16y_W 13°,15 RS3n18L _EA -5 1170.40 3 S 1,170.6 53,511.N 3$ t.t 30.40 53.511.10 6 31110.6 51,0126 - 3191.1011 Ped 5yrel Head AwrMfj FA -S 6123 ]S 61200 N234. )S 6123 N2611 14 3612. 39.sfi890 96 3491.1-t 2PM POa3r1TN6teS.NY5�1(61G P0k) EA -b 3430 5 5 4543 8 S 6X30 _ $22]1.3 S2.T153 11 N5d]p N991.30 W X41.10422PeRPusD6TN ShIbn W/Sgr(Petl Pok) EA -1 5430 1 $ K430 445430 2 S 3 59613 3 Yr513t1 $1.36390 95 X51.123 Far4elaSeYd Rader Reurce Detect EA -$ 9,135.3 3 5 9,1353 S27,- 4 S 91353 7 11.1- m95TU 3441.1207 FtrrNNrotaO Errc9=YYeFaSeR- 97 Sryttn __ _ _ _. __ ___ _ _LS -5 1.54330 1 S 1.51:1.30 St 54330 1 1 1.5520 41.5630 2 51,5630 33.00680 90 3441.1311 SC 14 AV.0 YtACwbvfor W LF -S 211 237 S 2. 5514. 258 E 21 5518.3 515 322 51.033 3 3411.312] 14AYA YrmCOrimwMrCade - LF -1 3. 310 S 3m S-- 310 S i- 1930.2 6ID S1W 31,850.50 1m X41.131410[19 ANG NreF(:aWdm Cade LF -t 4m 17 S 1. 3309.2 74 $ 1W 33t2W 155 N. 162000 ---- --- - 393 5 5.. 51,9542 399 I 51 $"-. 790 553 339.3 101 X41.1315 RC 14 AY1C N�-COrcMbr GeEk 511 103 3Mi.t4m P.q6 hsLLS4d EF_c COMr___ Lf -S 1.. 67.S 210 S1D,169_N 4,851 5 210 510.191.30 8705 5210 SMJBO.fL 3601.1413 _B MS�H4tl 6xc CO�dr - _LF -3 1.m T]0 S S)/0.. 156 S1.W 315903 161 3M1.1413 NO6 BUe EYC(nMrS_l_D IF_- _1 1.+0 115 s 1.1D 5116`.0 116 5 1.10 S12J.W 231 5110 518410 105 3441.1®14 WS-EhOCCrdr 1 -5 095 419 $ 0.95 5393.05 411 5 095 SMJ,1 39 3095 574/.3 --- - - t6 5)3.19 31265261 i- X41.1502 CUdaW�lSma9,x/Lb Mm- FA -5 790.)9 -8 S 794]9 55,325.32 0 S 7379 26326.32 101 3441.1503 CfoUrtl DOV,Lary x/LWApron FA s 770,16 16 5 110.78 511,945.78 1 $ 770]6 5305.38 16 17]618 31233216 13 3911.600 Iewta8lb-14 P.d PeK EA -E ?0.3 1 s X. 526.. t 5 M3 44. 2 5253 Seaorr t2 3[41.161]Irc1aSType 4l s]vl Pok EA -S 5063 1 S T. 533.3 1 S 53.3 55..3 2 3612 51,00000 110 3441.16191miaX TYFe 435 93331 PCh EA -S 463 2 5 d8- 3 3 600 51443 5 553 516.3 111 34311624 FUm=JUin=_r_vt Alast 4rtn6-48 EA -4 6510 1 E 3521 46?S.N 1 $ 645.16 5695.x1 2 364521 51,3..6 112 3431.t6261rsra0 Mast Prm l6-35 EA -5 618- 2 5 6tflID 415346 3 5 610.10 416543 5 S61flID SJ.-1331 113 1441.1701 N169re1FOOe t. EA -S 1.1- 1 s 1,121.. 511273 1 5 112].3 31,127.3 31.127.% $225590 114 X4117137'359331 FUnde'en _ _ _ -EA -5 8192- i S 6,2422 54142. 1 $ U.W $81421 56,242. 112.512 2 115 3441.1704 TY 459131 FerMaMr EA_ -E J,m2M 2 3 3,120. 1,1616 3 5 3.0022(1 59353 s $3m2ID 515411.1 116 X41.1]22 Furn:=_M1lr�c�co2rc�r6 CataSY GroUtl 1 $ 1.0.. 1 3 Nlfi 510..3 S 10.3 4102.00 -$ 130. 1 51,0003 5203.3 11) 3441.310220NHPSPC Lprorg FOlve - _ s$ 13.-,3 5155,303 171 1943.- 5310,-00 6 1 19.-W Sl16,).90 Ji 3+4502 3802950.3 110 3201 LEDLg6fmg Fi.Ne EA_ -s 3,]3500 3$ 3,135.. 811,215.00 4$ 3,7353 +14930.- T 13113450 fS,144W X41.331]2 Rdny lNm FavuS_an TT 3,5,6,arde FA -3 4723 10$ 1123 54,12600 t b 0723 %1963 23 51723 399213 119 1 120 X41.3]12 Dw¢aC Errbsve,RaB Ya.rc -- EA 1$ Z-.- 35.500.. 1 5 5,-012 -S 5.511 1 3551.- s551.1 121 X41.353 8th®<SOeetl¢dPGa _FA -E ?6bW i S 2424.07 429%07 �E 24M0] 1 524M07 5241481 121 X4+.0001 Fr+reNMtN PEm Sgn WY Mm YOUt EA -S 7011 2$ 514,03.. 3 5 7.-000 S21,W0- 5 373900 S36,W0. iZi 3a1.40m 1-4 A3m6i(1r Nast AOn Yaet V0 ) EA -5 98.. 5 4 23,30.- $115,30.. 5 5 ..- 511520.00 10 {233000 f2-0m- 12d 3491.40.Ir0e3 ASm SyI WSt Arm Yar9(4+8k) EA -4 4393 5 fi $ 6,30.3 s6,eW o0 1 8000,. 544000.. I, 10.0-1- 308.000- 1. 3X9.431 SDT T7pa.2b8v Q6'etk CY S 33,2 139 S 3503 -44433.3 130 3 1.. 121 IS 0.50- 534613 126 X71pW1 T28t Cw4G 110_ -3 23563 9 S 2,355.3 $21,20450 9$ 23%W 32112.3 18 123%`A 542411.3 12) X]t0001 WtaW_ -S M. 39 S 2.253 334375. 39 S T2S.- 329.2]51 -._. Neasage Si,Syn $ - 120 9939.0001 TrvclmrrerEtrd051 e,Pad NOrat EA 1 6,032 SG,000.W SQ- SQOIAW 129 9999_100/BA 9ovC4reR-- -- ---- _ LF -5 16458 16 S 20450 441,1118V 140 S ?0458 19211).84 96 32595S 9 +8413530 W 9999.003 Remora4Ki RDC lF 3 S 25.3 320753 -5 253 -1 Y.- 3 115W 52071.2 131 9999.0009 Remove 3lQRIJC(OrMO� _LF -S 2501 120$ 25.- 53,22401 -S 25.00 139 1253 532253 112 923.00059.Y CanpreYe Pdvel_1'PK _6T 13,12] S ]23 55S6,BYl.3 23,620 S 123- 41,)22092.14 5N1 S 72.09 593610].3 830 5123 0..105.1143 133 9959.00po Ppe Ta{g9rg5kee i6'(3aN Vahe-3b�r1 5 31,556.15 Intact _ 1 S 8,556.15 $427603 1 5 8,55615 NT74- N5s6.11 34556.15 - 1 134 5399.0.)36-NYtr RebraGw3 _ LF -$ 6231 5-3 6231 SIDOT75.79 -$ 6231 0.3 S-W 554,)35]9 135 Y.33.00083kaM-al./Gr¢n4-a! _ lF 110 S >5.- 13,850.- 223 S 31- 57605.00 - S 3100 333 S}i1 51t6%W 136 16'133+Lire RebG0o0wI5bp13eaetl --- 5 1,1.. Riess 1,111 511],30.3 999 4 1 i2.- $1,-s.9m.. 119] 31.112 52195.]-- 13) 919.-1030 s the Lnawngftebca5onw%o 5 tfi1- vmeypass_ 110 S$15,=w 13 551l. .. -1 1500. 111 5153.2 SWOP-.2 139 9999111-z1-Cwrnt�0.-80. F1 10$ 1522 +150.2 6 s 15 W.- +113900 1 s 3731. 1e +15003 +21.31. 9 999900124x3'-6Y7 COra[cl to FOV - -EA_ 1 s 2.30- 5230.1 -5 ;5093 -$ 253.- 5250090 52500.3 13 6 5311.0013 4A'-TACVaecib8ov EA 1 S 230.00 3251% -5 2513 -S 2513 1251- 52500.1 141 asxN EA t S ID,Om.- sElt-1 -4 20,20.. -S 8000_. SID,ma. SID,mOm Na_I _ _ 4 E 13,013 35;'.0.W 3 1 13(11- 33910. -5 13,0001 113,01. 391,011 143 599'3.0016 Ga:t $ .W.. 11 S 257].3 528,353 P� -S 2517.55 52511.55 Etl.351. 149 9599.217 Temp HYAC PSw- SY 1010 S W.. 531,56. 1656 5 303 511,931, 18 S 302 543- 21. $303 553,.0. 145 9'i-liilpt9 Pa4rg-Yec CarrsOrcmrFarre AlsoUd EA 3 23,14313 1 S 23,-0.3 4125,000..' t S 23,[01.1 Siti.0-3 125(10001 523.110.1 tK 9399.-19 13.39-YSCIRY(Farce/mvl___ _EA f 3.000.1 1 4 3,20.1. 315.000.2 1 4 %mom 525.20.- t 551120.. 550.000.2 G SA341ew x .9 0� x Ir q Fj I. u / /,' I III k��'�-- '�•i ' � � - I --� -__-_------ -- -_- I ! co uj = I 5 U I Eq a I � ATTACHMENT C M1JJT*iomAs MJT No. 509-022 August 6, 2012 Northwest Independent School District 1800 SH 114 Justin, TX 76247 Attention: Mr. Mehran Aghili Reference: Proposal for Professional Off-Site Civil Engineering Services Public Infrastructure to Serve the New Northwest ISD High School No. 3 Fort Worth, Texas Dear Mr. Aghili: MJ Thomas Engineering, LLC. (MJT) is pleased to present this proposal for professional civil engineering services for the above-referenced site. It is our understanding that the proposed improvements will consist of new road widening and infrastructure design including public water, sanitary sewer, grading and drainage for East Mascot Boulevard (private road), Willow Springs, Blue Mound and US 287 Frontage Roads around the new Northwest ISD High School No. 3. The design shall be completed to City of Fort Worth and TxDOT standards as determi ned by that entity. MJT will coordinate design a nd construction of the proposed improvements. MJT will also provide design of the off-site sanitary sewer and drainage facilities through the middle school proposed site to the appropriate infrastructure connection point south of the middle school site as determined by the City of Fort Worth. MJT will assist in filing and obtaining TxDOT permits. MJT will coordinate with the affected franchise utility owners and assist with require relocations. MJT will provide a Sediment Control Plan including details as part of our base services. Civil Coordination MJT will provide coordination with the City of Fort Worth and the Client, and TxDOT during the review process through the issuance of a building permit. Plan revisions by the owner after the first submittal to the City will be considered additional services, and will be billed at an agreed upon lump sum fee. It i s assumed that the Architect will handle submittals other than the Civil Package. Civil Contract Administration a. MJT will assist in answering questions and preparation of addenda. b. MJT will make visits to the site to observe the progress of work and attend site meetings as required. C. MJT will provide assistance in processing the Construction Manager's shop drawings and answering questions during construction relating to the site work. Assumptions and Not Included Due to the unknowns involved in th a preparation of this p roposal, we have made the following assumptions. If these assumptions change, we may have t o revise the represented fee. The se assumptions are: 1. On site private plans will be contracted with Corgan Associates. 2. Topographic Survey is included under separate proposal MJT No. 509-022-002. 3400 Hulen Street, Suite 100 P: (817)732-9839 Fort Worth, Texas 76107 F: (817)732-9841 Registration#F-9435 Proposal for Professional Off-Site Civil Engineering Services Public Infrastructure to Serve the New Northwest ISD High School No. 3 Fort Worth,Texas May 22,2012 3. Construction staking will be considered as additional services if required. 4. On-site designs of water, sanitary sewer, grading or draina ge are n of anticipated to be required will be completed under separate contract with Corgan Associates, 5, Changes in the site plan, scope of wo rk, or other items, which result in redesign of the civil drawings may require MJT to adjust our fee s and will be done so in writing prior to proceeding. If these assumptions change, or if any of the below items are required,these services can be performed at an agreed upon lump sum fee or hourly rate.These assumptions are: • Preliminary Platting • Traffic Impact Analysis • Flood Studies • Wetland Studies • Environmental Services — Environmental services are n of included in thi s proposal. If desired,these services can be performed though a sub-consultant. • Soil Investigation/Laboratory Testing: MJT would recommend to the Client that an independent laboratory be retained for use in any testing required during the design phase. Payment for these services should be paid directly by the Owner to the laboratory and should not be handled by MJT. • Retaining wall design, unless it is design build. • Re-design, re-study and/or revisions to recommended directives, conceptual or final studies, drawings, specifications or other documents after same have been previously approved by the owner in order to accomplish changes requested by the Owner. • Assistance as a consultant or expert witness in any discussions or litigation with third parties arising from this project. • Lift Station Design • All other items except as specifically listed. MJT proposes to pe rform all work o utlined base services for a 5% of all co nstruction costs. Reimbursable expenses will be billed as outlined on the accompanying Terms and Conditions(TAC) and billed as an additional item. The TA C document forms a part of this proposal/contract. Reimbursable expenses consist of printing, reproduction, filing fees required by/to the City and delivery charges. M onthly statements for all work will be submitted to you by the 25th of each month, and are due within thirty(30)days. Monthly bills will be based upon the Engineer's estimate of percent completion of the various work tasks.For initial billing we assume the construction costs will be estimated at$15,000,000.00 including City of Fort Worth portion of public works. Pre-Development 20% Construction Plans 63% Bidding 2% Construction Administration 10% City C.Q. 5% Total Compensation 100% Additional services other than those outlined herein will also be accomplished on an hourly rate as listed below. Items identified as additional services will be authorized in writing by the Client and confirmed by MJT via a memorandum and a job initiation form. As a matter of convenience,we will also identify the job number which will bear the exp ease of additional services so all a ccounting can be appropriately identified. We consider design changes required by others than MJT after plans are significantly complete to be additional services. Alterations and modifications required as a normal course of review are considered part of this agreement. MJ Thomas Engineering, LLC. Page 2 of 5 Proposal for Professional Off-Site Civil Engineering Services Public Infrastructure to Serve the New Northwest ISD High School No. 3 Fort Worth,Texas May 22,2012 Items scheduled as Not Included will be provided if requested by the Owner for the Additional Service Hourly Fee Schedule as listed below. Principal Engineer $18 5/hr Project Engineer $12 5/hr Project Manager $10 0/hr Designer/Engineer in Training $90/hr Cad Technician $70/ hr Clerical $45/ hr TERMS & CONDITIONS Engineering and Planning Services Lump surnlfrxed fee contract. The basis of compensation for additional services not included in the fixed fee contract by MJ Thomas Engineering,LLC.'s staff will be calculated by multiplying the employee's hourly rate by 16. Limitation of Liability—To the fullest extent permilt ed by law,and notwithstanding any other provisions of this Agreement,or existence of applicable insurance coverage,the total liability, in the aggregate of MJ Thomas Engine ering, LLC.and MJ Thomas Eng ineering, LLC's officers,directors,employees,agents and Sub-consultants,to the client or,to Client and a nyone claiming by,through or unde r Client,for any and all claims,losses,costs,or damages whatsoever arising out of,resulting from,or in any way related to the services under this Agreement from any cause or causes, including but not limited to the negligence, professional errors or omissions, strict liability or breach of contract,or warranty express or implied of M J Thomas Engineering,LLC,or MJ Thomas Engineer ing, I.I.C.officers,directors,employees, agents and Sub-consultants , shall be as stated under the Northwest lSD Civil Engineering RFQ Na B0809-09-026 underthis Agreement.Higher limits of liability may be negotiated for a higher fee. Under no circumstances shall MJT or its Sub-consultants be liable for lost profits or consequential damages,for extra costs or other consequences due to change or for costs related to the failure of contractors to perform work in accordance with the plans and specifications. No Consequential Damages. N otwithstanding any other provision of the Agreement, neither party shall be liable to th a other for an y consequential damages incurred due to the fa uk of the other party,regardless of the nature of this tau it or whether ri was committed by the Client or MJ Thomas Engineering,LLC.,their employees,agents,or sub-consultants. Consequential damages include,but are not limited to, loss of use and loss of profit. No Duties to Third Parties. The services to be performed by MJ Thomas Eng ineering,LLC.under this Agreement are intended solely for the benefit of the Client. Nothing contained herein shall confer any rights upon or create any duties on the part of MJ Thomas Engineering, LLC.toward any person or persons not a party to this Agreement including,but not limled to any contractor,subcontractor,supplier,or the agents,officers,employees,insurers,or sureties of any of them. Claims Limited to Insurance Coverage. The Client and MJ Thomas Engineering,LLC.waive all rights for damages,each against the other and against the contractors,sub-consultants,agents,and employees of the other,but only to the extent covered by property insurance during or after construction,except such rights as they may have to the proceeds of such insurance. The Client and MJ Thomas Engineering,LLC, each shall require similar waivers from their contractors,sub-consultants,and agents. General Contractor Duties and Responsibilities. Neither the professional activities of MJ Thomas Engineering,LLC.,nor the presence of MJ Thomas Engineering,LLC.ortheir employ ees and sub-consultants at a construct ion site,shall relieve the General Co ntractor and any other entity of their obligations,duties and responsibilities including,but not limited to,construction means,methods,sequence,techniques or procedures necessary for performing,superintending or coordinating all portions of the Work of construction in accordance with the contract documents and any health or safety precautions required by any regulatory agencies. MJ Thomas Engineering, LLC.and their personnel have no authority to exercise any control ov er any construction contractor or other entity or theiremployees in connection with their worst or any health or safety precautions. The Client agrees that the General Contractor is solely responsible for jobsite safety,and warrants that this intent shall be made evident in the Client's agreement with the Ge nerat Contractor. The Client also a grees that the Client,MJ Thomas Engineering,LLC,and their Sub-consultants shall be indemnified and shall be made additional insured under the General Contractor's general liability insurance policy, Termination. This agreement ma y be terminated by either party seven(7)da ys after written notice in the event of an y breach of an y provision of this agreement or in the event of sub stantial failure of performance by the other patty,or if Client suspend s the work for the than three (3) months.in the event of ter mination, MJT will be paid for services performed prior to the date of ter rninalion plus reasonable termination expenses,including,but not limited to the cost of completing analyses,records,and reports necessary to document job status at the time oftermination. Payments and Interest. Client recognizes that prompt payment of MJ Thomas Engineering,LLC.'s invoices is an essential aspect of the overall consideration MJ Thomas Engineering,LLC.requires for providing service to Client. Client will pay MJ Thomas Engineering,LLC.in MJ Thomas Engineering, LLC. Page 3 of 5 Proposal for Professional Off-Site Civil Engineering Services Public Infrastructure to Serve the New Northwest ISD High School No. 3 Fort Worth,Texas May 22,2012 accordance with the procedures i ndicated in the proposal and it s attachments. Invo ices will be sub mitted to CI ient by MJ Thoma s Engineering,LLC„and will be due and payable upon presentation. if Client objects to all or any portion of any invoice,Client will so notify MJ Thomas Engineering,I.I.C.in writing within fourteen(14)calendar days of the invoice date,identify the cause of disagreement,and pay when due that portion of the invoice not in dispute. In absence of written notification described above,the amount as stated on the invoice will be paid. Invoices are delinquent if payment has no t been r eceived within thirty (30)da ys from date of invoice. At the opt ion of MJ Tho mas Engineering, LLC., Client will pay an additional charge of one-and-one-half(1.5)percent per month(or th a maximum percentage by law. whichever is lower)on any delinquent amount,except for any portion of the invoiced amount in dispute and resolved in favor of Client. Disputed amounts withheld by the Client which are subsequently resolved in favor of MJ Thomas Engineering,LLC.will carry the additional charge, as described above,effect ive thirty(30)days from the dat a of the original invoice. In the event Client fa its to pay MJ Thomas Engineering,LLC,within ninety(90)days after invoices are rendered,Client agrees that MJ Thomas Engineering,LLC.will have the right to consider the failure to pay MJ Thomas Engineering,LLC.'s invoice as a breach of this agreement. Cessation of Services. if Client for any reason fails to pay the undisputed portion of MJ Thomas Engineering,LLC.'s invoices within 30 days of invoice date,MJ Thomas Engineering,LLC,has the right to cease work on the project and Client shall waive any claim against MJ Thomas Engineering,LLC.for cessation of services,and shall defend and indemnify W Thomas Engineering,LLC,from and against any claims for injury or loss stemming from MJ Thomas Engineering,LLC.'s cessation of service. Client shall also pay MJ Thomas Engineering,LLC.the cost associated with premature cessat ion of services. In the event the project is re stated, Client shall also pay the cost of, and shall renegotiate appropriate contract terms and conditions,such as those associated with budget,schedule o r scope of service. Both the client and MJT may cancel this contract within seven(7)days for written notice, Certifications:Guarantees and Warranties: MJ Thomas Engineering,LLC.shall not be required to execute any document that would result in its certifying,guaranteeing or warranting the existence of conditions whose existence MJ Thomas Engineering,LLC.cannot ascertain. Proposal Time Limit:This proposal shall be considered valid for a period 60 days from the date signed by MJT.After this time,MJT reserves the right void this contract if not signed and returned by the client prior to this time frame. Legal Action. In the event legal action is necessary to enforce the payment terms of this Agreement,MJ Thomas Engineering,LLC.shall be entitled to collect from the Client a rry judgment or settlement sums due,plus reasonable attorney's fees,court costs and other expenses incurred by MJ Thomas Engineering,LLC.in connection therew ith and,in addition,the reasonable va lue of MJ Thomas En gineering,LLC. time and ex penses spent in Conn ection with such collection action,commuted according to MJ Thoma s Engineering,LLC, prevailing fee schedule and expense polbes. Dispute Resolution and Termination. In the event any bill or portion thereof is disputed by Client,Client strait notify MJ Thomas Engineering,LLC.within 10 days of receipt of the bill in question,and Client and MJ Thomas Engineering,LLC,shall work together to resolve the matterwithin 60 days of its being called to MJ Thomas Engineering,LLC.attention. If resolution of the matter is not attained within 60 days,either party may terminate this Agreement in accordance with conditions indicated in the termination of agreement clause specified. Mediation. In an effort to resolve a ny conflicts that arise during ft design and construction of the Project or follow Ing the completion of the Project,the Client and MJ Thomas Engineering,LLC.agree that all disputes between them arising out of or relating to this Agreement orthe Project shall be submitted to nonbinding mediation unless the parties mutually agree otherwise. The Client and M J Thomas Eng ineering, LLC,furthe r agree to in elude a sim ilar mediation provision in all agreements w ith independent contractors and sub-consultants ret ained for the Project and to require all independen t contractors and sub-consultants also to include a similar mediation provision in all agreements with their subcontractors, sub-consultants, suppliers and fabricators, thereby providing for mediation as the primary method for dispute resolution between the parties to all those agreements. Other charges which may apply to the Client's project include: (1) Printing and reproduction shall be billed at standard commercial rates. (2) All direct non-labor expense,including bid advertising,etc.,and travel and subsistence for the principals and staff when outside of Tarrant and Dallas counties as required for the proper execution of the work,are charged at actual invoice cost. Filing fees paid by MJ Thomas Engineering,LLC,will be charged at cost plus 2%. Travel by passenger vehicles shall be at a rate commensurate with IRS regulations. (3) Services not offered as a part of M J Thomas Engineering,LLC.normal services such as special consultants and surveyors,the Client may,at his option,contract directly with the third party for such services or through MJ Thomas Engineering,LLC. If such contracts are ma do through MJ T homas Engineering, LLC.a se rvice charge of 10% will be added to t he net amount of such contracts. Miscellaneous: (1) intellectual Property. The drawings,specifications and any other v A products(including but not limited to software programs and electronic media of any description)prepared by MJ Thomas Engineering,LLC.for this project shall remain the propert y of MJ Thomas Engineering, LLC.and MJ Thomas E ngineering, LLC.shall retain all common law,statutory and other reserved rights, including the copyright,where applicable. NISD retains all rights to paid materials and publications, designs for future use o r sharing the data with other developers and government entities.it is stated in page 12,section 10. MJ Thomas Engineering, LLC. Page 4 of 5 Proposal for Professional Off-Site Civil Engineering Services Public Infrastructure to Serve the New Northwest ISD High School No. 3 Fort Worth, Texas May 22, 2012 (2) Entire Agreement. This agreement is the entire agreement between the parties with respect to the subject matter of this agreement and shall be binding upon and inure to the benefit of the parties hereto and their respective legal representatives.heirs,successors and assigns. (3) Counterparts. This agreement shall be executed with one or more separate counterparts,each of which,when so executed,shall, together,constitute and be one in the same instrument. (4) Governing Law and Venue. This agreement shall be governed by and construed in accordance with the substantive laws of the Stale of Texas and the parties hereto agree and consent that venue for all purposes shall be in Tarrant County,Texas. (5) Project Information: The Client shall furnish, at the Client's expense, all information, requirements, reports, data, surveys and instructions required by this Agreement The Consultant may use such information, requirements, reports, data, surveys and instructions in performing its services and is entitled to rely upon the accuracy and completeness thereof. (6) Hazardous Materials:As used in this Agreement, the term hazardous materials shall mean any substances, including but not limited to asbestos, toxic or hazardous waste, PCB's, combustible gases and materials,petroleum or radioactive materials(as each of these is defined in applicable federal statutes)or any other substances under any conditions and to such quantities as would pose a substantial danger to personal or property exposed to such substances at or near the Project site Both parties acknowledge that the consultant's scope of services does not include any services related to the presence of any hazardous or toxic materials, In the event(he Consultant or any other party encounters any hazardous or toxic materials,or should it become known to the Consultant(hat such materials may be present on or about the jobsile or any adjacent areas that may affect the performance of the Consultant's services,the Consultant may, at its option and without liability for consequential or any other damages,suspend performance of is services under this Agreement until the Client retains appropriate consultants of contractors to identify and abate or remove the hazardous or toxic materials and warrants that the jobsite is in full compliance with all applicable laws and regulations We appreciate your consideration of MJ Thomas Engineering, LLC. and we share your enthusiasm for this project. If this proposal meets with your approval, please indicate by signing in the space provided, and return one copy as our Notice to Proceed. Please feel free to call if you have any questions concerning any of the scope of services or associated fees presented herein and we will do our best to clarify any part of the proposal that may be unclear. We appreciate the opportunity to assist you with this project and look forward to its success_ NORI ST INO E-0&DSCIJOOL DISTRICT MJ THOMAS CNIZIN51719ING,LLC CLIE BBy Mirh ard A .m.._ P f , h Kaa rJL Principal Position Position cl-A�tC>/12_ August 6.2012 Date Date MAT/as 509-022_Prop Civit_MAghih_12-0806_AS MJ Thomas Engineering, LLC. Page 5 of 5 City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 9/23/2014 —Ordinance Nos.21483-09-2014 & 21484-09-2014 &21485-09-2014 DATE: Tuesday, September 23,2014 REFERENCE NO.: C-27011 LOG NAME: 201LA NISD BLUE MOUND RD &WILLOW SPRINGS RD SUBJECT: Authorize Execution of an Interlocal Agreement with the Northwest Independent School District in the Amount of$545,463.98 for the Engineering Plans for the Construction of Blue Mound Road and Willow Springs Road and Adopt Appropriation Ordinances (COUNCIL DISTRICT 7) RECOMMENDATION: It is recommended that the City Council: 1. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Transportation Impact fund in the amount of$262,633.61 from available funds; 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Special Assessments fund in the amount of$282,830.37 from available funds; 3. Authorize transfer of$282,830.37 from the Special Assessments fund to the TPW Community Facilities Agreement fund; 4. Adopt the attached appropriation ordinance increasing the estimated receipts and appropriations in the TPW Community Facilities Agreement fund in the amount of$282,830.37 from available funds; and 5. Authorize execution of an Interlocal Agreement with the Northwest Independent School District in the amount of$545,463.98 for reimbursement for the design of four lanes of Blue Mound Road from US 287 to Willow Springs Road and four lanes of Willow Springs Road from Blue Mound Road to Mesa Crest Drive. DISCUSSION: In accordance with the Community Facilities Agreement required for the improvements to the roadways associated with the construction of a new high school located on Willow Springs Road,Northwest Independent School District(NISD)engaged MJ Thomas Engineering,LLC to provide construction drawings. In addition to Willow Springs Road, it was determined that improvements to Blue Mound Road are needed to serve the new high school and the proposed middle school. The City initiated discussions concerning the joint funding of these projects with the NISD. Though Blue Mound Road does not adjoin the NISD tract,in August 2012,NISD presented a draft Interlocal Agreement offering to design and construct Willow Springs Road and Blue Mound Road with the understanding that the City would reimburse the District when funds became available. Anticipating such an Agreement, the City proposed reimbursement to NISD for the design of Blue Mound Road and the City's portion of Willow Springs Road with Transportation Impact funds not to exceed $650,000.00. In September 2012,NISD entered into a contract with MJ Thomas Engineering for the design of Blue Mound and Willow Springs roads. Because of the uncertainty of construction funds,it was determined that NISD would not construct the roads, but would: 1)provide final engineering plans for Willow Springs and Blue Mound roads and 2)enter into an Interlocal Agreement to be reimbursed for the engineering plans and to obligate payment of its portion of the construction of Willow Springs Road. NISD has continued with the engineering design of the projects while each party's financial obligations were being finalized.Based on accepted engineer's estimates,this Interlocal Agreement establishes that the City will reimburse NISD an amount not to exceed$394,576.47 for the engineering plans for Willow Springs Road and$150,887.21 for the engineering plans for Blue Mound Road. It is recommended that funding for this reimbursement be programmed using Transportation Impact Fees in Service Area B and Future Development Funds. Funding for the construction of Blue Mound Road was approved with the 2014 Bond Program. This project is located in COUNCIL DISTRICT 7. FISCAL INFORMATION: The Financial Management Services Director certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinances,funds will be available in the capital budget, as appropriated, of the Special Assessments Fund, the TPW Community Facilities Agreements Fund, and the Transportation Impact Fund. FUND CENTERS: TO Fund/Account/Centers FROM Fund/Account/Centers 1)C206 488139 061249991200 $262.633.61 3) GS94 538040 020941369010 $282.830.37 1) C206 541200 061249991200 $262.633.61 5) C206 541200 207240216183 $262.633.61 2)GS94 488100 020941369010 $282.830.37 5)C205 541200 207760216183 $282.830.37 2) GS94 538040 020941369010 $282.830.37 3&4)C205 476094 207760216183 $282.830.37 4)C205 541200 207760216183 $282.830.37 CERTIFICATIONS: Submitted for City Manager's Office by: Fernando Costa (6122) Originating Department Head: Douglas W.Wiersig (7801) Additional Information Contact: Jim Walker (8009) ATTACHMENTS 1.201LA NISD BLUE MOUND RD&WILLOW SPRINGS RD C205 AO14 REVISED.doc 2. 20ILA NISD BLUE MOUND RD &WILLOW SPRINGS RD GS94 AO14 REVISED.doc 3. 201LA NISD BLUE MOUND RD—WILLOW SPRINGS RD C206 AO 14 REVISED(Rev9.11.14,).doe 4. Funds Blue Mound Rd Willow Springs Rd Impact Fees.pdf 5. GS94 5zzzzz 136901.doc 6. Man NISD Blue Mound—Williow Springs .pdf 7. NISD C206 FAR-00001.12df �•1il_ a n � IG LEI �1 V • � >�• mar t on MWMM ��,! � ����� � �I f.� �� ��C �J,�■�'�_- -_.inn• r �ia11 �fJ�d�A ��� ►�� +1��r' _���`LZ`.�I�GII���•�1��Ili�l y�-f Al".. �EAGL tBL'iin MESXCROSSING DRR' iCREST•MEADOWODR Mn MIA r�� ������►,��'f��,� 1' MP AlFLATS+DRS CRES;T.BREE_ZEDR , pill .uiL\�11�rrr���_'A►�� iZ�'iir 1�� • �1 e — Ordinance No. 21483-09-2014 AN ORDINANCE INCREASING THE ESTIMATED RECEIPTS AND APPROPRIATIONS IN THE TPW COMMUNITY FACILITIES AGREEMENT FUND IN THE AMOUNT OF $282,830.37, FROM AVAILABLE FUNDS, FOR REIMBURSEMENT TO NORTHWEST INDEPENDENT SCHOOL DISTRICT FOR ENGINEERING PLANS TO WIDEN BLUE MOUND ROAD FROM US 287 TO WILLOW SPRINGS ROAD AND WILLOW SPRINGS ROAD FROM BLUE MOUND ROAD TO MESA CREST DRIVE; PROVIDING FOR A SEVERABILITY CLAUSE; MAKING THIS ORDINANCE CUMULATIVE OF PRIOR ORDINANCES; REPEALING ALL ORDINANCES IN CONFLICT HEREWITH; AND PROVIDING AN EFFECTIVE DATE. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS: SECTION 1. That in addition to those amounts allocated to the various City departments for Fiscal Year 2013-2014 in the Budget of the City Manager, there shall also be increased estimated receipts and appropriations in the TPW Community Facilities Agreement in the amount of$282,830.37, from available funds, for reimbursement to Northwest Independent School District for engineering plans to widen Blue Mound Road from US 287 to Willow Springs Road and Willow Springs Road from Blue Mound Road to Mesa Crest Drive, SECTION 2. That should any portion, section or part of a section of this ordinance be declared invalid, inoperative or void for any reason by a court of competent jurisdiction, such decision, opinion or judgment shall in no way impair the remaining portions, sections, or parts of sections of this ordinance, which said remaining provisions shall be and remain in full force and effect. SECTION 3. That this ordinance shall be cumulative of Ordinance No. 20952-09-2013 and all other ordinances and appropriations amending the same except in those instances where the provisions of this ordinance are in direct conflict with such other ordinances and appropriations, in which instance said conflicting provisions of said prior ordinances and appropriations are hereby expressly repealed. SECTION 4, This ordinance shall take effect upon adoption. APPROVED AS TO FORM AND LEGALITY: CITY SECRETAR y R tc�f Assistant City Attorney Mary J. KaNsb if ADOPTED AND EFFECTIVE: September 23, 2014 ~ ` Ordinance No. 21484-09-20]4- AN ORDINANCE INCREASING THE ESTIMATED RECEIPTS AND APPROPRIATIONS D4 THE SPECIAL ASSESSMENTS FUND Oq THE AMOUNT 0F $282'830.37' FROM /\\/A/L/\Bl.G FUNDS, FOR REIMBURSEMENT TO NORTHWEST INDEPENDENT SCHOOLD0TRlCT FOR ENGINEERING PLANS TO WIDEN BLUE MOUNT) ROAD FROM US 287 TO WILLOW SPRINGS ROAD AND WILLOW SPKIIN(}8 ROAD FROM BLUE K4UUND ROAD TO MESA CREST DRIVE; PROVIDING FOR f\ S5V6R/\BD.lTY CLAUSE; MAKING THIS ORDINANCE CUMULATIVE OF PRIOR ORDINANCES; REPEALING ALL ORDINANCES IN CONFLICT HEREWITH; AND PROVIDING AN EFFECTIVE DATE. BE[[[)KD/\INEDBYTDB CITY C0(/NCDLOF THE CITY OF FORT WORTH. TEXAS: SFCT|ON |. That in addition to those amounts allocated to the various City departments for Fiscal Year 2013-2014 in the Budget of the City Manager, dzome uhd| also be increased estimated /ccoip|a and appropriations in the Special /\oueeumcnix Fund in the amount of $282`830]7' from uvai|uh)u funds, for reimbursement 10 Northwest Independent School District for engineering plans to widen Blue Mound @uud from US 287 to Willow Springs Road and Willow Springs Road from Blue Mound Road 10 Mesa Crest Drive. SECTION 2. That should any portion, section or pail ofusection of this ordinance he dco|mrd invalid, inoperative or void for any reason by a court of corn pe tentj t irisd icti on, such decision, opinion orjudgment shall in no way impair the remaining portions, yoo(iuoa, or parts of sections of this ordinance, vvh(uh said remaining provisions shall ho and remain iofuU force and effect. SECTION 3. That this ordinance oku|\ be cumulative of Ordinance No. 20452-09-2013 and all other ordinances and appropriations amending the uuue cxoop1 in those ina(xno*u vvbero the provisions of this ordinance are in direct conflict with such other ordinances and uppouphu|ioos, in which instance said conflicting provisions of said prior ordinances and appropriations are hereby expressly repealed, SECTION 4. This ordinance shall take effect upon adoption, APPROVED AS T0 FORM AND LEGALITY: CITY RG R ------ KrJ-y J"A --T�' Assistan'rrit-y Attorney ADOPTED AND ELFyECTK/2: ScAle»bur 23, 2014 Ordinance No. 21485-09-2014 AN ORDINANCE INCREASING THE ESTIMATED RECEIPTS AND APPROPRIATIONS IN THE TRANSPORTATION IMPACT FUND IN THE AMOUNT OF $262,633.61, FROM AVAILABLE FUNDS, FOR REIMBURSEMENT TO NORTHWEST INDEPENDENT SCHOOL DISTRICT FOR ENGINEERING PLANS TO WIDEN BLUE MOUND ROAD FROM US 287 TO WILLOW SPRINGS ROAD AND WILLOW SPRINGS ROAD FROM BLUE MOUND ROAD TO MESA CREST DRIVE; PROVIDING FOR A SEVERABILITY CLAUSE; MAKING THIS ORDINANCE CUMULATIVE OF PRIOR ORDINANCES; REPEALING ALL ORDINANCES IN CONFLICT HEREWITH; AND PROVIDING AN EFFECTIVE DATE. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS: SECTION 1. That in addition to those amounts allocated to the various City departments for Fiscal Year 2013-2014 in the Budget of the City Manager, there shall also be increased estimated receipts and appropriations in the Transportation Impact Fund in the amount of $262,633.61, from available finds, for reimbursement to Northwest Independent School District for engineering plans to widen Blue Mound Road from US 287 to Willow Springs Road and Willow Springs Road from Blue Mound Road to Mesa Crest Drive. SECTION 2. That should any portion, section or part of a section of this ordinance be declared invalid, inoperative or void for any reason by a court of competent jurisdiction, such decision, opinion or judgment shall in no way impair the remaining portions, sections, or parts of sections of this ordinance, which said remaining provisions shall be and remain in full force and effect. SECTION 3. That this ordinance shall be cumulative of Ordinance No. 20952-09-2013 and all other ordinances and appropriations amending the same except in those instances where the provisions of this ordinance are in direct conflict with such other ordinances and appropriations, in which instance said conflicting provisions of said prior ordinances and appropriations are hereby expressly repealed. SECTION 4. This ordinance shall take effect upon adoption. APPROVED AS TO FORM AND LEGALITY: CITY SECRE. fY ; Assistant City Attorney N any r ADOPTED AND EFFECTIVE: September 23,2014