HomeMy WebLinkAboutContract 45091-A1 CITY SECRETARY
CONTRACT NO.
FIRST AMENDMENT TO CITY SECRETARY
CONTRACT NO. 45091
WHEREAS, on October 31,2013,the City of Fort Worth("City") and G.A. Miller
Enterprise Inc. d/b/a Glenn's Air Conditioning and Heating, a Corporation authorized to do
business in the State of Texas ("Contractor)made and entered into City Secretary Contract No.
45091 (the"Contract) for construction services for the City's Priority Repair Program.
WHEREAS,the Priority Repair Program provides up to $5,000.00 for home repairs for
eligible City homeowners for Priority 1 emergency repairs and Priority 2 repairs of failed
household mechanical systems to address health and safety issues as more particularly defined
by the program.
WHEREAS, the Contract was for a 1 year term beginning on the Effective Date and
provided for 4 additional 1 year terms;
WHEREAS, the Parties have agreed to extend the Contract for an additional 1 year term
beginning November 1, 2014 through October 31, 2015; and,
WHEREAS, it is the mutual desire of City and Contractor to amend the Contract to meet
Contract objectives.
NOW, THEREFORE, City and Contractor hereby agree to amend the Contract as
follows:
I.
ARTICLE 1. DEFINITIONS is amended by adding the following definitions:
"Effective Date" means November 1, 2014.
"Priority Repair Program" or"program"means the City's home repair program for
eligible low to moderate income homeowners adopted by the City Council in M&C G-
17589.
ARTICLE 2. SCOPE OF SERVICES Section A. is amended to be and read as follows
rrl
by adding the following as the first sentence.
C-)
rri
c "A. The purpose of this Contract is to provide home repair services for the Priority
v Repair Program. The services provided shall be either Priority 1 emergency
o repairs or Priority 2 repairs of failed household mechanical systems to address
health and safety issues as determined by City, ' accordance with program
` guidelines.
1 FFICIAL RECORD
CITY SECRETARY
FT. WORTH,TX
FIRST CONTRACT AMENDMENT CSC NO.45091 /2014
Priority Repair Program Page 1
G.A.Miller Enterprise Inc.d/b/a Glenn's Air Conditioning and Heating,a Corporation
The first sentence of ARTICLE 5. TERM OF CONTRACT is amended to be and
read as follows:
"This Contract shall commence as of the Effective Date and shall automatically expire
upon the earlier of the expenditure of$300,000.00 or October 31, 2015 (the "Expiration
Date"), if not terminated sooner or extended as described below."
II.
Attachment C attached to the Contract is deleted and replaced with the attached
Attachment C Revised 10/2014.
III.
All other terms and conditions of City Secretary Contract No. 45091 not amended herein
remain unaffected and in full force and effect, are binding upon the Parties, and are hereby
ratified by the Parties. Capitalized terms not defined herein shall have meanings assigned to
them in the Contract.
[REMAINDER OF PAGE LEFT INTENTIONALLY BLANK]
FIRST CONTRACT AMENDMENT CSC NO.45091 Rev. 10/2014
Priority Repair Program Page 2
G.A.Miller Enterprise Inc.d/b/a Glenn's Air Conditioning and Heating,a Corporation
o FO
B
Dip eO°OOO �► 4;
ACCEPTED AND AGREED a
0 0
0 0
ATTEST: � �5 oo FORT WORTH
City Secret Fernando Costa,Assistant City Manager
M&C C-26 0 10/15/2013
APPROVED AS TO FORMA D LEGALITY"
C�
/1,5��A�
Vicki S. Ganske, Senior Assistant City Attorney
CONTRA,CT
B � !
Gle iller, Owner& CEO
OFFICIAL RECORD
CITY SECRETARY
FT.'WORTIH,TX
FIRST CONTRACT AMENDMENT CSC NO.45091 Rev. 10/2014
Priority Repair Program Page 3
G.A.Miller Enterprise Inc.d/b/a Glenn's Air Conditioning and Heating,a Corporation
ATTACHMENT C Revised 11/2014
FORTWORTH
'**,o
CITY OF FORT WORTH
DEPARTMENT OF HOUSING AND ECONOMIC DEVELOPMENT DEPARTMENT
1000 THROCKMORTON
FORT WORTH TEXAS 76102
PRIORITY REPAIR PROGRAM
FIRST CONTRACT AMENDMENT CSC NO. 45091
G.A. Miller Enterprise Inc. d/b/a Glenn's Air Conditioning and Heating
ITEMIZED BID TABS:
HEATING VENTILATION AND AIR CONDITIONING (HVAC)--GENERAL REQUIREMENTS:
Equipment shall operate safely without leakage, noise, or vibration. All penetration of building
components shall be neat, sleeved and fire stopped and shall not compromise structural
integrity. Contractor shall submit a diagram, and must use the Air Conditioning Contractors of
America (ACCA) Manual J Heat loss calculation tool http://www.acca.org/tech/manualj/), and
use ACCA's Manual S for equipment selection. Size of furnace selected should be matched to
the living unit considering any areas which may be added or subtracted from the plan plus
meet the current Energy Code requirements adopted by the City to efficiently heat the
structure.
1. HOURLY RATE FOR LABOR COST HVAC: Service and related work: Services will be
provided Monday through Friday between 7:00 am and 5:30 pm. Rate shall include trip
charge, travel time, mileage, transportation cost, parking and toll fees. Rate shall start
upon
$80.00\Hourly Rate for Labor Cost
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.45091
Priority Repair Program G.A.Miller Enterprise Inc. d/b/a Glenn's Air Conditioning and Heating Rev.
10/2014
CENTRAL GAS FURNACE:–Complete install–Efficiency or higher configuration types: Up-flow,
Down-flow and Horizontal. Central Heat/Furnace all installations shall be code compliant, a
mechanical permit is required. Installation cost shall include all labor, material and supplies
required to install new unit in accordance with manufacturer requirements, removal of existing
unit and properly disposal in accordance with EPA regulation. Installation shall also include,
vent flue-complete with outside roof iack and flashing, new gas valve if applicable,gas lines
and shut off valve, if applicable, duct modification if needed. Unit shall be properly vented,
insulated and/or sealed in accordance to local code requirements (including high low vents).
2. FURNACES—GAS 36,000 BTU:
$491.00/materials each +$995.00 installed/labor each = $1,486.00/total
3. FURNACES—GAS 42,000 BTU:
$497.00/materials each + $995.00 installed/labor each = $1,492.00/total
4. FURNACES—GAS 50,000 BTU:
$460.00/materials each +$995.00 installed/labor each = $1,455.00/total
5. FURNACES—GAS 70,000 BTU:
$492.00/materials each + $995.00 installed/labor each = $1,487.00/total
6. FURNACES—GAS 75,000 BTU:
$502.00/materials each + $995.00 installed/labor each = $1,497.00/total
7. FURNACES—GAS 80,000 BTU:
$504.00/materials each + $995.00 installed/labor each = $1,499.00/total
8. FURNACES—GAS 85,000 BTU:
$525.00/materials each + $995.00 installed/labor each = $1,520.00/total
9. FURNACES—GAS 90,000 BTU:
$542.00/materials each +$995.00 installed/labor each = $1,537/total
10. FURNACES—GAS 100,000 BTU:
$605.00/materials each +$995.00 installed/labor each = $1,600.00/total
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.45091
Priority Repair Program G.A.Miller Enterprise Inc.d/b/a Glenn's Air Conditioning and Heating Rev.
10/2014
WALL VENTED FURNACE/WALL HEATER-GAS: Complete Install ofagas firenixvaUrnounted
heater including all gas line, wall mounted thermostat,flue piping complete through the roof
jack and flashing.
11.WALL VENTED FURNACE 35,000 GAS
$700.00/materials each + $600.00 installed/labor each = $1,300. |
12.WALL VENTED FURNACE 40,000 GAS
$750.O0/nmateria|s each +$60U.0O installed/labor each = $2,3S0.OD/tota|
--^WALL VENTED FURNACE 50,000 GAS
$79G.O0/mmaterio|s each + $6OO.00 installed/labor each = $1,395.0U/tota|
HEAT PUMP SYSTEMS: Installation cost shall include all labor, material, and supplies required
to install new complete systems in accordance with
manufacturer requirements, removal of existing unit and proper disposal in accordance with
EPA regulation. Installation shall include new plastic pad, ifneeded,
cover if necessary and miscellaneous repairs.
14. HEAT UNIT: Complete heat-pump unit, 2 Ton System: High
Effioiencyorhi8herConfigurotionTvpes: Up-f|om\ Dovvn-f|oxvandHorizonta|
$1,78O.O0/K4ateria|s each +$1,225.U0 installed/labor each = $3,OO5.00/Tota|
15. Complete heat-pump unit, 2.S Ton System: High
EfficienoyorhiDherCunfigurationTxpes: Up-f|ow\ Doxvn-f|oxvandHorizonta|
$2,UO3.O0/K8ateria|s each +$1,225.OU installed/labor each = $3,220.00/Tota|
16. Complete heat-pump unit, 3Ton System: High
Efficiency or higher Configuration Types: Up-f|ow4 Down-flow and Horizontal
$2/16S.QB/K8mteria|s each + $1,225.00 installed/labor each = $3,390/Tota|
17. HEAT UNIT: Complete heat-pump unit, 3.5 System: High
Efficiency or higher Configuration Types: Up-flow, Down-flow and Horizontal
$2,2lG.00/Mmteria|s each +$l,226.DO installed/labor each = $3,441.UU/ToKa|
18. HEAT UNIT: Complete heat-pump unit, 54'O0O BTU System: High
EffidencyorhigherCnnfiQurationTypes: Up-f|ow4Dovvn-f|oxvandHorizonta| �
$2,437.D0/K4eteria|y each +$1/225.0Oinska||ed/|mbpr each = $3,562.UO/Tnta|
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.409l
Priority Repair Program G.&.Miller Enterprise Inc.d/b6 Glenn's Air Conditioning and Heating Rev.
lN2Ol4
Complete System:-Central Air-Conditioner and Gas Furnace Complete: Installation cost shall
include all labor, material, and supplies required to install new unit in accordance to
manufacturer requirements and removal of existing unit and proper disposal in accordance
with EPA regulation. Installation shall also include condenser, gas furnace, and evaporator coil.
If needed or existing piece is not working or functional install drain pans with working drain
lines, duct and flue modification, filter enclosure, power disconnect/whip, liquid line dyer,
suction line dryer, refrigerant, and plastic pad if needed. Gas furnace to include the vent stack
complete, insulated and; or sealed in accordance to local code requirements. "Contractor is
responsible for securing permit.
19. Complete System A/C&Gas Furnace: Size: 2 Tons, 14 SEER Rating and 80%AFUE
Furnace Types: Up-flow, Down-flow and Horizontal:
$3,220.00/material cost + $1,280.00 installed/labor cost=$4,500.00/each
Specify Manufacturer Brand and Series Being Proposed: Goodman
20.Complete System A/C&Gas Furnace, Size: 2.5 Tons, SEER Rating: 14,AFUE: 80%
Annual Fuel Utilization Efficiency or higher Configuration Types: Up-flow, Down-flow
and Horizontal:
$3,312.00/material cost+ $1,280.00 installed/labor cost®$4,592.00/each
Specify Manufacturer Brand and Series Being Proposed: Goodman
21. Complete System A/C&Gas Furnace,Size: 3 Tons, SEER Rating: 14,AFUE: 80%Annual
Fuel Utilization Efficiency or higher Configuration Types: Up-flow, Down-flow and
Horizontal:
$3,525.00/material cost + $1,280.00 installed/labor cost® $4,805.00/ each
Specify Manufacturer Brand and Series Being Proposed: Goodman
22. Complete System A/C&Gas Furnace, Size: 3.5 Tons, SEER Rating: 14, AFUE: 80%
Annual Fuel Utilization Efficiency or higher Configuration Types: Up-flow, Down-flow
and Horizontal:
$3,810.00/material cost+ $1,280.00 installed/labor cost =$5,090.000/ each
23. Complete System A/C&Gas Furnace,Size:4 Tons, SEER Rating: 14, AFUE: 80%Annual
Fuel Utilization Efficiency or higher Configuration Types: Up-flow, Down-flow and
Horizontal:
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.45091
Priority Repair Program G.A.Miller Enterprise Inc.d/b/a Glenn's Air Conditioning and Heating Rev.
10/2014
$4,035.00/material cost+$1,280.00 installed/labor cost=$5,315.00/each
Central Air Conditioner Unit (Outside Unit Only): Installation cost shall include all labor,
material and supplies required to install new unit in accordance to manufacturer(s)
requirements, removal of existing unit and properly disposal in accordance with EPA
regulation. Installation shall also include if needed or existing is not operable, the condenser
power disconnect/whip, liquid line dryer, section line dryer, refrigerant and plastic pad.
"Contractor is responsible for securing permit (when applicable).
24. Central Air Conditioner Unit, Size: 1.5 Tons, SEER Rating: 14 EER Rating:
$1,460.00/material cost+$480.00 installed/labor cost = $1,994.00/each
Specify Manufacturer Brand and Series Being Proposed: Goodman
Specify cost for replacement of evaporator/cooling coil (if required)
$487.20/material cost + $320.00 installed/labor cost = $807.20/each
25. Central Air Conditioner Unit, Size: 2 Tons, SEER Rating: 14 EER Rating:
$1,532.00/material cost + $480.00 installed/labor cost = $2,012.00/ each
Specify Manufacturer Brand and Series Being Proposed: Goodman
Specify cost for replacement of evaporator/cooling coil (if required)
$487.20/material cost+ $320.00 installed/labor cost = $807.20/each
26. Central Air Conditioner Unit, Size: 2.5 Tons, SEER Rating: 14 EER Rating:
$1,660.00/material cost + $480.00 installed/labor cost =$2,140.00/each
Specify Manufacturer Brand and Series Being Proposed: Goodman
Specify cost for replacement of evaporator/cooling coil (if required)
$512.00/material cost $320.00 installed/labor cost = $832.00/ each
27. Central Air Conditioner Unit, Size: 3 Tons, SEER Rating: 14 EER Rating
$1,890.00/material cost + $480.00 installed/labor cost = $2,320.00/each
Specify Manufacturer Brand and Series Being Proposed: Goodman
Specify cost for replacement of evaporator/cooling coil (if required)
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.45091
Priority Repair Program G.A.Miller Enterprise Inc.d/b/a Glenn's Air Conditioning and Heating Rev.
10/2014
$512.00/material cost + $320.00 installed/labor cost = $832.00/ each
28.. Central Air Conditioner Unit, Size: 3.5 Tons, SEER Rating: 14 EER Rating
$2,340.00/material cost + $480.00 installed/labor cost = $2,820.00/ each
Specify Manufacturer Brand and Series Being Proposed: Goodman
Specify cost for replacement of evaporator/cooling coil (if required)
$556.00/material cost+ $320.00 installed/labor cost = $876.00/each
29. Central Air Conditioner Unit Size:4 Tons, SEER Rating: 14 EER Rating
$2,640.00/material cost + $480.00 installed/labor cost = $3,120.00/ each
Specify Manufacturer Brand and Series Being Proposed: Goodman
Specify cost for replacement of evaporator/cooling coil (if required)
$590.40/material cost +$320.00 installed/labor cost =$910.40/each
30. Central Air Conditioner Unit, Size: 5 Tons, SEER Rating: 14 EER Rating
$3,120.00/material cost+ $480.00 installed/labor cost = $3,600.00/ each
Specify Manufacturer Brand and Series Being Proposed: Goodman
Specify cost for replacement of evaporator/cooling coil (if required)
$590.40/material cost+ $320.00 installed/labor cost = $910.40/each
Preventive Maintenance and Tune-up Services:
31. Air Conditioning System (cooling)-PM and Tune-up Services: To include all labor,
chemicals material and supplies required to perform the services.
$270.00/per unit
I
32. Heat/Furnace-PM and Tune-up Services:To include all labor, material and supplies
required to perform the services.
$163.00/per unit
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.45091
Priority Repair Program G.A.Miller Enterprise Inc.d/b/a Glenn's Air Conditioning and Heating Rev.
10/2014
33. Condenser Coil Cleaning Services (only):To include all labor, chemicals, materials and
supplies required to perform the services.
$105.00/per unit
34. Evaporator/Cooling Coil Cleaning Services (only):To include all labor, chemicals,
materials and supplies required to perform the services.
$325/per unit Dpflow
Duct Sealing and Repair Services: Duct Sealing and Repair Services: Vapor barrier must be
placed to the outside with no exposed insulation. Insulation should cover all exposed supply
and return ducts with no significant areas of bare duct left un-insulated. Insulation should be
attached with Stuck ups,twine, or plastic straps.
35. Duct Seal Services with mastic/board:
$35.00/flat fee per duct
36. Plenum Supply Seal Services with mastic/board:
$110.00/flat fee
37. Product or Service Type: Plenum Return Seal Services with mastic:
$75.00/flat fee
38. Register Replacement:To include all labor, material, supplies, and equipment to install
new adjustable, curved blade, with shutter damper register and mastic sealant:
$25.00/flat fee
39. Duct Replacement Services Supply Opening:To include all labor, material, supplies, and
equipment to seal and install new R-8 value or better duct insulation to include a new
adjustable curved blade with shutter damper mister and mastic sealant:
$115.00/per Run/drop
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.45091
Priority Repair Program G.A.Miller Enterprise Inc.d/b/a Glenn's Air Conditioning and Heating Rev.
10/2014
I
Access covers for attics: All services shall be completed in accordance to local code
requirements.
40. Product or Service Type: Create an attic access—new, where none previously existed
(install in closet or hallway/where possible) Install painted wood trim for a finished
appearance for new access. %" plywood painted panel;to include insulation barrier,
weather-stripping and R-19 or greater insulation pillow:
$125.00/flat fee
41. Product or Service Type: Install Wood Attic Ladder with 2501b Maximum Load
Capacity. Install in accordance with manufacturer's specifications and in accordance
with local building code. Install where applicable. Install painted wood trim for a
finished appearance for new access and weather-stripping.
$250.00/material each +$100.00 installed/labor each = $350.00/cost
42. Install access-exterior—new, where none existed previously exterior%"treated
plywood, 2x4 treated lumber for framing, 2 zinc barrel bolts:
$75.00/flat fee
PLUMBING SERVICES:All services shall be completed in accordance to local code
requirements. "Contractor is responsible for securing permit(when applicable).All items
shall operate without leakage, noise, vibration or hammering.All penetrations of building
components hall be neat and sleeved where applicable. No solder containing lead shall be
used in any pipe or fixture damage to structural members from drilling or notching shall be
repaired.
43.GAS LINE—SCHEDULE 40 STEEL: Hang 3/4" main and 1/2" fixture gas supply lines of
schedule 40 black steel pipe with malleable iron screwed fittings. Install brass stop
valves at all equipment.
$10.00/material per In ft. + $27.00 installed/labor per In ft. = $37.00/total cost
44. Product or Service Type: GAS LINE:—Install new CSST corrugated Stainless Steel
tubing(Gastite's Flash Shield or PRO-FLEX) installation shall include all new shut off
valves and any labor or materials necessary to install and replace the existing lines
under the house. Contractor to apply and pay for all permits.
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.45091
Priority Repair Program G.A.Miller Enterprise Inc.d/b/a Glenn's Air Conditioning and Heating Rev.
10/2014
.
$11U.0U/n/oteha| Drop + $9G.00 installed/labor Drop = $205.00/merDrop
45. Services will be provided Monday
through Friday between 7:00 am and 5:30 pm. Rate shall include trip charge,travel
time, mileage, transportation cost, parking and toll fees. Rate shall start upon arrival at
client home or worksite. "Contractor is responsible for securing permit, (when
applicable).
AHourIv Rate for Labor Cost
46. Emergency Float Switch/Valve 0mit-A/C drain Pan:
$G0.00/nmateria| cost each +$65.O0 installed/labor each = $11S.DD/each
47. Cap all gas lines prior to filling the distribution system
with 6'8 |bs. of compressed air. Maintain pressure for at least 30minutes. Locate and
seal minor any leaks in the system.
$2Q.0O/nmateria| each +$230.UO installed/labor each. = $26Q.00/tuta| cost
ELECTRICAL SERVICES : All Materials shall be0L approved and or National Electrical Code
rated. All drilling, cutting and fastening shall be near and true and shall not crytlmoi|y damage
framing members. All cost must include the removal and disposal of existing units.
48, Install a flush orsurface
mounted duplex outlet a separate 2O amp circuit using#l2 copper Ronnex.
$55.UO/mnateria| each +$14G.0O installed/labor each = $200.00/ each
49^ surface
mounted receptacle onan individual circuit (#O Cooper Ronnen).
$75.uU/rnateria| each +$145.0D installed/labor each =$220.0R/ each
GO. Rate shall include
trip charge,travel time, mileage, transportation cost.The labor rate shall start upon
arriva/ atc|i8nthnrneorvvorksite. "Contractorisrespnnsibleforsecuringpernnit(vvhen
applicable).
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.4509l
Priority Repair Program G.A.Nfiller Enterprise Inc.d/b/a Glenn's Air Conditioning and Heating Rev.
l0/20l4
$33.00/Hourly
51.Carbon Monoxide Alarm: Operated Unit. Alarm must be installed in accordance with
the manufactures recommendation.
$21.00/Materials each +$12 installed/labor each = $33.00/Total
52. SHEETROCK/DRYWALL%" : Remove old drywall and dispose. Use a 3 coat process, set
tape in bed coat; apply two coats topping compound. Allow drying time; sand-finish
coats smooth to paint ready. Price shall be based on a minimum of 32 sq. ft.
$2.00/Materials Sq. Ft. + $1.33 installed/labor Sq. Ft. ® $3.33/Total
53. LABRO RATE FOR CARPENTRY: Services and related work not specified or mention
under the RFP contract: Note: Rate shall include trip charge, travel time, mileage,
transportation cost and parking fees.The labor rate shall start upon arrival at client
home or worksite.
$40.00/Hourly Labor Cost
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.45091
Priority Repair Program G.A.Miller Enterprise Inc.d/b/a Glenn's Air Conditioning and Heating Rev.
10/2014