WHEREAS, on October 31, 2013,the City of Fort Worth("City") and Javier Villagomez
d/b/a GTO Construction, a sole proprietorship authorized to do business in the State of Texas
("Contractor)made and entered into City Secretary Contract No. 45067 (the "Contract) for
construction services for the City's Priority Repair Program.
WHEREAS,the Priority Repair Program provides up to $5,000.00 for home repairs for
eligible City homeowners for Priority 1 emergency repairs and Priority 2 repairs of failed
household mechanical systems to address health and safety issues as more particularly defined
by the program.
WHEREAS, the Contract was for a 1 year term beginning on the Effective Date and
provided for 4 additional 1 year terms;
WHEREAS, the Parties have agreed to extend the Contract for an additional 1 year term
beginning November 1,2014 through October 31, 2015; and,
WHEREAS, it is the mutual desire of City and Contractor to amend the Contract to meet
Contract objectives.
NOW, THEREFORE, City and Contractor hereby agree to amend the Contract as
follows:
I.
ARTICLE 1. DEFINITIONS is amended by adding the following definitions:
"Effective Date"means November 1,2014.
"Priority Repair Program" or"program"means the City's home repair program for
eligible low to moderate income homeowners adopted by the City Council in M&C G-
17589.
ARTICLE 2. SCOPE OF SERVICES Section A. is amended to be and read as follows
by adding the following as the m
first sentence.
C-)
rn
M "A. The purpose of this Contract is to provide home repair services for the Priority
e`r'+ Repair Program. The services provided shall be either Priority 1 emergency
M
repairs or Priority 2 repairs of failed household mechanical systems to address
health and safety issues as determined by City in accordance with program
guidelines.
OFFICIAL RECORD
FIRST CONTRACT AMENDMENT CSC NO.45067 CITY SECiRETARV Rev. 10/2014
Priority Repair Program Fr.WORTH,TX Page 1
Javier Villagomez d/b/a GTO Construction
The first sentence of ARTICLE 5. TERM OF CONTRACT is amended to be and
read as follows:
"This Contract shall commence as of the Effective Date and shall automatically expire
upon the earlier of the expenditure of$300,000.00 or October 31, 2015 (the "Expiration
Date"), if not terminated sooner or extended as described below."
II.
Attachment C attached to the Contract is deleted and replaced with the attached
Attachment C Revised 10/2014.
III.
All other terms and conditions of City Secretary Contract No. 45067 not amended herein
remain unaffected and in full force and effect, are binding upon the Parties, and are hereby
ratified by the Parties. Capitalized terms not defined herein shall have meanings assigned to
them in the Contract.
[REMAINDER OF PAGE LEFT INTENTIONALLY BLANK]
FIRST CONTRACT AMENDMENT CSC NO.45067 Rev. 10/2014
Priority Repair Program Page 2
Javier Villagomez d/b/a GTO Construction
0'°000-
ACCEPTED AND AGREED. �p s
Cl 70
00
ATTEST: AJT T WORTH
it Se r Va ', Fernando Costa,Assistant City Manager
M&C C- 10/15/2013
APPR YED AST FO AND LEGALITY"
Vicki S. Ganske, Senior Assistant City Attorney
CONTRACTOR
By: 3
Ja ier lagom er
OFFICIAL RECORD
FIRST CONTRACT AMENDMENT CSC NO.45067 LUIY)Yf SEC RETARY ev. /2014
Priority Repair Program WORT H9`X Page 3
Javier Villagomez d/b/a GTO Construction
ATTACHMENT C Revised 11/2014
FORTWORTH
CITY OF FORT WORTH
DEPARTMENT OF HOUSING AND ECONOMIC DEVELOPMENT DEPARTMENT
1000 THROCKMORTON
FORT WORTH TEXAS 76102
PRIORITY REPAIR PROGRAM
FIRST CONTRACT AMENDMENT CSC NO. 45067
Javier Villagomez d/b/a GTO Construction
ITEMIZED BID TABS:
PLUMBING SERVICES: All services shall be completed in accordance to local code
requirements. "Contractor is responsible for securing permit (when applicable). All items
shall operate without leakage, noise, vibration or hammering. All penetrations of building
components hall be neat and sleeved where applicable. No solder containing lead shall be
used in any pipe or fixture damage to structural members from drilling or notching shall be
repaired.
1. Product or Service Type: GAS LINE:— Install new CSST corrugated Stainless Steel
tubing (Gastite's Flash Shield or PRO-FLEX) installation shall include all new shut off
valves and any labor or materials necessary to install and replace the existing lines
under the house. Contractor to apply and pay for all permits.
$110.00/material Drop + $95.00 installed/labor Drop = $205.00/per Drop
2. Product or Service Type: GAS LINE POLY YARD SERVICE LINE:— Install new YARD LINE
Poly-Digg 18" Depth with a tracer wire installed shall include new shut off valves and
any labor or materials necessary to install and replace the existing lines. Contractor to
apply and pay for all permits.
$15.00/material In Ft. + $24.00 installed/labor In Ft. = $39.00/cost
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.45067
Javier Villagomez d/b/a GTO Construction
Re 10/2014
3. HOURLY RATE FOR LABOR MASTER PLUMBER: Services will be provided Monday
through Friday between 7:00 am and 5:30 pm. Rate shall include trip charge, travel
time, mileage,transportation cost, parking and toll fees. Rate shall start upon arrival at
client home or worksite. "Contractor is responsible for securing permit, (when
applicable).
$83.00\Hourly Rate for Labor Cost
4. Product or Service Type:Specify Labor Rate for Plumbing Services(Plumber's Helper)
and related work not specified or mention under the RFP contract. Note: Rate shall
include trip charge, travel time, mileage, transportation cost, parking and toll fees. The
labor rate shall start upon arrival at client home or worksite. "Contractor is responsible
for securing permit (when applicable)
$42.00 1Hourly Rate for Labor Cost.
5. Product or Service Type: Emergency Flood Stop Valve Unit-Water Heaters:
$160.00/material cost each +$65.00 installed/labor each =$225.00/each
6. Product or Service Type: Emergency Flood Stop Valve Unit-A/C drain Pan:
$100.00/material cost each +$65.00 installed/labor each =$165.00/each
7. Product or Service Type: Faucet e Kitchen -Single handle kitchen faucet with sprayer,
supply lines and shut off valves. Finish: Chrome:
$90.00/material cost each+$60.00 installed/labor each =$150.00/each
Specify Manufacturer Brand and Series Being Proposed:DELTA/Glacier bay
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.45067
Javier Villagomez d/b/a GTO Construction
Re 10/2014
8. Product or Service Tvpe: Faucet–Kitchen– Dual Control kitchen faucet with sprayer,
supply lines and shut off valves. Finish: Chrome:
$80.00/material cost each +$60.00 installed/labor each =$140.00/each
Specify Manufacturer Brand and Series Being Proposed:DELTA/Glacier bay
9. Product or Service Type: Faucet–Bathroom-Two handle bathroom faucet with pop-
up assembly, drain, supply lines and shut off valves. Finish: Chrome:
$60.00/material cost each +$75.00 installed/labor each =$135.00/each
Specify Manufacturer Brand and Series Being Proposed: DELTA/Glacier bay
10. Product or Service Type:Shower Diverter Faucet Valve Complete–Bathroom -: Install
a dual control valve, metal shower diverter faucet valve. Finish: Chrome:
$75.00/material cost each +$150.00 installed/labor each =$225.00/each
Specify Manufacturer Brand and Series Being Proposed:DELTA/Glacier bay
11. Product or Service Type:TUB Dual Control Faucet Valve Complete–Bathroom-: Install
a metal, dual control, tub fill faucet valve complete. Finish: Chrome:
$75.00/material cost each +$150.00 installed/labor each = $225.00/each
Specify Manufacturer Brand and Series Being Proposed:DELTA/Glacier bay
12.WATER SERVICE—PEX LINE: Excavate to 36", lay 1" PEX pipe and refill trench for water
service. Lay line without joints from meter hub to main shut off valve inside structure.
Contractor to apply and pay for all permits. Backfill disturbed yard areas.
$10.00/material per In ft. +$25.00 installed/labor per In ft. =$35.00/total cost
13.SHUT OFF VALVE: Install Chromed brass shut-off valve on existing fixture supply line.
$15.00/material each+$25.00 installed/labor each. =$40.00/total cost
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.45067
Javier Villagomez d/b/a GTO Construction
Re 10/2014
14. ROD AND CLEAN DRAINS: Rod and clean drain lines at all fixtures to clear lines for
fixtures to main street sewer.
$20.00/material each +$75.00 installed/labor each. =$95.00/total cost
15. DRAIN-WASTE-VENT-PVC: Install schedule 40 PVC pipe and fittings, solvent welded
after a dyed cleaning step. Install pipe with hangers 3' on center without critical damage
to structural members.
$15.00/material per In ft. +$25.00 installed/labor per In ft. =$40.00/total cost
16.SEWER SERVICE-4" PVC: Install a 4" PVC sewer line from structure and connect to the
public sanitary sewer system. Install clean-outs as required. Re-grade yard in work area,
sow grass seed and spread straw to reestablish lawn. Contractor to apply and pay for
all permits.
$25.00/material per In ft. +$18.00 installed/labor per In ft. =$43.00/total cost
17. GAS LINE—PRESSURE TEST: Cap all gas lines prior to filling the distribution system
with 5-8 lbs. of compressed air. Maintain pressure for at least 30 minutes. Locate and
seal minor any leaks in the system.
$20.00/material each +$230.00 installed/labor each. =$250.00/total cost
18. GAS LINE–SCHEDULE 40 STEEL: Hang 3/4" main and 1/2" fixture gas supply lines of
schedule 40 black steel pipe with malleable iron screwed fittings. Install brass stop
valves at all equipment.
$10.00/material per In ft. +$27.00 installed/labor per In ft. = $37.00/total cost
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.45067
Javier Villagomez d/b/a GTO Construction
Re 10/2014
WATER HEATERS: Installation cost shall include all travel time, trip charge, labor &
equipment/material/supplies required to install complete new water heater. Install a glass
lined, high recovery, insulated, gas water heater with a 6-year warranty (electric water
heater when applicable). Use A. O. Smith or approved equal. Installation cost shall include
new double wall vent pipes, collard, new gas line, "drip leg" new T&P lines, new roof
flue/jack stack-complete, pan and pipe insulation. Unit must meet city code and must be
raised 18" from elevation (when applicable). The removal of existing water heater and
proper disposal shall be in accordance to EPA regulation. "Contractor is responsible for
securing permit."
19. WATER HEATER-30 GALLON GAS:
$500.00/material each + $700.00 installed/labor each. = $1,200.00/total cost
20. WATER HEATER-40 GALLON GAS:
$500.00/material each + $700.00 installed/labor each. = $1,200.00/total cost
21. WATER HEATER-50 GALLON GAS:
$500.00/material each + $700.00 installed/labor each. = $1,200.00/total cost
22. WATER HEATER-30 GALLON ELECTRIC:
$545.00/material each + $400.00 installed/labor each. = $945.00/total cost
23. WATER HEATER-40 GALLON ELECTRIC:
$560.00/material each + $400.00 installed/labor each. = $960.00/total cost
24. WATER HEATER-50 GALLON ELECTRIC:
$602.00/material each + $400.00 installed/labor each. = $1,002.00/total cost
BID TABS
FIRST CONTRACT AMEN DM ENT CSC NO.45067
Javier Villagomez d/b/a GTO Construction
Re 10/2014
25. WATER SUPPLY PEX-1 BATH HOUSE: Remove all water supply from main shut off valve
inside structure. Install PEX type 3/4" fixture grouping trunk/manifold, and 3/8"
individual supply lines to service one 3 piece bath, water heater, kitchen and laundry
area. Follow Manufacture Installation Guide using all PEX fittings, and crimp rings, shall
be complete, code compliant, fully usable, and include shut-off valves, chromed fixture
supply lines and air gaps. Insulate all pipes where applicable to include over the attic
areas.
$42.31/material per drop+$189.69 installed/labor per drop= $225.00/total cost
26.WATER SUPPLY PEX-2 BATH HOUSE: Remove all water supply from main shut off valve
inside structure. Install PEX type 3/4" fixture grouping trunk/manifold, and 3/8"
individual supply lines to service two 3 piece bath, water heater, kitchen and laundry
area. Follow Manufacture Installation Guide using all PEX fittings, and crimp rings, shall
be complete, code compliant, fully usable, and include shut-off valves, chromed fixture
supply lines and air gaps. Insulate all pipes where applicable to include over the attic
areas.
$42.31/material per drop+$189.69 installed/labor per drop =.$225.00/total cost
27.WATER SUPPLY PEX-3 BATH HOUSE: Remove all water supply from main shut off valve
inside structure. Install PEX type 3/4" fixture grouping trunk/manifold, and 3/8"
individual supply lines to service two 3 piece bath, water heater, kitchen and laundry
area. Follow Manufacture Installation Guide using all PEX fittings, and crimp rings, shall
be complete, code compliant, fully usable, and include shut-off valves, chromed fixture
supply lines and air gaps. Insulate all pipes where applicable to include over the attic
areas
$42.31/material per drop+$189.69 installed/labor per drop = $225.00/total cost
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.45067
Javier Villagomez d/b/a GTO Construction
Re 10/2014
Complete System:-Central Air-Conditioner and Gas Furnace Complete: Installation cost shall
include all labor, material, and supplies required to install new unit in accordance to
manufacturer requirements and removal of existing unit and proper disposal in accordance
with EPA regulation. Installation shall also include condenser, gas furnace, and evaporator coil.
If needed or existing piece is not working or functional install drain pans with working drain
lines, duct and flue modification, filter enclosure, power disconnect/whip, liquid line dyer,
suction line dryer, refrigerant, and plastic pad if needed. Gas furnace to include the vent stack
complete, insulated and; or sealed in accordance to local code requirements. "Contractor is
responsible for securing permit.
28. Complete System A/C &Gas Furnace: Size: 2 Tons, 14 SEER Rating and 80%AFUE
Furnace Types: Up-flow, Down-flow and Horizontal:
$1,350.00/material cost+$2,898.00 installed/labor cost=$4,248.00/each
Specify Manufacturer Brand and Series Being Proposed: Goodman/Lennox
29. Complete System A/C&Gas Furnace, Size: 2.5 Tons, SEER Rating: 14, AFUE: 80%
Annual Fuel Utilization Efficiency or higher Configuration Types: Up-flow, Down-flow
and Horizontal:
$1,450.00/material cost+$2,900.00 installed/labor cost=$4,350.00/each
Specify Manufacturer Brand and Series Being Proposed: Goodman/Lennox
30.Complete System A/C&Gas Furnace, Size: 3 Tons, SEER Rating: 14,AFUE: 80%Annual
Fuel Utilization Efficiency or higher Configuration Types: Up-flow, Down-flow and
Horizontal:
$1,500.00/material cost+$3,000.00 installed/labor cost=$4,500.00/each
Specify Manufacturer Brand and Series Being Proposed: Goodman/Lennox
31.Complete System A/C&Gas Furnace, Size: 3.5 Tons, SEER Rating: 14, AFUE: 80%
Annual Fuel Utilization Efficiency or higher Configuration Types: Up-flow, Down-flow
and Horizontal:
$1,500.00/material cost+$3,215.00 installed/labor cost=$4,715.00/each
Specify Manufacturer Brand and Series Being Proposed: Goodman/Lennox
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.45067
Javier Villagornez d/b/a GTO Construction
Re 10/2014
32. Complete System A/C&Gas furnace, Size: 4 Tons, SEER Rating: 14, AFUE: 30%Annual
Fuel Utilization Efficiency or higher Configuration Types: Up-flow, Down-flow and
Horizontal:
$1,200.00/material cost+$2,225.00 installed/labor cost=$3,425.00/each
Specify Manufacturer Brand and Series Being Proposed: Goodman/Lennox
Central Air Conditioner Unit(Outside Unit Only): Installation cost shall include all labor,
material and supplies required to install new unit in accordance to manufacturer (s)
requirements, removal of existing unit and properly disposal in accordance with EPA
regulation. Installation shall also include condenser power disconnect/whip, liquid line dryer,
section line dryer, refrigerant and plastic pad, if needed. "Contractor is responsible for securing
permit (when applicable).
33. Central Air Conditioner Unit, Size: 1.5 Tons, SEER Rating: 14 EER Rating:
$600.00/material cost+$1,396.00 installed/labor cost=$1,996.00/each
Specify Manufacturer Brand and Series Being Proposed: Goodman/Lennox
Specify cost for replacement of evaporator/cooling coil (if required)
$350.00/material cost+$205.00 installed/labor cost=$555.00/each
34. Central Air Conditioner Unit, Size: 2 Tons, SEER Rating: 14 EER Rating:
$1,000.00/material cost+ $1,399.00 installed/labor cost= $2,399.00/each
Specify Manufacturer Brand and Series Being Proposed: Goodman/Lennox
Specify cost for replacement of evaporator/cooling coil (if required)
$400.00/material cost+$205.00 installed/labor cost=$605.00/each
35. Central Air Conditioner Unit,Size: 2.5 Tons, SEER Rating: 14 EER Rating:
$1,000.00/material cost+$1,449.00 installed/labor cost= $2,449.00/each
Specify Manufacturer Brand and Series Being Proposed: Goodman/Lennox
$400.00/material cost+$205.00 installed/labor cost= $605.00/each
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.45067
Javier Villagomez d/b/a GTO Construction
Re 10/2014
36. Central Air Conditioner Unit, Size: 3 Tons, SEER Rating: 14 EER Rating
$1,000.00/material cost+ $1,500.00 installed/labor cost = $2,500.00/each
Specify Manufacturer Brand and Series Being Proposed: Goodman/Lennox
Specify cost for replacement of evaporator/cooling coil (if required)
$415.00/material cost + $205.00 installed/labor cost = $620.00/each
37. Central Air Conditioner Unit, Size: 3.5 Tons, SEER Rating: 14 EER Rating
$1,000.00/material cost+ $1,500.00 installed/labor cost = $2,500.00/each
Specify Manufacturer Brand and Series Being Proposed: Goodman/Lennox
Specify cost for replacement of evaporator/cooling coil (if required)
$415.00/material cost+ $205.00 installed/labor cost = $620.00/each
38. Central Air Conditioner Unit, Size:4 Tons, SEER Rating: 14 EER Rating
$500.00/material cost + $1,700.00 installed/labor cost = $2,200.00/each
Specify Manufacturer Brand and Series Being Proposed: Goodman/Lennox
Specify cost for replacement of evaporator/cooling coil (if required)
$475.00/material cost + $200.00 installed/labor cost = $675.00/each
Preventive Maintenance and Tune-up Services:
39. Air Conditioning System (cooling)-PM and Tune-up Services: To include all labor,
chemicals material and supplies required to perform the services.
$250.00/per unit
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.45067
Javier Villagomez d/b/a GTO Construction
Re 10/2014
40. Heat/Furnace-PM and Tune-up Services:To include all labor, material and supplies
required to perform the services.
$150.00/per unit
41. Condenser Coil Cleaning Services(only):To include all labor, chemicals, materials and
supplies required to perform the services.
$150.00/peg°unit
42. Evaporator/Cooling Coil Cleaning Services(only): To include all labor, chemicals,
materials and supplies required to perform the services.
$150.00/per unit
Duct Sealing and Repair Services: Duct Sealing and Repair Services:Vapor barrier must be
placed to the outside with no exposed insulation. Insulation should cover all exposed supply
and return ducts with no significant areas of bare duct left un-insulated. Insulation should be
attached with Stuck ups, twine, or plastic straps.
43. Product or Service Tvpe: Duct Seal Services with mastic/board:
$33.00/flat fee per duct
44. Product or Service Tvpe: Plenum Supply Seal Services with mastic/board:
$45.00/flat fee
45. Product or Service Type: Plenum Return Seal Services with mastic:
$55.00/flat fee
46. Product or Service Type: Register Replacement: To include all labor, material, supplies,
and equipment to install new adjustable, curved blade, with shutter damper register
and mastic sealant:
$25.00/flat fee
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.45067
Javier Villagomez d/b/a GTO Construction
Re 10/2014
47. Product or Service Type: Duct Replacement Services Supply Opening: To include all
labor, material, supplies, and equipment to seal and install new R-8 value or better duct
insulation to include a new adjustable curved blade with shutter damper mister and
mastic sealant:
$95.00/per Run/drop
HEATING VENTILATION AND AIR CONDITIONING (HVAC)--GENERAL REQUIREMENTS:
Equipment shall operate safely without leakage, noise, or vibration. All penetration of building
components shall be neat,sleeved and fire stopped and shall not compromise structural
integrity. Contractor shall submit a diagram, and must use the Air Conditioning Contractors of
America (ACCA) Manual J Heat loss calculation tool http://www.acca.org/tech/manualj/), and
use ACCA's Manual S for equipment selection. Size of furnace selected should be matched to
the living unit considering any areas which may be added or subtracted from the plan plus
meet the current Energy Code requirements adopted by the City to efficiently heat the
structure.
48. HOURLY RATE FOR LABOR COST HVAC:Service and related work: Services will be
provided Monday through Friday between 7:00 am and 5:30 pm. Rate shall include trip
charge, travel time, mileage, transportation cost, parking and toll fees. Rate shall start
upon
$80.00\Hourly Rate for Labor Cost
CENTRAL GAS FURNACE:–Complete install–Efficiency or higher configuration types: Up-flow,
Down-flow and Horizontal. Central Heat/Furnace all installations shall be code compliant, a
mechanical permit is required. Installation cost shall include all labor, material and supplies
required to install new unit in accordance with manufacturer requirements, removal of existing
unit and properly disposal in accordance with EPA regulation. Installation shall also include,
vent flue- complete with outside roof jack and flashing, new gas valve if applicable,gas lines
and shut off valve, if applicable, duct modification if needed. Unit shall be properly vented,
insulated and/or sealed in accordance to local code requirements (including high low vents).
49. FURNACES—GAS 36,000 BTU:
$491.00/materials each +$995.00 installed/labor each =$1,486.00/total
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.45067
Javier Villagomez d/b/a GTO Construction
Re 10/2014
50. FURNACES—GAS 42,000 BTU:
$497.00/materials each+$995.00 installed/labor each =$1,492.00/total
51. FURNACES—GAS 50,000 BTU:
$460.00/materials each+$995.00 installed/labor each =$1,455.00/total
52. FURNACES—GAS 70,000 BTU:
$492.00/materials each+$995.00 installed/labor each =$1,487.00/total
53. FURNACES—GAS 75,000 BTU:
$502.00/materials each+$995.00 installed/labor each =$1,497.00/total
54. FURNACES—GAS 80,000 BTU:
$504.00/materials each+$995.00 installed/labor each =$1,499.00/total
55. FURNACES—GAS 85,000 BTU:
$525.00/materials each+$995.00 installed/labor each =$1,520.00/total
56. FURNACES—GAS 90,000 BTU:
$605.00/materials each+$995.00 installed/labor each =$1,600.00/total
57. FURNACES—GAS 100,000 BTU:
$605.00/materials each+$995.00 installed/labor each =$1,600.00/total
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.45067
Javier Villagomez d/b/a GTO Construction
Re 10/2014
WALL VENTED FURNACE/WALL HEATER-GAS: Complete Install of a gas fired, wall mounted
heater including all gas line,wall mounted thermostat,flue piping complete through the roof
jack and flashing.
58.WALL VENTED FURNACE 35,000 GAS
$700.00/materials each +$600.00 installed/labor each = $1,300.00/total
59.WALL VENTED FURNACE 40,000 GAS
$750.00/materials each +$600.00 installed/labor each =$1,350.00/total
60.WALL VENTED FURNACE 50,000 GAS
$795.00/materials each +$600.00 installed/labor each =$1,395.00/total
HEAT PUMP SYSTEMS: Installation cost shall include all labor, material, and supplies required
to install new complete systems(with new air handler and matching coil) in accordance with
manufacturer requirements, removal of existing unit and proper disposal in accordance with
EPA regulation. Installation shall include new plastic pad, if needed, disconnect box, line set
cover if necessary and miscellaneous repairs.
61. HEAT PUMP-REPLACE 2TON UNIT: Complete heat-pump unit, 2 Ton System: High
Efficiency or higher Configuration Types: Up-flow, Down-flow and Horizontal
$1,780.00/Materials each +$1,225.00 installed/labor each =$3,005.00/Total
62. HEAT PUMP-REPLACE 2.5TON UNIT: Complete heat-pump unit, 2.5 Ton System: High
Efficiency or higher Configuration Types: Up-flow, Down-flow and Horizontal
$2,003.00/Materials each +$1,225.00 installed/labor each =$3,228.00/Total
63. HEAT PUMP-REPLACE 3TON UNIT: Complete heat-pump unit, 3 Ton System: High
Efficiency or higher Configuration Types: Up-flow, Down-flow and Horizontal
$2,165.00/Materials each +$1,225.00 installed/labor each = $3,390/Total
64. HEAT PUMP-REPLACE 3.5TON UNIT: Complete heat-pump unit, 3.5 System: High
Efficiency or higher Configuration Types: Up-flow, Down-flow and Horizontal
$2,216.00/Materials each +$1,225.00 installed labor each = $3,441.00/Total
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.45067
Javier Villagomez d/b/a GTO Construction
Re 10/2014
65. HEAT PUMP-REPLACE 4T®N UNIT: Complete heat-pump unit, 54,000 BTU System: High
Efficiency or higher Configuration Types: Up-flow, Down-flow and Horizontal
$2,437.00/Materials each +$1,225.00 installed/labor each =$3,662.00/Total
Access covers for attics, and crawlspaces: All services shall be completed in accordance to
local code requirements. "Contractor is responsible for securing permit (when applicable).
66. Product or Service Type: Create an attic access—new, where none previously existed
(install in closet or hallway/where possible) Install painted wood trim for a finished
appearance for new access. %" plywood painted panel; to include insulation barrier,
weather-stripping and R-19 or greater insulation pillow:
$125.00/flat fee
67. Product or Service Type: Install Wood Attic Ladder with 2501b Maximum Load
Capacity. Install in accordance with manufacturer's specifications and in accordance
with local building code. Install where applicable. Install painted wood trim for a
finished appearance for new access and weather-stripping.
$250.00/material each +$100.00 installed/labor each =$350.00/cost
63. Product or Service Type: Install acres-exterior—new, where none existed previously
exterior%"treated plywood, 2x4 treated lumber for framing, 2 zinc barrel bolts:
$75.00/flat fee
ELECTRICAL SERVICES : All Materials shall be UL approved and or National Electrical Code
rated. All drilling, cutting and fastening shall be near and true and shall not critically damage
framing members.All cost must include the removal and disposal of existing units.
69. Product or Service Tvpe: GFCI Receptacle/Plug: Install a flush mounted, ground fault
circuit interrupted ivory duplex receptacle adjacent to lavatory using copper romex.
Fish wire and repair all tear out.
$35.00/material each +$90.00 installed/labor each =$125.00/each
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.45067
Javier Villagomez d/b/a GTO Construction
Re 10/2014
70. Product or Service TVpe: GECI EXTERIOR Receptacle/Plug: Install a flush mounted,
ground fault circuit interrupted duplex receptacle adjacent appropriate for exterior use
using copper romex. Fish wire and repair all tear out.
$45.00/material each +$105.00 installed/labor each = $150.00/each
71. Product or Service TVpe: INSTALL RECEPTACLE--15 Install an ivory, duplex, 15 amp
receptacle and ivory cover plate at least 15" above floor level using copper 12-3 non-
metallic (NM) cable. Fish wire and repair all tear out.
$25.00/material each +$75.00 installed/labor each =$100.00/each
72. Product or Service TVpe: INSTALL RECEPTACLE--20 Install an ivory, duplex, 15 amp
receptacle and ivory cover plate at least 15" above floor level using copper 12-3 non-
metallic(NM) cable. Fish wire and repair all tear out.
$30.00/material each +$75.00 installed/labor each =$105.00/each
73. Product or Service TVpe: INSTALL NEW SWITCH WALL RECEPTACLE: Install a single
pole, ivory switch no more than 48" above the floor with ivory cover plate controlling
and using copper 12-3 non-metallic(NM) cable. Fish wire and repair all tear out.
$25.00/material each +$75.00 installed/labor each = $100.00/each
74. Product or Service Type: INSTALL SMOKE DETECTOR--HARD WIRED--
INTERCONNECTED Install a UL approved, ceiling mounted smoke and heat detector
permanently wired into a receptacle box with battery back-up and interconnected with
all other smoke detectors in the unit.
$50.00/material each +$100.00 installed/labor each = $150.00/
75. Product or Service TVpe: REPLACE LIGHT SWITCH Replace light switch with single pole,
ivory toggle switch and ivory plastic cover plate.
$30.00/material each +$70.00 installed/labor each =$100.00/each
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.45067
Javier Villagomez d/b/a GTO Construction
Re 10/2014
76. Product or Service Type: INSTALL WASHER CIRCUIT 110\20 AMP Install a flush or
surface mounted duplex outlet for a washing machine on a separate 20 amp circuit
using#12 copper Romex.
$55.00/material each+$145.00 installed/labor each =$200.00/each
77. Product or Service TVpe: INSTALL DRYER CIRCUIT--30 AMP Install 220 volt,30 amp,
surface mounted receptacle on an individual circuit (#8 Cooper Romex).
$75.00/material each +$145.00 installed/labor each =$200.00/each
78. Product or Service Type: INSTALL KITCHEN RANGE/OVEN--30 AMP Install 220 volt, 30
amp, surface mounted receptacle on an individual circuit (#8 Cooper Romex) .
$75.00/material each +$150.00 installed/labor each =$225.00/each
79. Product or Service Type: LIGHT FIXTURE COMPLETE: Flush mounted celling light fixture
to include light bold.
$15.00/material each +$60.00 installed/labor each=$75.00/each
80. ELECTRIC SERVICE-150 AMP: Replace existing electrical service with a residential, 150
amp, single phase, 3 wire electric service. Include a main disconnect, 22 circuit panel
board, meter socket, weather head, service cable, and ground rod and cable. Seal all
exterior service penetration. New electrical service must meet city code. Dispose of old
electric service to code legal dump.
$650.00/Materials each +$1,650.00 installed/labor each =$2,300.00/Total
81. ELECTRIC SERVICE-200 AMP: Replace existing electrical service and install a 200 amp,
main disconnect, 110/220 volt, 24 circuit panel board, meter socket, weather head,
service cable, and ground rod and cable. Seal all exterior service penetration. New
electrical service must meet city code. Dispose of old electric service to code legal
dump.
$700.00/Materials each+$1,750.00 installed/labor each =$2,450.00/Total
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.45067
Javier Villagomez d/b/a GTO Construction
Re 10/2014
82.Carbon Monoxide Alarm: Operated Unit. Alarm must be installed in accordance with
the manufactures recommendation.
$21.00/Materials each +$12 installed/labor each =$33.00/Total
83. Product or Service Type: Specify Labor Rate for Electrical Services: Rate shall include
trip charge, travel time, mileage, transportation cost.The labor rate shall start upon
arrival at client home or worksite. "Contractor is responsible for securing permit (when
applicable).
$83.00/1-lourly
Cabinets, Countertops, Sinks and Related Products: All services shall be completed in
accordance to local code requirements. "Contractor is responsible for securing permit(when
applicable).All cost must include the removal and disposal of existing units.
84. Product or Service Type: Bathroom Cabinet/Vanity Base—Single 24": Reinstall existing
countertop and faucet,securely attached to cabinet/vanity. Provide and install new
midline series bathroom cabinet/vanity. All work to be level, plumb, and true. Seal all
holes and openings where pipes, wires and other materials may come through cabinets
with removable material such as "Thumb Gum" to keep out any rodents. Also attach
cabinet to studs in walls. Caulk all seams where countertop meets walls.
$75.00/material each+$125.00 installed/labor each=$200.00/each
85. Product or Service Type: Bathroom Cabinet/Vanity Base—Single 36": Reinstall existing
countertop and faucet, securely attached to cabinet/vanity. Provide and install new
midline series bathroom cabinet/vanity. All work to be level, plumb, and true. Seal all
holes and openings where pipes, wires and other materials may come through cabinets
with removable material such as "Thumb Gum" to keep out any rodents. Also attach
cabinet to studs in walls. Caulk all seams where countertop meets walls.
$80.00/material each +$145.00 installed/labor each =$225.00/each
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.45067
Javier Villagomez d/b/a GTO Construction
Re 10/2014
86. Product or Service Type: Bathroom Cabinet/Vanity Complete—Single 24": Must
include cabinet, sink, faucet, trap, shut-off valves, pop-up drain, caulk, supply lines, etc.:
Install new vanity w/sink complete to local code requirements. All work to be level, plumb,
and true. Seal all holes and openings where pipes, wires and other materials may come
through cabinets with removable material such as "Thumb Gum" to keep out any rodents.
$165.00/material each +$238.00 installed/labor each =$403.00/each
87. Product or Service Type: Bathroom Cabinet/Vanity Complete—Single 36": Must
include cabinet, sink,faucet, trap, shut-off valves, pop-up drain, caulk, supply lines, etc.:
Install new vanity w/sink complete to local code requirements. All work to be level, plumb,
and true. Seal all holes and openings where pipes, wires and other materials may come
through cabinets with removable material such as "Thumb Gum" to keep out any rodents.
$185.00/material each +$365.00 installed/labor each=$550.00/each
88. Product or Service Type: 3 Piece Fiberglass Tub Wall Kit and trim, to include demo of
existing unit and must include new green sheetrock, tub caulking and finish:
$264.00/material each +$250.00 installed/labor each =$514.00/each
89. Product or Service TVpe: FRP Wall Board Size:4 x 8, Color-White:
$30/material sq.ft. +$2.10 installed/labor sq.ft. =$3.70/sq.ft.
90. SHEETROCK/DRYWALL%" : Remove old drywall and dispose. Use a 3 coat process, set
tape in bed coat; apply two coats topping compound. Allow drying time; sand-finish
coats smooth to paint ready. Price shall be based on a minimum of 32 sq. ft.
$2.00/Materials Sq. Ft.+$1.33 installed/labor Sq. Ft. =$3.33/Total
91. SHEETROCK/GREEN BOARD-1/2: Remove old drywall and dispose. Apply two coats
topping compound. Allow drying time; sand-finish coats smooth. Price shall be based on
a minimum of 32 sq. ft.
$2.25/Materials Sq. Ft. +$1.50 installed/labor Sq. Ft. = $3.75/Total
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.45067
Javier Villagomez d/b/a GTO Construction
Re 10/2014
ROOF REPAIRS AND SERVICES:All services shall be completed in accordance to local code
requirements. Contractor is responsible for securing permit.
92. ROOF REPLACMENT 3 Tab Composite Shingles: Tear off one layer and replace roof
complete. All roof work performed for this bid shall be warranted for a period of one
year following payment. This warranty covers problems such as leaks, loose shingles
and correcting, replacing or repairing other damage and/or problems that may result
from the faulty roof work. Standard roof work shall be bid to include installation of new
205 year'three tab', 15#felt paper,code approved venting, new drip edge, new vent
pipe boots, starter shingles for eves and rakes, ridge and gable cap shingles,and code
approved Work includes proper disposal of scrap and waste. Bid shall assume less
than 8/12 pitch roof.
$85.00/Materials SQ+$90.00 installed/labor SQ=$170.00/Total
93. ROOFING TEAR-OFF: Tear off each additional roofing layer(beyond one layer):
$20.00/SQ. Each Labor Cost
94. Product or Service Type: New Decking OSB : Tear off one layer and replace decking
complete. Standard roof work shall be bid to include installation of new decking
materials. Work includes proper disposal of scrap and waste. Roofs greater than 6/12
pitch additional costs will be considered on a case by case basis, costs bid below assume
less than 6/12 pitch:
$20.00/material cost SQ+$40.00 installed/labor cost per SQ= $60.00/SQ
95. Product or Service Type: Remove and dispose of Wood Shingles:Tear off one layer of
wood shingles and dispose properly per SQ.
Labor and disposal fee$20.00/flat fee per SQ
96. Product or Service Type: ROLL Roofing TORCH DOWN 90LB( labor includes removal of
existing and disposal):
$50.00/material cost SQ+$140.00 installed/labor cost per SQ=$190.00/SQ
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.45067
Javier Villagomez d/b/a GTO Construction
Re 10/2014
97. Product or Service Type:V Tech Modified ROLL Roofing(commercial grade torch
down):
$50.00/material cost SQ+$140.00 installed/labor cost per SQ= $190.00/SQ
Product or Service Type:TREE And Shrub Trimming(away from roof shingles: Cost must
include all labor and disposal:
98.Cost for 10 Cubic Yards (10 cubic yards=the size of a Volkswagen Beetle)
$200.00/flat fee
99. Cost for 5 Cubic Yards (5 cubic yards= %the size of a Volkswagen Beetle)
$100.00/flat fee
100. Cost for 2.5 (1/4) Cubic Yards(2.5 cubic yards=%the size of a Volkswagen
Beetle
$50.00/flat fee
Siding and Lumber and Related Services: All services shall be completed in accordance to
local code requirements. Remove damaged siding to the joint over nearest stud. Apply
matching pine siding to walls with galvanized nails. Break all seams over studs and paint wood
"Contractor is responsible for securing permit(when applicable).
101. Siding Pattern 105-109:a Install new siding 1 x 8-12, D-Grade SYP: Remove damaged
siding to the joint over nearest stud. Apply matching pine siding to walls with
galvanized nails. Break all seams over studs and paint wood.
$1.50/material In ft. +$1.50 installed/labor In ft.=$3.000ost
102. Siding Pattern 105-109: Install new siding 1x 6-12, D-Grade SYP: Remove
damaged siding to the joint over nearest stud. Apply matching pine siding to walls
with galvanized nails. Break all seams over studs and paint wood.
$1.50/material In ft. +$1.50 installed/labor In ft. =$3.000ost
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.45067
Javier Villagomez d/b/a GTO Construction
Re 10/2014
103. Siding Pattern 117: Install new siding 1 x 8-12, D-Grade SYP: Remove damaged
siding to the joint over nearest stud. Apply matching pine siding to walls with
galvanized nails. Break all seams over studs and paint wood.
$1.50/material In ft. +$1.50 installed/labor In ft. =$3.000ost
104. Siding Pattern 117: Siding—Install new siding 1 x 6—12, D-Grade SYP: Remove
damaged siding to the joint over nearest stud. Apply matching pine siding to walls
with galvanized nails. Break all seams over studs and paint wood.
$1.50/material In ft. +$1.50 installed/labor In ft. =$3.000ost
105. Siding Masonite:—Install new Masonite-lap sheet siding: Remove damaged siding to
the joint over nearest stud. Apply matching pine siding to walls with galvanized nails.
Break all seams over studs and paint wood.
$1.00/material In ft. +$2.00 installed/labor In ft. =$3.00/Cost
106. Product or Service Type: Siding—Install new Masonite-4 x 8 Sheet siding: Remove
damaged siding to the joint over nearest stud. Apply matching pine siding to walls
with galvanized nails. Break all seams over studs and paint wood.
$2.00/material Sq. Ft. +$2.00 installed/labor Sq. Ft. =$4.00/Sq. Ft.
107. LUMBER-1" X 2": Install a 1"x 2", #2 pine Fascia with bevel cut joints using galvanized
finish nails. Caulk over joints, and prime.
$1.00/material LN Ft. +$1.00 installed/labor LN Ft. =$2.00/total cost
108. LUMBER-1" X 4": Install a 1"x 4", #2 pine Fascia with bevel cut joints using galvanized
finish nails. Caulk over joints, and prime.
$1.00/material LN Ft.+$1.00 installed/labor LN Ft. =$2.00/total cost
109. LUMBER-1" X 6": Install a IN 6", #2 pine Fascia with bevel cut joints using galvanized
finish nails. Caulk over joints, and prime.
$1.25/material LN Ft.+$1.25 installed/labor LN Ft. _$2.50/total cost
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.45067
Javier Villagomez d/b/a GTO Construction
Re 10/2014
110. LUMBER-1" X B": Install a 1"x R", #2 pine Fascia with bevel cut joints using galvanized
finish nails. Caulk over joints, and prime.
$1.50/material LN Ft.+$1.50 installed/labor LN Ft. =$3.00/total cost
111. Product or Service Type: Floor Assembly Bathroom Floor: Remove and reinstall
all fixtures not built-in. Remove floor covering underlayment and expose floor joists.
Replace subflooring and any bad joist to restore floor to sound and level condition.
Install % underlayment and vinyl sheets good and shoe molding/1/4 round or colonial
molding. Correct all damage to walls and fixtures caused by removing/reinstalling.
$10.00/material Sq. Ft. +$20.00 installed/labor Sq. Ft. = $30.00/cost
112. LABRO RATE FOR CARPENTRY: Services and related work not specified or mention
under the RFP contract: Note: Rate shall include trip charge, travel time, mileage,
transportation cost and parking fees.The labor rate shall start upon arrival at client
home or worksite.
$40.00/Hourly Labor Cost
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.45067
Javier Villagomez d/b/a GTO Construction
Re 10/2014