Loading...
HomeMy WebLinkAboutContract 45067-A1 CITY SECRETAN CONTRACT N®. FIRST AMENDMENT TO CITY SECRETARY CONTRACT NO. 45067 WHEREAS, on October 31, 2013,the City of Fort Worth("City") and Javier Villagomez d/b/a GTO Construction, a sole proprietorship authorized to do business in the State of Texas ("Contractor)made and entered into City Secretary Contract No. 45067 (the "Contract) for construction services for the City's Priority Repair Program. WHEREAS,the Priority Repair Program provides up to $5,000.00 for home repairs for eligible City homeowners for Priority 1 emergency repairs and Priority 2 repairs of failed household mechanical systems to address health and safety issues as more particularly defined by the program. WHEREAS, the Contract was for a 1 year term beginning on the Effective Date and provided for 4 additional 1 year terms; WHEREAS, the Parties have agreed to extend the Contract for an additional 1 year term beginning November 1,2014 through October 31, 2015; and, WHEREAS, it is the mutual desire of City and Contractor to amend the Contract to meet Contract objectives. NOW, THEREFORE, City and Contractor hereby agree to amend the Contract as follows: I. ARTICLE 1. DEFINITIONS is amended by adding the following definitions: "Effective Date"means November 1,2014. "Priority Repair Program" or"program"means the City's home repair program for eligible low to moderate income homeowners adopted by the City Council in M&C G- 17589. ARTICLE 2. SCOPE OF SERVICES Section A. is amended to be and read as follows by adding the following as the m first sentence. C-) rn M "A. The purpose of this Contract is to provide home repair services for the Priority e`r'+ Repair Program. The services provided shall be either Priority 1 emergency M repairs or Priority 2 repairs of failed household mechanical systems to address health and safety issues as determined by City in accordance with program guidelines. OFFICIAL RECORD FIRST CONTRACT AMENDMENT CSC NO.45067 CITY SECiRETARV Rev. 10/2014 Priority Repair Program Fr.WORTH,TX Page 1 Javier Villagomez d/b/a GTO Construction The first sentence of ARTICLE 5. TERM OF CONTRACT is amended to be and read as follows: "This Contract shall commence as of the Effective Date and shall automatically expire upon the earlier of the expenditure of$300,000.00 or October 31, 2015 (the "Expiration Date"), if not terminated sooner or extended as described below." II. Attachment C attached to the Contract is deleted and replaced with the attached Attachment C Revised 10/2014. III. All other terms and conditions of City Secretary Contract No. 45067 not amended herein remain unaffected and in full force and effect, are binding upon the Parties, and are hereby ratified by the Parties. Capitalized terms not defined herein shall have meanings assigned to them in the Contract. [REMAINDER OF PAGE LEFT INTENTIONALLY BLANK] FIRST CONTRACT AMENDMENT CSC NO.45067 Rev. 10/2014 Priority Repair Program Page 2 Javier Villagomez d/b/a GTO Construction 0'°000- ACCEPTED AND AGREED. �p s Cl 70 00 ATTEST: AJT T WORTH it Se r Va ', Fernando Costa,Assistant City Manager M&C C- 10/15/2013 APPR YED AST FO AND LEGALITY" Vicki S. Ganske, Senior Assistant City Attorney CONTRACTOR By: 3 Ja ier lagom er OFFICIAL RECORD FIRST CONTRACT AMENDMENT CSC NO.45067 LUIY)Yf SEC RETARY ev. /2014 Priority Repair Program WORT H9`X Page 3 Javier Villagomez d/b/a GTO Construction ATTACHMENT C Revised 11/2014 FORTWORTH CITY OF FORT WORTH DEPARTMENT OF HOUSING AND ECONOMIC DEVELOPMENT DEPARTMENT 1000 THROCKMORTON FORT WORTH TEXAS 76102 PRIORITY REPAIR PROGRAM FIRST CONTRACT AMENDMENT CSC NO. 45067 Javier Villagomez d/b/a GTO Construction ITEMIZED BID TABS: PLUMBING SERVICES: All services shall be completed in accordance to local code requirements. "Contractor is responsible for securing permit (when applicable). All items shall operate without leakage, noise, vibration or hammering. All penetrations of building components hall be neat and sleeved where applicable. No solder containing lead shall be used in any pipe or fixture damage to structural members from drilling or notching shall be repaired. 1. Product or Service Type: GAS LINE:— Install new CSST corrugated Stainless Steel tubing (Gastite's Flash Shield or PRO-FLEX) installation shall include all new shut off valves and any labor or materials necessary to install and replace the existing lines under the house. Contractor to apply and pay for all permits. $110.00/material Drop + $95.00 installed/labor Drop = $205.00/per Drop 2. Product or Service Type: GAS LINE POLY YARD SERVICE LINE:— Install new YARD LINE Poly-Digg 18" Depth with a tracer wire installed shall include new shut off valves and any labor or materials necessary to install and replace the existing lines. Contractor to apply and pay for all permits. $15.00/material In Ft. + $24.00 installed/labor In Ft. = $39.00/cost BID TABS FIRST CONTRACT AMENDMENT CSC NO.45067 Javier Villagomez d/b/a GTO Construction Re 10/2014 3. HOURLY RATE FOR LABOR MASTER PLUMBER: Services will be provided Monday through Friday between 7:00 am and 5:30 pm. Rate shall include trip charge, travel time, mileage,transportation cost, parking and toll fees. Rate shall start upon arrival at client home or worksite. "Contractor is responsible for securing permit, (when applicable). $83.00\Hourly Rate for Labor Cost 4. Product or Service Type:Specify Labor Rate for Plumbing Services(Plumber's Helper) and related work not specified or mention under the RFP contract. Note: Rate shall include trip charge, travel time, mileage, transportation cost, parking and toll fees. The labor rate shall start upon arrival at client home or worksite. "Contractor is responsible for securing permit (when applicable) $42.00 1Hourly Rate for Labor Cost. 5. Product or Service Type: Emergency Flood Stop Valve Unit-Water Heaters: $160.00/material cost each +$65.00 installed/labor each =$225.00/each 6. Product or Service Type: Emergency Flood Stop Valve Unit-A/C drain Pan: $100.00/material cost each +$65.00 installed/labor each =$165.00/each 7. Product or Service Type: Faucet e Kitchen -Single handle kitchen faucet with sprayer, supply lines and shut off valves. Finish: Chrome: $90.00/material cost each+$60.00 installed/labor each =$150.00/each Specify Manufacturer Brand and Series Being Proposed:DELTA/Glacier bay BID TABS FIRST CONTRACT AMENDMENT CSC NO.45067 Javier Villagomez d/b/a GTO Construction Re 10/2014 8. Product or Service Tvpe: Faucet–Kitchen– Dual Control kitchen faucet with sprayer, supply lines and shut off valves. Finish: Chrome: $80.00/material cost each +$60.00 installed/labor each =$140.00/each Specify Manufacturer Brand and Series Being Proposed:DELTA/Glacier bay 9. Product or Service Type: Faucet–Bathroom-Two handle bathroom faucet with pop- up assembly, drain, supply lines and shut off valves. Finish: Chrome: $60.00/material cost each +$75.00 installed/labor each =$135.00/each Specify Manufacturer Brand and Series Being Proposed: DELTA/Glacier bay 10. Product or Service Type:Shower Diverter Faucet Valve Complete–Bathroom -: Install a dual control valve, metal shower diverter faucet valve. Finish: Chrome: $75.00/material cost each +$150.00 installed/labor each =$225.00/each Specify Manufacturer Brand and Series Being Proposed:DELTA/Glacier bay 11. Product or Service Type:TUB Dual Control Faucet Valve Complete–Bathroom-: Install a metal, dual control, tub fill faucet valve complete. Finish: Chrome: $75.00/material cost each +$150.00 installed/labor each = $225.00/each Specify Manufacturer Brand and Series Being Proposed:DELTA/Glacier bay 12.WATER SERVICE—PEX LINE: Excavate to 36", lay 1" PEX pipe and refill trench for water service. Lay line without joints from meter hub to main shut off valve inside structure. Contractor to apply and pay for all permits. Backfill disturbed yard areas. $10.00/material per In ft. +$25.00 installed/labor per In ft. =$35.00/total cost 13.SHUT OFF VALVE: Install Chromed brass shut-off valve on existing fixture supply line. $15.00/material each+$25.00 installed/labor each. =$40.00/total cost BID TABS FIRST CONTRACT AMENDMENT CSC NO.45067 Javier Villagomez d/b/a GTO Construction Re 10/2014 14. ROD AND CLEAN DRAINS: Rod and clean drain lines at all fixtures to clear lines for fixtures to main street sewer. $20.00/material each +$75.00 installed/labor each. =$95.00/total cost 15. DRAIN-WASTE-VENT-PVC: Install schedule 40 PVC pipe and fittings, solvent welded after a dyed cleaning step. Install pipe with hangers 3' on center without critical damage to structural members. $15.00/material per In ft. +$25.00 installed/labor per In ft. =$40.00/total cost 16.SEWER SERVICE-4" PVC: Install a 4" PVC sewer line from structure and connect to the public sanitary sewer system. Install clean-outs as required. Re-grade yard in work area, sow grass seed and spread straw to reestablish lawn. Contractor to apply and pay for all permits. $25.00/material per In ft. +$18.00 installed/labor per In ft. =$43.00/total cost 17. GAS LINE—PRESSURE TEST: Cap all gas lines prior to filling the distribution system with 5-8 lbs. of compressed air. Maintain pressure for at least 30 minutes. Locate and seal minor any leaks in the system. $20.00/material each +$230.00 installed/labor each. =$250.00/total cost 18. GAS LINE–SCHEDULE 40 STEEL: Hang 3/4" main and 1/2" fixture gas supply lines of schedule 40 black steel pipe with malleable iron screwed fittings. Install brass stop valves at all equipment. $10.00/material per In ft. +$27.00 installed/labor per In ft. = $37.00/total cost BID TABS FIRST CONTRACT AMENDMENT CSC NO.45067 Javier Villagomez d/b/a GTO Construction Re 10/2014 WATER HEATERS: Installation cost shall include all travel time, trip charge, labor & equipment/material/supplies required to install complete new water heater. Install a glass lined, high recovery, insulated, gas water heater with a 6-year warranty (electric water heater when applicable). Use A. O. Smith or approved equal. Installation cost shall include new double wall vent pipes, collard, new gas line, "drip leg" new T&P lines, new roof flue/jack stack-complete, pan and pipe insulation. Unit must meet city code and must be raised 18" from elevation (when applicable). The removal of existing water heater and proper disposal shall be in accordance to EPA regulation. "Contractor is responsible for securing permit." 19. WATER HEATER-30 GALLON GAS: $500.00/material each + $700.00 installed/labor each. = $1,200.00/total cost 20. WATER HEATER-40 GALLON GAS: $500.00/material each + $700.00 installed/labor each. = $1,200.00/total cost 21. WATER HEATER-50 GALLON GAS: $500.00/material each + $700.00 installed/labor each. = $1,200.00/total cost 22. WATER HEATER-30 GALLON ELECTRIC: $545.00/material each + $400.00 installed/labor each. = $945.00/total cost 23. WATER HEATER-40 GALLON ELECTRIC: $560.00/material each + $400.00 installed/labor each. = $960.00/total cost 24. WATER HEATER-50 GALLON ELECTRIC: $602.00/material each + $400.00 installed/labor each. = $1,002.00/total cost BID TABS FIRST CONTRACT AMEN DM ENT CSC NO.45067 Javier Villagomez d/b/a GTO Construction Re 10/2014 25. WATER SUPPLY PEX-1 BATH HOUSE: Remove all water supply from main shut off valve inside structure. Install PEX type 3/4" fixture grouping trunk/manifold, and 3/8" individual supply lines to service one 3 piece bath, water heater, kitchen and laundry area. Follow Manufacture Installation Guide using all PEX fittings, and crimp rings, shall be complete, code compliant, fully usable, and include shut-off valves, chromed fixture supply lines and air gaps. Insulate all pipes where applicable to include over the attic areas. $42.31/material per drop+$189.69 installed/labor per drop= $225.00/total cost 26.WATER SUPPLY PEX-2 BATH HOUSE: Remove all water supply from main shut off valve inside structure. Install PEX type 3/4" fixture grouping trunk/manifold, and 3/8" individual supply lines to service two 3 piece bath, water heater, kitchen and laundry area. Follow Manufacture Installation Guide using all PEX fittings, and crimp rings, shall be complete, code compliant, fully usable, and include shut-off valves, chromed fixture supply lines and air gaps. Insulate all pipes where applicable to include over the attic areas. $42.31/material per drop+$189.69 installed/labor per drop =.$225.00/total cost 27.WATER SUPPLY PEX-3 BATH HOUSE: Remove all water supply from main shut off valve inside structure. Install PEX type 3/4" fixture grouping trunk/manifold, and 3/8" individual supply lines to service two 3 piece bath, water heater, kitchen and laundry area. Follow Manufacture Installation Guide using all PEX fittings, and crimp rings, shall be complete, code compliant, fully usable, and include shut-off valves, chromed fixture supply lines and air gaps. Insulate all pipes where applicable to include over the attic areas $42.31/material per drop+$189.69 installed/labor per drop = $225.00/total cost BID TABS FIRST CONTRACT AMENDMENT CSC NO.45067 Javier Villagomez d/b/a GTO Construction Re 10/2014 Complete System:-Central Air-Conditioner and Gas Furnace Complete: Installation cost shall include all labor, material, and supplies required to install new unit in accordance to manufacturer requirements and removal of existing unit and proper disposal in accordance with EPA regulation. Installation shall also include condenser, gas furnace, and evaporator coil. If needed or existing piece is not working or functional install drain pans with working drain lines, duct and flue modification, filter enclosure, power disconnect/whip, liquid line dyer, suction line dryer, refrigerant, and plastic pad if needed. Gas furnace to include the vent stack complete, insulated and; or sealed in accordance to local code requirements. "Contractor is responsible for securing permit. 28. Complete System A/C &Gas Furnace: Size: 2 Tons, 14 SEER Rating and 80%AFUE Furnace Types: Up-flow, Down-flow and Horizontal: $1,350.00/material cost+$2,898.00 installed/labor cost=$4,248.00/each Specify Manufacturer Brand and Series Being Proposed: Goodman/Lennox 29. Complete System A/C&Gas Furnace, Size: 2.5 Tons, SEER Rating: 14, AFUE: 80% Annual Fuel Utilization Efficiency or higher Configuration Types: Up-flow, Down-flow and Horizontal: $1,450.00/material cost+$2,900.00 installed/labor cost=$4,350.00/each Specify Manufacturer Brand and Series Being Proposed: Goodman/Lennox 30.Complete System A/C&Gas Furnace, Size: 3 Tons, SEER Rating: 14,AFUE: 80%Annual Fuel Utilization Efficiency or higher Configuration Types: Up-flow, Down-flow and Horizontal: $1,500.00/material cost+$3,000.00 installed/labor cost=$4,500.00/each Specify Manufacturer Brand and Series Being Proposed: Goodman/Lennox 31.Complete System A/C&Gas Furnace, Size: 3.5 Tons, SEER Rating: 14, AFUE: 80% Annual Fuel Utilization Efficiency or higher Configuration Types: Up-flow, Down-flow and Horizontal: $1,500.00/material cost+$3,215.00 installed/labor cost=$4,715.00/each Specify Manufacturer Brand and Series Being Proposed: Goodman/Lennox BID TABS FIRST CONTRACT AMENDMENT CSC NO.45067 Javier Villagornez d/b/a GTO Construction Re 10/2014 32. Complete System A/C&Gas furnace, Size: 4 Tons, SEER Rating: 14, AFUE: 30%Annual Fuel Utilization Efficiency or higher Configuration Types: Up-flow, Down-flow and Horizontal: $1,200.00/material cost+$2,225.00 installed/labor cost=$3,425.00/each Specify Manufacturer Brand and Series Being Proposed: Goodman/Lennox Central Air Conditioner Unit(Outside Unit Only): Installation cost shall include all labor, material and supplies required to install new unit in accordance to manufacturer (s) requirements, removal of existing unit and properly disposal in accordance with EPA regulation. Installation shall also include condenser power disconnect/whip, liquid line dryer, section line dryer, refrigerant and plastic pad, if needed. "Contractor is responsible for securing permit (when applicable). 33. Central Air Conditioner Unit, Size: 1.5 Tons, SEER Rating: 14 EER Rating: $600.00/material cost+$1,396.00 installed/labor cost=$1,996.00/each Specify Manufacturer Brand and Series Being Proposed: Goodman/Lennox Specify cost for replacement of evaporator/cooling coil (if required) $350.00/material cost+$205.00 installed/labor cost=$555.00/each 34. Central Air Conditioner Unit, Size: 2 Tons, SEER Rating: 14 EER Rating: $1,000.00/material cost+ $1,399.00 installed/labor cost= $2,399.00/each Specify Manufacturer Brand and Series Being Proposed: Goodman/Lennox Specify cost for replacement of evaporator/cooling coil (if required) $400.00/material cost+$205.00 installed/labor cost=$605.00/each 35. Central Air Conditioner Unit,Size: 2.5 Tons, SEER Rating: 14 EER Rating: $1,000.00/material cost+$1,449.00 installed/labor cost= $2,449.00/each Specify Manufacturer Brand and Series Being Proposed: Goodman/Lennox $400.00/material cost+$205.00 installed/labor cost= $605.00/each BID TABS FIRST CONTRACT AMENDMENT CSC NO.45067 Javier Villagomez d/b/a GTO Construction Re 10/2014 36. Central Air Conditioner Unit, Size: 3 Tons, SEER Rating: 14 EER Rating $1,000.00/material cost+ $1,500.00 installed/labor cost = $2,500.00/each Specify Manufacturer Brand and Series Being Proposed: Goodman/Lennox Specify cost for replacement of evaporator/cooling coil (if required) $415.00/material cost + $205.00 installed/labor cost = $620.00/each 37. Central Air Conditioner Unit, Size: 3.5 Tons, SEER Rating: 14 EER Rating $1,000.00/material cost+ $1,500.00 installed/labor cost = $2,500.00/each Specify Manufacturer Brand and Series Being Proposed: Goodman/Lennox Specify cost for replacement of evaporator/cooling coil (if required) $415.00/material cost+ $205.00 installed/labor cost = $620.00/each 38. Central Air Conditioner Unit, Size:4 Tons, SEER Rating: 14 EER Rating $500.00/material cost + $1,700.00 installed/labor cost = $2,200.00/each Specify Manufacturer Brand and Series Being Proposed: Goodman/Lennox Specify cost for replacement of evaporator/cooling coil (if required) $475.00/material cost + $200.00 installed/labor cost = $675.00/each Preventive Maintenance and Tune-up Services: 39. Air Conditioning System (cooling)-PM and Tune-up Services: To include all labor, chemicals material and supplies required to perform the services. $250.00/per unit BID TABS FIRST CONTRACT AMENDMENT CSC NO.45067 Javier Villagomez d/b/a GTO Construction Re 10/2014 40. Heat/Furnace-PM and Tune-up Services:To include all labor, material and supplies required to perform the services. $150.00/per unit 41. Condenser Coil Cleaning Services(only):To include all labor, chemicals, materials and supplies required to perform the services. $150.00/peg°unit 42. Evaporator/Cooling Coil Cleaning Services(only): To include all labor, chemicals, materials and supplies required to perform the services. $150.00/per unit Duct Sealing and Repair Services: Duct Sealing and Repair Services:Vapor barrier must be placed to the outside with no exposed insulation. Insulation should cover all exposed supply and return ducts with no significant areas of bare duct left un-insulated. Insulation should be attached with Stuck ups, twine, or plastic straps. 43. Product or Service Tvpe: Duct Seal Services with mastic/board: $33.00/flat fee per duct 44. Product or Service Tvpe: Plenum Supply Seal Services with mastic/board: $45.00/flat fee 45. Product or Service Type: Plenum Return Seal Services with mastic: $55.00/flat fee 46. Product or Service Type: Register Replacement: To include all labor, material, supplies, and equipment to install new adjustable, curved blade, with shutter damper register and mastic sealant: $25.00/flat fee BID TABS FIRST CONTRACT AMENDMENT CSC NO.45067 Javier Villagomez d/b/a GTO Construction Re 10/2014 47. Product or Service Type: Duct Replacement Services Supply Opening: To include all labor, material, supplies, and equipment to seal and install new R-8 value or better duct insulation to include a new adjustable curved blade with shutter damper mister and mastic sealant: $95.00/per Run/drop HEATING VENTILATION AND AIR CONDITIONING (HVAC)--GENERAL REQUIREMENTS: Equipment shall operate safely without leakage, noise, or vibration. All penetration of building components shall be neat,sleeved and fire stopped and shall not compromise structural integrity. Contractor shall submit a diagram, and must use the Air Conditioning Contractors of America (ACCA) Manual J Heat loss calculation tool http://www.acca.org/tech/manualj/), and use ACCA's Manual S for equipment selection. Size of furnace selected should be matched to the living unit considering any areas which may be added or subtracted from the plan plus meet the current Energy Code requirements adopted by the City to efficiently heat the structure. 48. HOURLY RATE FOR LABOR COST HVAC:Service and related work: Services will be provided Monday through Friday between 7:00 am and 5:30 pm. Rate shall include trip charge, travel time, mileage, transportation cost, parking and toll fees. Rate shall start upon $80.00\Hourly Rate for Labor Cost CENTRAL GAS FURNACE:–Complete install–Efficiency or higher configuration types: Up-flow, Down-flow and Horizontal. Central Heat/Furnace all installations shall be code compliant, a mechanical permit is required. Installation cost shall include all labor, material and supplies required to install new unit in accordance with manufacturer requirements, removal of existing unit and properly disposal in accordance with EPA regulation. Installation shall also include, vent flue- complete with outside roof jack and flashing, new gas valve if applicable,gas lines and shut off valve, if applicable, duct modification if needed. Unit shall be properly vented, insulated and/or sealed in accordance to local code requirements (including high low vents). 49. FURNACES—GAS 36,000 BTU: $491.00/materials each +$995.00 installed/labor each =$1,486.00/total BID TABS FIRST CONTRACT AMENDMENT CSC NO.45067 Javier Villagomez d/b/a GTO Construction Re 10/2014 50. FURNACES—GAS 42,000 BTU: $497.00/materials each+$995.00 installed/labor each =$1,492.00/total 51. FURNACES—GAS 50,000 BTU: $460.00/materials each+$995.00 installed/labor each =$1,455.00/total 52. FURNACES—GAS 70,000 BTU: $492.00/materials each+$995.00 installed/labor each =$1,487.00/total 53. FURNACES—GAS 75,000 BTU: $502.00/materials each+$995.00 installed/labor each =$1,497.00/total 54. FURNACES—GAS 80,000 BTU: $504.00/materials each+$995.00 installed/labor each =$1,499.00/total 55. FURNACES—GAS 85,000 BTU: $525.00/materials each+$995.00 installed/labor each =$1,520.00/total 56. FURNACES—GAS 90,000 BTU: $605.00/materials each+$995.00 installed/labor each =$1,600.00/total 57. FURNACES—GAS 100,000 BTU: $605.00/materials each+$995.00 installed/labor each =$1,600.00/total BID TABS FIRST CONTRACT AMENDMENT CSC NO.45067 Javier Villagomez d/b/a GTO Construction Re 10/2014 WALL VENTED FURNACE/WALL HEATER-GAS: Complete Install of a gas fired, wall mounted heater including all gas line,wall mounted thermostat,flue piping complete through the roof jack and flashing. 58.WALL VENTED FURNACE 35,000 GAS $700.00/materials each +$600.00 installed/labor each = $1,300.00/total 59.WALL VENTED FURNACE 40,000 GAS $750.00/materials each +$600.00 installed/labor each =$1,350.00/total 60.WALL VENTED FURNACE 50,000 GAS $795.00/materials each +$600.00 installed/labor each =$1,395.00/total HEAT PUMP SYSTEMS: Installation cost shall include all labor, material, and supplies required to install new complete systems(with new air handler and matching coil) in accordance with manufacturer requirements, removal of existing unit and proper disposal in accordance with EPA regulation. Installation shall include new plastic pad, if needed, disconnect box, line set cover if necessary and miscellaneous repairs. 61. HEAT PUMP-REPLACE 2TON UNIT: Complete heat-pump unit, 2 Ton System: High Efficiency or higher Configuration Types: Up-flow, Down-flow and Horizontal $1,780.00/Materials each +$1,225.00 installed/labor each =$3,005.00/Total 62. HEAT PUMP-REPLACE 2.5TON UNIT: Complete heat-pump unit, 2.5 Ton System: High Efficiency or higher Configuration Types: Up-flow, Down-flow and Horizontal $2,003.00/Materials each +$1,225.00 installed/labor each =$3,228.00/Total 63. HEAT PUMP-REPLACE 3TON UNIT: Complete heat-pump unit, 3 Ton System: High Efficiency or higher Configuration Types: Up-flow, Down-flow and Horizontal $2,165.00/Materials each +$1,225.00 installed/labor each = $3,390/Total 64. HEAT PUMP-REPLACE 3.5TON UNIT: Complete heat-pump unit, 3.5 System: High Efficiency or higher Configuration Types: Up-flow, Down-flow and Horizontal $2,216.00/Materials each +$1,225.00 installed labor each = $3,441.00/Total BID TABS FIRST CONTRACT AMENDMENT CSC NO.45067 Javier Villagomez d/b/a GTO Construction Re 10/2014 65. HEAT PUMP-REPLACE 4T®N UNIT: Complete heat-pump unit, 54,000 BTU System: High Efficiency or higher Configuration Types: Up-flow, Down-flow and Horizontal $2,437.00/Materials each +$1,225.00 installed/labor each =$3,662.00/Total Access covers for attics, and crawlspaces: All services shall be completed in accordance to local code requirements. "Contractor is responsible for securing permit (when applicable). 66. Product or Service Type: Create an attic access—new, where none previously existed (install in closet or hallway/where possible) Install painted wood trim for a finished appearance for new access. %" plywood painted panel; to include insulation barrier, weather-stripping and R-19 or greater insulation pillow: $125.00/flat fee 67. Product or Service Type: Install Wood Attic Ladder with 2501b Maximum Load Capacity. Install in accordance with manufacturer's specifications and in accordance with local building code. Install where applicable. Install painted wood trim for a finished appearance for new access and weather-stripping. $250.00/material each +$100.00 installed/labor each =$350.00/cost 63. Product or Service Type: Install acres-exterior—new, where none existed previously exterior%"treated plywood, 2x4 treated lumber for framing, 2 zinc barrel bolts: $75.00/flat fee ELECTRICAL SERVICES : All Materials shall be UL approved and or National Electrical Code rated. All drilling, cutting and fastening shall be near and true and shall not critically damage framing members.All cost must include the removal and disposal of existing units. 69. Product or Service Tvpe: GFCI Receptacle/Plug: Install a flush mounted, ground fault circuit interrupted ivory duplex receptacle adjacent to lavatory using copper romex. Fish wire and repair all tear out. $35.00/material each +$90.00 installed/labor each =$125.00/each BID TABS FIRST CONTRACT AMENDMENT CSC NO.45067 Javier Villagomez d/b/a GTO Construction Re 10/2014 70. Product or Service TVpe: GECI EXTERIOR Receptacle/Plug: Install a flush mounted, ground fault circuit interrupted duplex receptacle adjacent appropriate for exterior use using copper romex. Fish wire and repair all tear out. $45.00/material each +$105.00 installed/labor each = $150.00/each 71. Product or Service TVpe: INSTALL RECEPTACLE--15 Install an ivory, duplex, 15 amp receptacle and ivory cover plate at least 15" above floor level using copper 12-3 non- metallic (NM) cable. Fish wire and repair all tear out. $25.00/material each +$75.00 installed/labor each =$100.00/each 72. Product or Service TVpe: INSTALL RECEPTACLE--20 Install an ivory, duplex, 15 amp receptacle and ivory cover plate at least 15" above floor level using copper 12-3 non- metallic(NM) cable. Fish wire and repair all tear out. $30.00/material each +$75.00 installed/labor each =$105.00/each 73. Product or Service TVpe: INSTALL NEW SWITCH WALL RECEPTACLE: Install a single pole, ivory switch no more than 48" above the floor with ivory cover plate controlling and using copper 12-3 non-metallic(NM) cable. Fish wire and repair all tear out. $25.00/material each +$75.00 installed/labor each = $100.00/each 74. Product or Service Type: INSTALL SMOKE DETECTOR--HARD WIRED-- INTERCONNECTED Install a UL approved, ceiling mounted smoke and heat detector permanently wired into a receptacle box with battery back-up and interconnected with all other smoke detectors in the unit. $50.00/material each +$100.00 installed/labor each = $150.00/ 75. Product or Service TVpe: REPLACE LIGHT SWITCH Replace light switch with single pole, ivory toggle switch and ivory plastic cover plate. $30.00/material each +$70.00 installed/labor each =$100.00/each BID TABS FIRST CONTRACT AMENDMENT CSC NO.45067 Javier Villagomez d/b/a GTO Construction Re 10/2014 76. Product or Service Type: INSTALL WASHER CIRCUIT 110\20 AMP Install a flush or surface mounted duplex outlet for a washing machine on a separate 20 amp circuit using#12 copper Romex. $55.00/material each+$145.00 installed/labor each =$200.00/each 77. Product or Service TVpe: INSTALL DRYER CIRCUIT--30 AMP Install 220 volt,30 amp, surface mounted receptacle on an individual circuit (#8 Cooper Romex). $75.00/material each +$145.00 installed/labor each =$200.00/each 78. Product or Service Type: INSTALL KITCHEN RANGE/OVEN--30 AMP Install 220 volt, 30 amp, surface mounted receptacle on an individual circuit (#8 Cooper Romex) . $75.00/material each +$150.00 installed/labor each =$225.00/each 79. Product or Service Type: LIGHT FIXTURE COMPLETE: Flush mounted celling light fixture to include light bold. $15.00/material each +$60.00 installed/labor each=$75.00/each 80. ELECTRIC SERVICE-150 AMP: Replace existing electrical service with a residential, 150 amp, single phase, 3 wire electric service. Include a main disconnect, 22 circuit panel board, meter socket, weather head, service cable, and ground rod and cable. Seal all exterior service penetration. New electrical service must meet city code. Dispose of old electric service to code legal dump. $650.00/Materials each +$1,650.00 installed/labor each =$2,300.00/Total 81. ELECTRIC SERVICE-200 AMP: Replace existing electrical service and install a 200 amp, main disconnect, 110/220 volt, 24 circuit panel board, meter socket, weather head, service cable, and ground rod and cable. Seal all exterior service penetration. New electrical service must meet city code. Dispose of old electric service to code legal dump. $700.00/Materials each+$1,750.00 installed/labor each =$2,450.00/Total BID TABS FIRST CONTRACT AMENDMENT CSC NO.45067 Javier Villagomez d/b/a GTO Construction Re 10/2014 82.Carbon Monoxide Alarm: Operated Unit. Alarm must be installed in accordance with the manufactures recommendation. $21.00/Materials each +$12 installed/labor each =$33.00/Total 83. Product or Service Type: Specify Labor Rate for Electrical Services: Rate shall include trip charge, travel time, mileage, transportation cost.The labor rate shall start upon arrival at client home or worksite. "Contractor is responsible for securing permit (when applicable). $83.00/1-lourly Cabinets, Countertops, Sinks and Related Products: All services shall be completed in accordance to local code requirements. "Contractor is responsible for securing permit(when applicable).All cost must include the removal and disposal of existing units. 84. Product or Service Type: Bathroom Cabinet/Vanity Base—Single 24": Reinstall existing countertop and faucet,securely attached to cabinet/vanity. Provide and install new midline series bathroom cabinet/vanity. All work to be level, plumb, and true. Seal all holes and openings where pipes, wires and other materials may come through cabinets with removable material such as "Thumb Gum" to keep out any rodents. Also attach cabinet to studs in walls. Caulk all seams where countertop meets walls. $75.00/material each+$125.00 installed/labor each=$200.00/each 85. Product or Service Type: Bathroom Cabinet/Vanity Base—Single 36": Reinstall existing countertop and faucet, securely attached to cabinet/vanity. Provide and install new midline series bathroom cabinet/vanity. All work to be level, plumb, and true. Seal all holes and openings where pipes, wires and other materials may come through cabinets with removable material such as "Thumb Gum" to keep out any rodents. Also attach cabinet to studs in walls. Caulk all seams where countertop meets walls. $80.00/material each +$145.00 installed/labor each =$225.00/each BID TABS FIRST CONTRACT AMENDMENT CSC NO.45067 Javier Villagomez d/b/a GTO Construction Re 10/2014 86. Product or Service Type: Bathroom Cabinet/Vanity Complete—Single 24": Must include cabinet, sink, faucet, trap, shut-off valves, pop-up drain, caulk, supply lines, etc.: Install new vanity w/sink complete to local code requirements. All work to be level, plumb, and true. Seal all holes and openings where pipes, wires and other materials may come through cabinets with removable material such as "Thumb Gum" to keep out any rodents. $165.00/material each +$238.00 installed/labor each =$403.00/each 87. Product or Service Type: Bathroom Cabinet/Vanity Complete—Single 36": Must include cabinet, sink,faucet, trap, shut-off valves, pop-up drain, caulk, supply lines, etc.: Install new vanity w/sink complete to local code requirements. All work to be level, plumb, and true. Seal all holes and openings where pipes, wires and other materials may come through cabinets with removable material such as "Thumb Gum" to keep out any rodents. $185.00/material each +$365.00 installed/labor each=$550.00/each 88. Product or Service Type: 3 Piece Fiberglass Tub Wall Kit and trim, to include demo of existing unit and must include new green sheetrock, tub caulking and finish: $264.00/material each +$250.00 installed/labor each =$514.00/each 89. Product or Service TVpe: FRP Wall Board Size:4 x 8, Color-White: $30/material sq.ft. +$2.10 installed/labor sq.ft. =$3.70/sq.ft. 90. SHEETROCK/DRYWALL%" : Remove old drywall and dispose. Use a 3 coat process, set tape in bed coat; apply two coats topping compound. Allow drying time; sand-finish coats smooth to paint ready. Price shall be based on a minimum of 32 sq. ft. $2.00/Materials Sq. Ft.+$1.33 installed/labor Sq. Ft. =$3.33/Total 91. SHEETROCK/GREEN BOARD-1/2: Remove old drywall and dispose. Apply two coats topping compound. Allow drying time; sand-finish coats smooth. Price shall be based on a minimum of 32 sq. ft. $2.25/Materials Sq. Ft. +$1.50 installed/labor Sq. Ft. = $3.75/Total BID TABS FIRST CONTRACT AMENDMENT CSC NO.45067 Javier Villagomez d/b/a GTO Construction Re 10/2014 ROOF REPAIRS AND SERVICES:All services shall be completed in accordance to local code requirements. Contractor is responsible for securing permit. 92. ROOF REPLACMENT 3 Tab Composite Shingles: Tear off one layer and replace roof complete. All roof work performed for this bid shall be warranted for a period of one year following payment. This warranty covers problems such as leaks, loose shingles and correcting, replacing or repairing other damage and/or problems that may result from the faulty roof work. Standard roof work shall be bid to include installation of new 205 year'three tab', 15#felt paper,code approved venting, new drip edge, new vent pipe boots, starter shingles for eves and rakes, ridge and gable cap shingles,and code approved Work includes proper disposal of scrap and waste. Bid shall assume less than 8/12 pitch roof. $85.00/Materials SQ+$90.00 installed/labor SQ=$170.00/Total 93. ROOFING TEAR-OFF: Tear off each additional roofing layer(beyond one layer): $20.00/SQ. Each Labor Cost 94. Product or Service Type: New Decking OSB : Tear off one layer and replace decking complete. Standard roof work shall be bid to include installation of new decking materials. Work includes proper disposal of scrap and waste. Roofs greater than 6/12 pitch additional costs will be considered on a case by case basis, costs bid below assume less than 6/12 pitch: $20.00/material cost SQ+$40.00 installed/labor cost per SQ= $60.00/SQ 95. Product or Service Type: Remove and dispose of Wood Shingles:Tear off one layer of wood shingles and dispose properly per SQ. Labor and disposal fee$20.00/flat fee per SQ 96. Product or Service Type: ROLL Roofing TORCH DOWN 90LB( labor includes removal of existing and disposal): $50.00/material cost SQ+$140.00 installed/labor cost per SQ=$190.00/SQ BID TABS FIRST CONTRACT AMENDMENT CSC NO.45067 Javier Villagomez d/b/a GTO Construction Re 10/2014 97. Product or Service Type:V Tech Modified ROLL Roofing(commercial grade torch down): $50.00/material cost SQ+$140.00 installed/labor cost per SQ= $190.00/SQ Product or Service Type:TREE And Shrub Trimming(away from roof shingles: Cost must include all labor and disposal: 98.Cost for 10 Cubic Yards (10 cubic yards=the size of a Volkswagen Beetle) $200.00/flat fee 99. Cost for 5 Cubic Yards (5 cubic yards= %the size of a Volkswagen Beetle) $100.00/flat fee 100. Cost for 2.5 (1/4) Cubic Yards(2.5 cubic yards=%the size of a Volkswagen Beetle $50.00/flat fee Siding and Lumber and Related Services: All services shall be completed in accordance to local code requirements. Remove damaged siding to the joint over nearest stud. Apply matching pine siding to walls with galvanized nails. Break all seams over studs and paint wood "Contractor is responsible for securing permit(when applicable). 101. Siding Pattern 105-109:a Install new siding 1 x 8-12, D-Grade SYP: Remove damaged siding to the joint over nearest stud. Apply matching pine siding to walls with galvanized nails. Break all seams over studs and paint wood. $1.50/material In ft. +$1.50 installed/labor In ft.=$3.000ost 102. Siding Pattern 105-109: Install new siding 1x 6-12, D-Grade SYP: Remove damaged siding to the joint over nearest stud. Apply matching pine siding to walls with galvanized nails. Break all seams over studs and paint wood. $1.50/material In ft. +$1.50 installed/labor In ft. =$3.000ost BID TABS FIRST CONTRACT AMENDMENT CSC NO.45067 Javier Villagomez d/b/a GTO Construction Re 10/2014 103. Siding Pattern 117: Install new siding 1 x 8-12, D-Grade SYP: Remove damaged siding to the joint over nearest stud. Apply matching pine siding to walls with galvanized nails. Break all seams over studs and paint wood. $1.50/material In ft. +$1.50 installed/labor In ft. =$3.000ost 104. Siding Pattern 117: Siding—Install new siding 1 x 6—12, D-Grade SYP: Remove damaged siding to the joint over nearest stud. Apply matching pine siding to walls with galvanized nails. Break all seams over studs and paint wood. $1.50/material In ft. +$1.50 installed/labor In ft. =$3.000ost 105. Siding Masonite:—Install new Masonite-lap sheet siding: Remove damaged siding to the joint over nearest stud. Apply matching pine siding to walls with galvanized nails. Break all seams over studs and paint wood. $1.00/material In ft. +$2.00 installed/labor In ft. =$3.00/Cost 106. Product or Service Type: Siding—Install new Masonite-4 x 8 Sheet siding: Remove damaged siding to the joint over nearest stud. Apply matching pine siding to walls with galvanized nails. Break all seams over studs and paint wood. $2.00/material Sq. Ft. +$2.00 installed/labor Sq. Ft. =$4.00/Sq. Ft. 107. LUMBER-1" X 2": Install a 1"x 2", #2 pine Fascia with bevel cut joints using galvanized finish nails. Caulk over joints, and prime. $1.00/material LN Ft. +$1.00 installed/labor LN Ft. =$2.00/total cost 108. LUMBER-1" X 4": Install a 1"x 4", #2 pine Fascia with bevel cut joints using galvanized finish nails. Caulk over joints, and prime. $1.00/material LN Ft.+$1.00 installed/labor LN Ft. =$2.00/total cost 109. LUMBER-1" X 6": Install a IN 6", #2 pine Fascia with bevel cut joints using galvanized finish nails. Caulk over joints, and prime. $1.25/material LN Ft.+$1.25 installed/labor LN Ft. _$2.50/total cost BID TABS FIRST CONTRACT AMENDMENT CSC NO.45067 Javier Villagomez d/b/a GTO Construction Re 10/2014 110. LUMBER-1" X B": Install a 1"x R", #2 pine Fascia with bevel cut joints using galvanized finish nails. Caulk over joints, and prime. $1.50/material LN Ft.+$1.50 installed/labor LN Ft. =$3.00/total cost 111. Product or Service Type: Floor Assembly Bathroom Floor: Remove and reinstall all fixtures not built-in. Remove floor covering underlayment and expose floor joists. Replace subflooring and any bad joist to restore floor to sound and level condition. Install % underlayment and vinyl sheets good and shoe molding/1/4 round or colonial molding. Correct all damage to walls and fixtures caused by removing/reinstalling. $10.00/material Sq. Ft. +$20.00 installed/labor Sq. Ft. = $30.00/cost 112. LABRO RATE FOR CARPENTRY: Services and related work not specified or mention under the RFP contract: Note: Rate shall include trip charge, travel time, mileage, transportation cost and parking fees.The labor rate shall start upon arrival at client home or worksite. $40.00/Hourly Labor Cost BID TABS FIRST CONTRACT AMENDMENT CSC NO.45067 Javier Villagomez d/b/a GTO Construction Re 10/2014