Loading...
HomeMy WebLinkAboutResolution 4364-09-2014 A Resolution NO. 4364-09-2014 AUTHORIZING EXECUTION OF AN ADVANCE FUNDING AGREEMENT WITH THE TEXAS DEPARTMENT OF TRANSPORTATION FOR THE REPLACEMENT OF THE SOUTH BLUE MOUND ROAD BRIDGE AND PROPOSING WAIVER OF THE CITY'S LOCAL MATCH TO BE REDIRECTED TO THE REHABILITATION BY THE CITY OF THE EAST 4TH STREET BRIDGE WHEREAS, the federal off-system bridge program is administered by the Texas Department of Transportation (the "State") to replace or rehabilitate structurally deficient and functionally obsolete (collectively referred to as "deficient") bridges located on public roads and streets off the designated state highway system; and WHEREAS, the City of Fort Worth, (the "Local Government") owns a bridge located at Elizabeth Creek on South Blue Mound Road, National Bridge Inventory (NBI) Structure Number 18- 061 Z00040-001; and WHEREAS, projects to remedy the South Blue Mound Road Bridge are included in the currently approved program of projects as authorized by Texas Transportation Commission Minute Order 113967 dated June 26, 2014 for Control-Section-Job (CSJ)Numbers 0918-46-274; and WHEREAS, the usual fund participation ratio for projects on such programs is 80 percent federal, 10 percent state and 10 percent local government; and WHEREAS, Texas Administrative Code, Title 43, Section 15.55(d) (43 TAC Section 15.55(d)) provides that under specified conditions the 10 percent Local Government match fund participation requirement may be waived with agreement by the local government to perform, or cause to be performed, an equivalent dollar amount of structural improvement work on other deficient bridges or deficient main lane cross-drainage structures within its jurisdiction, such a project of structural improvement work being referred to as an"equivalent-match project"; and WHEREAS, the estimated local match fund participation requirement on the approved South Blue Mound Road Bridge project is $117,872.00 (the"participation-waived amount"); and WHEREAS, the Local Government proposes to waive its participation requirement for the South Blue Mound Road Bridge project and in return perform or cause to be performed equivalent-match project structural improvement work using the participation-waived amount. � k ORT WORT HU Resolution No.4364-09-2014 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS: That the City of Fort Worth shall perform, or cause to be performed, the following equivalent- match project in return for waiver of the local match fund participation requirement on the approved federal off-system bridge program (participation-waived)project not yet awarded: LOCATION (and NBI ON SCHOOL DESCRIPTION OF ESTIMATED COST identification number,if BUS ROUTE? STRUCTURAL applicable) IMPROVEMENT WORK East 4t Street at Trinity Yes Strengthen the steel $117,872.00 River girders on the bridge (NBI: 02-220ZZ6250-004) to increase load capacity BE IT FURTHER RESOLVED that in receiving this waiver the Local Government acknowledges its obligation to conform with all conditions of 43 TAC Section 15.55(d); such conditions that include but are not restricted to the following: 1. The Local Government must be currently in compliance with load posting and closure regulations as defined in National Bridge Inspection Standards under US Code of Federal Regulations, Title 23, Section 650.303. 2. The equivalent-match project work increases the load capacity of the existing bridge or other mainlane cross-drainage structure, or upgrades the structure to its original load capacity with a minimum upgrade to safely carry school bus loading if located on a school bus route. 3. In performing, or causing to be performed, the equivalent-match project(s), the Local Government assumes all responsibilities for engineering and construction, and complying with all applicable state and federal environmental regulations and permitting requirements for the structure(s) being improved. 4. The work on the proposed equivalent-match project(s) has not begun and will not begin until the local match fund participation waiver approval process has been completed. 5. The Local Government will be allowed three years after the contract award of the participation-waived project to complete the structural improvement work on the equivalent-match proj ect(s). Should this waiver request be approved, an appropriate written agreement or amendment to a previously executed agreement will be executed between the State and City of Fort Worth. Adopted this 23rd day of Se mber, 2014. -- — -- — — c o��0 000 o ATTEST o 0 °®o �•"C By' o --- -- ---- °o o Mary J. K °°000000000 *cy° a L__r t1X04'04� ORT WORT ( � 1' �;rA • � .Ark--�t �� � l � __ �_� a,ILI I Inv m win - lL�� 14 E MOUND III r Ila i PROJECT LOCATION MAP2 0 AKERS w P W D J z GP 0��p F�Vp AMO T s z P Q pz = z O o GR PEW O V Ln -X NOBLE OBL NOB g z ¢ PAR w Y r D PI TS UR ❑ It _ O Z fr \t 4 al, 'li0 �A ❑ CONWAY RVE �`� � Q�P�R W Q z NIES W z0 NIES a u O BROWN JO Ng,�;, O P OUS q r m c> w ? w w 1ST 1ST z m GOUNAH Q�R 9 m CH AU Q Q CHENAULT N CQi 15 r U u) p z w RLU tit = W 4 H w 4TH W o P QQ JFF Oti' O NO z ❑ AL Z > V G LVEZ m y ! I g a m w w LAWNWOOD Uj Bridge No: 02220ZZ6250004 NNI y�P E. 4th Sreet Bridge at Trinity River k SALLE m 12TH 12TH a) FINLEY FINLE 9! a GF 9 VANHORN VA NH RN n GIPSON B OK w a m 0 yo I 'fa o y a cn L LA �a z \ m p \ 1 TH 9( l `� " z 'i',A /� Ai 14 m 3 0 W EAST y i,; ro a SERRE BUS/� XA W u) 1A \ `• k W 1 TH 13 O z 3 b\ �`� SG TT r NCA ER O ee Q MAR ❑ a w � 47 p PRE IDIO City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 9/23/2014 - Resolution No. 4364-09-2014 DATE: Tuesday, September 23, 2014 REFERENCE NO.: C-27010 LOG NAME: 20AFA SOUTH BLUE MOUND ROAD BRIDGE SUBJECT: Adopt Resolution Authorizing Execution of an Advance Funding Agreement with the Texas Department of Transportation in the Amount of$1,178,720.00 for the Reconstruction of the South Blue Mound Road Bridge and Proposing Waiver of the Required City Participation of$117,872.00 to be Redirected for Rehabilitation of East 4th Street Bridge Over the Trinity River (COUNCIL DISTRICTS 7 and 8) RECOMMENDATION: It is recommended that City Council adopt the attached resolution authorizing execution of an Advance Funding Agreement with the Texas Department of Transportation for the construction of a new bridge to replace South Blue Mound Road Bridge over Elizabeth Creek in the amount of$1,178,720.00 and proposing waiver of the the required City participation of$117,872.00 to be redirected for the rehabilitation of the East 4th Street Bridge over the Trinity River. DISCUSSION: The existing South Blue Mound Road Bridge (Bridge No. 18-061-Z000-40-001) over Elizabeth Creek was built in 1921. Texas Department of Transportation's (TxDOT) structural evaluation for the bridge determined that the bridge is structurally deficient and must be replaced. This Agreement will provide funding for the construction of a new South Blue Mound Road Bridge to replace the existing deficient bridge and approach roadways. The estimated cost for the new bridge is $1,178,720.00. The City's cost share is 10 percent of the estimated total cost ($117,872.00). Under the Equivalent-Match program initiated by the State (Texas Administrative Code, Title 43, Section 15.55(d)), no direct payment by the City is required if the Local Government agrees to perform structural improvements in at least an equal dollar amount to other deficient bridge(s) or cross-drainage structure(s) within its jurisdiction. For this project, the City agrees to perform structural improvement in the minimum amount of$117, 872.00 for the following load-restricted bridge. East 4th Street Bridge over Trinity River (Bridge No. 02-220-ZZ62-50-004). The estimated cost for the rehabilitation of East 4th Street Bridge is $120,000.00. This project can be funded from 2014 Bond Program in FY 2017 - Bridges funds in the amount of$10 million that were dedicated for the reconstruction and rehabilitation of deficient bridge structures. The City agrees to complete this minor project within three years of the contract being let by the Texas Department of Transportation for South Blue Mound Road Bridge project. Under the terms of the funding Agreement, the City is responsible for 10 percent offset of the cost of eligible work, plus 100 percent of costs that are deemed ineligible by TxDOT, including right-of-way acquisition, utility relocation, environmental mitigation and any non-standard construction. Logname: 20AFA SOUTH BLUE MOUND ROAD BRIDGE Page 1 of 2 These projects are located in COUNCIL DISTRICTS 7 and 8. FISCAL INFORMATION / CERTIFICATION: The Financial Management Services Director certifies that this action will have no material effect on City funds at this time. FUND CENTERS: TO Fund/Account/Centers FROM Fund/Account/Centers CERTIFICATIONS: Submitted for City Manager's Office by: Fernando Costa (6122) Originating_Department Head: Douglas W. Wiersig (7801) Additional Information Contact: Juan Cadena (7914) Logname: 20AFA SOUTH BLUE MOUND ROAD BRIDGE Page 2 of 2