HomeMy WebLinkAboutContract 45092-A1 CIVY SECRETS
COMTRACT NO.
FIRST AMENDMENT TO CITY SECRETARY
CONTRACT NO. 45092
WHEREAS, on October 31,2013,the City of Fort Worth("City") and IntegrityTexas
Construction Ltd., a limited partnership authorized to do business in the State of Texas
("Contractor)made and entered into City Secretary Contract No. 45092 (the"Contract) for
construction services for the City's Priority Repair Program.
WHEREAS,the Priority Repair Program provides up to $5,000.00 for home repairs for
eligible City homeowners for Priority 1 emergency repairs and Priority 2 repairs of failed
household mechanical systems to address health and safety issues as more particularly defined
by the program.
WHEREAS, the Contract was for a 1 year term beginning on the Effective Date and
provided for 4 additional 1 year terms;
WHEREAS, the Parties have agreed to extend the Contract for an additional 1 year term
beginning November 1, 2014 through October 31, 2015; and,
WHEREAS, it is the mutual desire of City and Contractor to amend the Contract to meet
Contract objectives.
NOW, THEREFORE, City and Contractor hereby agree to amend the Contract as
follows:
I.
ARTICLE 1. DEFINITIONS is amended by adding the following definitions:
"Effective Date"means November 1, 2014.
"Priority Repair Program" or"program"means the City's home repair program for
eligible low to moderate income homeowners adopted by the City Council in M&C G-
17589.
rry
ARTICLE 2. SCOPE OF SERVICES Section A. is amended to be and read as follows
r by adding the following as the first sentence.
r-n
z "A. The purpose of this Contract is to provide home repair services for the Priority
Repair Program. The services provided shall be either Priority 1 emergency
repairs or Priority 2 repairs of failed household mechanical systems to address
health and safety issues as determined by City in accordance with program
guidelines.
rOFFICIAL RECORD
FIRST CONTRACT AMENDMENT CSC NO.45092 SECRETARY Rev. 10/2014
Priority Repair Program IntegrityTexas Construction Ltd. WORTHS TX Page I
The first sentence of ARTICLE 5. TERM OF CONTRACT is amended to be and
read as follows:
"This Contract shall commence as of the Effective Date and shall automatically expire
upon the earlier of the expenditure of$300,000.00 or October 31, 2015 (the "Expiration
Date"), if not terminated sooner or extended as described below."
II.
Attachment C attached to the Contract is deleted and replaced with the attached
Attachment C Revised 10/2014.
III.
All other terms and conditions of City Secretary Contract No. 45092 not amended herein
remain unaffected and in full force and effect, are binding upon the Parties, and are hereby
ratified by the Parties. Capitalized terms not defined herein shall have meanings assigned to
them in the Contract.
[REMAINDER OF PAGE LEFT INTENTIONALLY BLANK]
FIRST CONTRACT AMENDMENT CSC NO.45092 Rev. 10/2014
Priority Repair Program
IntegrityTexas Construction Ltd. Page 2
( �b )A�
1% W+'V �VnO
Q'.
UG O�
ACCEPTED AND AGREED: , m� °8�y
ATTEST: FORT WORTH
�
City Secreta Fernando Costa,Assistant City Manager
M&C C-26508 0/15/2013
APPROVED AS TO FO AND LEGALITY"
Vicki S. Ganske, enior Assistant City Attorney
CONTRACTOR
By:
mon Hernandez,Managin Part r
rOFFICIAL Rf�CORD
Y SECRETARY.WORTH,TX
FIRST CONTRACT AMENDMENT CSC NO.45092 Rev. 10/2014
Priority Repair Program
IntegrityTexas Construction Ltd. Page 3
ATTACHMENT C Revised 11/2014
FORTWORTH
CITY OF FORT WORTH
DEPARTMENT OF HOUSING AND ECONOMIC DEVELOPMENT DEPARTMENT
1000 THROCKMORTON
FORT WORTH TEXAS 76102
PRIORITY REPAIR PROGRAM
FIRST CONTRACT AMENDMENT CSC NO. 45092
IntegrityTexas Construction Ltd.
ITEMIZED BID TABS:
Complete System:- Central Air-Conditioner and Gas Furnace Complete: Installation cost shall
include all labor, material, and supplies required to install new unit in accordance to
manufacturer requirements and removal of existing unit and proper disposal in accordance
with EPA regulation. Installation shall also include condenser, gas furnace, and evaporator coil.
If needed or existing piece is not working or functional install, drain pans with working drain
lines, duct and flue modification, filter enclosure, power disconnect/whip, liquid line dyer,
suction line dryer, refrigerant, and plastic pad if needed. Gas furnace to include the vent stack
complete, insulated and; or sealed in accordance to local code requirements. "Contractor is
responsible for securing permit.
1. Complete System A/C& Gas Furnace: Size: 2 Tons, 14 SEER Rating and 80%AFUE
Furnace Types: Up-flow, Down-flow and Horizontal:
$2,249.00/material cost + $2,000.00 installed/labor cost = $4,249.00/ each
Specify Manufacturer Brand and Series Being Proposed: RHEEM
2. Complete System A/C & Gas Furnace, Size: 2.5 Tons, SEER Rating: 14, AFUE: 80%
Annual Fuel Utilization Efficiency or higher Configuration Types: Up-flow, Down-flow
and Horizontal:
$2,299.00/material cost + $2,000.00 installed/labor cost =$4,299.00/ each
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.45092
Priority Repair Program IntegrityTexas Construction Ltd
Re 10/2014
Specify Manufacturer Brand and Series Being Proposed: RHEEM
3. Complete System A/C&Gas Furnace, Size: 3 Tons, SEER Rating: 14, AFUE: 80%Annual
Fuel Utilization Efficiency or higher Configuration Types: Up-flow, Down-flow and
Horizontal:
$2,405.00/material cost+$2,000.00 installed/labor cost=$4,404.00/each
Specify Manufacturer Brand and Series Being Proposed: RHEEM
4. Complete System A/C&Gas Furnace, Size: 3.5 Tons, SEER Rating: 14, AFUE: 80%
Annual Fuel Utilization Efficiency or higher Configuration Types: Up-flow, Down-flow
and Horizontal:
$2,509.00/material cost+$2,000.00 installed/labor cost=$4,509.00/each
Specify Manufacturer Brand and Series Being Proposed: RHEEM
5. Complete System A/C&Gas Furnace,Size: 4 Tons, SEER Rating: 14, AFUE: 80%Annual
Fuel Utilization Efficiency or higher Configuration Types: Up-flow, Down-flow and
Horizontal:
$2,568.00/material cost+$2,000.00 installed/labor cost=$4,568.00/each
Specify Manufacturer Brand and Series Being Proposed: RHEEM
6. Complete System A/C&Gas Furnace, Size: 5 Tons, SEER Rating: 14, AFUE: 80%Annual
Fuel Utilization Efficiency or higher Configuration Types: Up-flow, Down-flow and
Horizontal:
$2,775.00/material cost+$2,000.00 installed/labor cost=$4,775.00/each
Specify Manufacturer Brand and Series Being Proposed: RHEEM
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.45092
Priority Repair Program IntegrityTexas Construction Ltd
Re 10/2014
Central Air Conditioner Unit (Outside Unit Only): Installation cost shall include all labor,
material and supplies required to install new unit in accordance to manufacturer(s)
requirements, removal of existing unit and properly disposal in accordance with EPA
regulation. Installation shall also include condenser power disconnect/whip, liquid line dryer,
section line dryer, refrigerant and plastic pad, if needed. "Contractor is responsible for securing
permit (when applicable).
7. Central Air Conditioner Unit,Size: 1.5 Tons, SEER Rating: 14 EER Rating:
$950.00/material cost+$500.00 installed/labor cost=$1,450.00/each
Specify Manufacturer Brand and Series Being Proposed: RHEEM
Specify cost for replacement of evaporator/cooling coil (if required)
$345.00/material cost+ $200.00 installed/labor cost = $545.00/ each
8. Central Air Conditioner Unit, Size: 2 Tons,SEER Rating: 14 EER Rating:
$1,310.00/material cost+ $500.00 installed/labor cost= $1,810.00/each
Specify Manufacturer Brand and Series Being Proposed: RHEEM
Specify cost for replacement of evaporator/cooling coil (if required)
$390.00/material cost + $200.00 installed/labor cost = $589.00/each
9. Central Air Conditioner Unit, Size: 2.5 Tons, SEER Rating: 14 EER Rating:
$1,360.00/material cost+ $500.00 installed/labor cost= $1,860.00/each
Specify Manufacturer Brand and Series Being Proposed: RHEEM
Specify cost for replacement of evaporator/cooling coil (if required)
$390.00/material cost+ $200.00 installed/labor cost = $589.00/each
10. Central Air Conditioner Unit, Size: 3 Tons, SEER Rating: 14 EER Rating
$1,445.00/material cost +$500.00 installed/labor cost= $1,945.00/each
Specify Manufacturer Brand and Series Being Proposed: RHEEM
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.45092
Priority Repair Program IntegrityTexas Construction Ltd
Re 10/2014
Specify cost for replacement of evaporator/cooling coil (if required)
$410.00/material cost + $200.00 installed/labor cost = $610.00/ each
11. Central Air Conditioner Unit, Size: 3.5 Tons, SEER Rating: 14 EER Rating
$1,445.00/material cost+ $500.00 installed/labor cost=$1,945.00/each
Specify Manufacturer Brand and Series Being Proposed: RHEEM
Specify cost for replacement of evaporator/cooling coil (if required)
$410.00/material cost+$200.00 installed/labor cost = $610.00/each
12. Central Air Conditioner Unit, Size: 4 Tons, SEER Rating: 14 EER Rating
$1,490.00/material cost+ $500.00 installed/labor cost= $1,990.00/each
Specify Manufacturer Brand and Series Being Proposed: RHEEM
Specify cost for replacement of evaporator/cooling coil (if required)
$470.00/material cost+ $200.00 installed/labor cost= $670.00/each
13. Central Air Conditioner Unit, Size: 5 Tons, SEER Rating: 14 EER Rating
$1,560.00/material cost +$500.00 installed/labor cost= $2,060.00/each
Specify Manufacturer Brand and Series Being Proposed: RHEEM
Specify cost for replacement of evaporator/cooling coil (if required)
$520.00/material cost+ $200.00 installed/labor cost= $720.00/each
Preventive Maintenance and Tune-up Services:
14. Air Conditioning System (cooling)-PM and Tune-up Services:To include all labor,
chemicals material and supplies required to perform the services.
$120.00/per unit
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.45092
Priority Repair Program IntegrityTexas Construction Ltd
Re 10/2014
15. Heat/Furnace-PM and Tune-up Services:To include all labor, material and supplies
required to perform the services.
$120.00/per unit
16. Condenser Coil Cleaning Services (only):To include all labor, chemicals, materials and
supplies required to perform the services.
$120.00/per unit
17. Evaporator/Cooling Coil Cleaning Services(only):To include all labor, chemicals,
materials and supplies required to perform the services.
$212.00/per unit
Duct Sealing and Repair Services: Duct Sealing and Repair Services: Vapor barrier must be
placed to the outside with no exposed insulation. Insulation should cover all exposed supply
and return ducts with no significant areas of bare duct left un-insulated. Insulation should be
attached with Stuck ups, twine, or plastic straps.
18. Product or Service Type: Duct Seal Services with mastic/board:
$35.00/flat fee per duct
19. Product or Service Type: Plenum Supply Seal Services with mastic/board:
$50.00/flat fee
20. Product or Service Type: Plenum Return Seal Services with mastic:
$60.00/flat fee
21. Product or Service Type: Register Replacement:To include all labor, material, supplies,
and equipment to install new adjustable, curved blade, with shutter damper register
and mastic sealant:
$55.00/flat fee
22. Product or Service Type: Duct Replacement Services Supply Opening:To include all
labor, material, supplies, and equipment to seal and install new R-8 value or better duct
insulation to include a new adiustable curved blade with shutter damper mister and
mastic sealant:
$110.00/per Run/drop
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.45092
Priority Repair Program IntegrityTexas Construction Ltd
Re 10/2014
HEATING VENTILATION AND AIR CONDITIONING (HVAC)--GENERAL REQUIREMENTS:
Equipment shall operate safely without leakage, noise, or vibration. All penetration of building
components shall be neat, sleeved and fire stopped and shall not compromise structural
integrity. Contractor shall submit a diagram, and must use the Air Conditioning Contractors of
America (ACCA) Manual J Heat loss calculation tool http://www.acca.org/tech/manualj/), and
use ACCA's Manual S for equipment selection. Size of furnace selected should be matched to
the living unit considering any areas which may be added or subtracted from the plan plus
meet the current Energy Code requirements adopted by the City to efficiently heat the
structure.
23. HOURLY RATE FOR LABOR COST HVAC: Service and related work: Services will be
provided Monday through Friday between 7:00 am and 5:30 pm. Rate shall include trip
charge, travel time, mileage, transportation cost, parking and toll fees. Rate shall start
upon
$80.00\Hourly Rate for Labor Cost
CENTRAL GAS FURNACE:–Complete install –Efficiency or higher configuration types: Up-flow,
Down-flow and Horizontal. Central Heat/Furnace all installations shall be code compliant, a
mechanical permit is required. Installation cost shall include all labor, material and supplies
required to install new unit in accordance with manufacturer requirements, removal of existing
unit and properly disposal in accordance with EPA regulation. Installation shall also include,
vent flue- complete with outside roof lack and flashing, new gas valve if applicable,gas lines
and shut off valve, if applicable, duct modification if needed. Unit shall be properly vented,
insulated and/or sealed in accordance to local code requirements (including high low vents).
24. FURNACES—GAS 36,000 BTU:
$491.00/materials each + $995.00 installed/labor each =$1,486.00/total
25. FURNACES—GAS 42,000 BTU:
$497.00/materials each+$995.00 installed/labor each =$1,492.00/total
26. FURNACES—GAS 50,000 BTU:
$460.00/materials each +$995.00 installed/labor each =$1,455.00/total
27. FURNACES—GAS 70,000 BTU:
$492.00/materials each +$995.00 installed/labor each =$1,487.00/total
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.45092
Priority Repair Program IntegrityTexas Construction Ltd
Re 10/2014
28. FURNACES—GAS 75,000 BTU:
$502.00/materials each +$995.00 installed/labor each =$1,497.00/total
29. FURNACES—GAS 80,000 BTU:
$504.00/materials each+$995.00 installed/labor each =$1,499.00/total
30. FURNACES—GAS 85,000 BTU:
$525.00/materials each+$995.00 installed/labor each =$1,520.00/total
31. FURNACES—GAS 90,000 BTU:
$542.00/materials each +$995.00 installed/labor each =$1,537.00/total
32. FURNACES—GAS 100,000 BTU:
$605.00/materials each +$995.00 installed/labor each =$1,600.00/total
HEAT PUMP SYSTEMS: Installation cost shall include all labor, material, and supplies required
to install new complete systems(with new air handler and matching coil) in accordance with
manufacturer requirements, removal of existing unit and proper disposal in accordance with
EPA regulation. Installation shall include new plastic pad, if needed, disconnect box, line set
cover if necessary and miscellaneous repairs.
33. HEAT PUMP-REPLACE 2TON UNIT: Complete heat-pump unit, 2 Ton System: High
Efficiency or higher Configuration Types: Up-flow, Down-flow and Horizontal
$1,780.00/Materials each +$1,225.00 installed/labor each =$3,005.00/Total
34. HEAT PUMP-REPLACE 2.5TON UNIT: Complete heat-pump unit, 2.5 Ton System: High
Efficiency or higher Configuration Types: Up-flow, Down-flow and Horizontal
$2,003.00/Materials each +$1,225.00 installed/labor each =$3,228.00/Total
35. HEAT PUMP-REPLACE 3TON UNIT: Complete heat-pump unit, 3 Ton System: High
Efficiency or higher Configuration Types: Up-flow, Down-flow and Horizontal
$2,165.00/Materials each +$1,225.00 installed/labor each =$3,390/Total
36. HEAT PUMP-REPLACE 3.5TON UNIT: Complete heat-pump unit, 3.5 System: High
Efficiency or higher Configuration Types: Up-flow, Down-flow and Horizontal
$2,216.00/Materials each +$1,225.00 installed/labor each =$3,441.00/Total
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.45092
Priority Repair Program IntegrityTexas Construction Ltd
Re 10/2014
37. HEAT PUMP-REPLACE 4TON UNIT: Complete heat-pump unit, 54,000 BTU System: High
Efficiency or higher Configuration Types: Up-flow, Down-flow and Horizontal
$2,437.00/Materials each +$1,225.00 installed/labor each = $3,662.00/Total
Access covers for attics and crawlspaces:All services shall be completed in accordance to
local code requirements. "Contractor is responsible for securing permit (when applicable).
38. Product or Service Type: Create an attic access—new, where none previously existed
(install in closet or hallway/where possible) Install painted wood trim for a finished
appearance for new access. %" plywood painted panel; to include insulation barrier,
weather-stripping and R-19 or greater insulation pillow:
$85.00/flat fee
39. Product or Service Type: Install Wood Attic Ladder with 2501b Maximum Load
Capacity. Install in accordance with manufacturer's specifications and in accordance
with local building code. Install where applicable. Install painted wood trim for a
finished appearance for new access and weather-stripping.
$125.00/material each +$225.00 installed/labor each =$350.00/cost
40. Product or Service Type: Install acces-exterior—new, where none existed previously
exterior%" treated plywood, 2x4 treated lumber for framing, 2 zinc barrel bolts:
$85.00/flat fee
PLUMBING SERVICES:All services shall be completed in accordance to local code
requirements. "Contractor is responsible for securing permit(when applicable). All items
shall operate without leakage, noise,vibration or hammering. All penetrations of building
components hall be neat and sleeved where applicable. No solder containing lead shall be
used in any pipe or fixture damage to structural members from drilling or notching shall be
repaired.
1. HOURLY RATE FOR LABOR MASTER PLUMBER: Services will be provided Monday
through Friday between 7:00 am and 5:30 pm. Rate shall include trip charge, travel
time, mileage, transportation cost, parking and toll fees. Rate shall start upon arrival at
client home or worksite. "Contractor is responsible for securing permit, (when
applicable).
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.45092
Priority Repair Program IntegrityTexas Construction Ltd
Re 10/2014
$83.00\Hourly Rate for Labor Cost
2. Product or Service Type: Emergency Flood Stop Valve Unit-Water Heaters:
$160.00/material cost each +$65.00 installed/labor each =$225.00/each
3. Product or Service Type: Emergency Flood Stop Valve Unit-A/C drain Pan:
$100.00/material cost each +$65.00 installed/labor each =$165.00/each
4. Product or Service Type: Faucet—Kitchen -Single handle kitchen faucet with sprayer,
supply lines and shut off valves. Finish: Chrome:
$90.00/material cost each +$60.00 installed/labor each =$150.00/each
Specify Manufacturer Brand and Series Being Proposed: DELTA/Glacier bay
S. Product or Service Type: Faucet—Kitchen—Dual Control kitchen faucet with sprayer,
supply lines and shut off valves. Finish: Chrome:
$80.00/material cost each +$60.00 installed/labor each = $140.00/each
Specify Manufacturer Brand and Series Being Proposed: DELTA/Glacier bay
6. Product or Service Type: Faucet—Bathroom -Two handle bathroom faucet with pop-
up assembly, drain, supply lines and shut off valves. Finish: Chrome:
$60.00/material cost each +$75.00 installed/labor each =$135.00/each
Specify Manufacturer Brand and Series Being Proposed: DELTA/Glacier bay
7. Product or Service Type: Shower Diverter Faucet Valve Complete—Bathroom -: Install
a dual control valve, metal shower diverter faucet valve. Finish: Chrome:
$125.00/material cost each +$250.00 installed/labor each = $375.00/each
Specify Manufacturer Brand and Series Being Proposed: DELTA/Glacier bay
8. Product or Service Type:TUB Dual Control Faucet Valve Complete—Bathroom-: Install
a metal, dual control, tub fill faucet valve complete. Finish: Chrome:
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.45092
Priority Repair Program IntegrityTexas Construction Ltd
Re 10/2014
$125.00/material cost each +$250.00 installed/labor each =$375.00/ each
Specify Manufacturer Brand and Series Being Proposed: DELTA/Glacier bay
9. GAS LINE—PRESSURE TEST: Cap all gas lines prior to filling the distribution system
with 5-8 lbs. of compressed air. Maintain pressure for at least 30 minutes. Locate and
seal minor any leaks in the system.
$20.00/material each +$230.00 installed/labor each. = $250.00/total cost
10.WATER SUPPLY PEX-1 BATH HOUSE: Remove all water supply from main shut off valve
inside structure. Install PEX type 3/4" fixture grouping trunk/manifold, and 3/8"
individual supply lines to service one 3 piece bath, water heater, kitchen and laundry
area. Follow Manufacture Installation Guide using all PEX fittings, and crimp rings, shall
be complete, code compliant, fully usable, and include shut-off valves, chromed fixture
supply lines and air gaps. Insulate all pipes where applicable to include over the attic
areas.
542.31/material per drop +$189.69 installed/labor per drop = $225.00/total cost
11. WATER SUPPLY PEX-2 BATH HOUSE: Remove all water supply line from main shut off
valve inside structure. Install PEX type 3/4"fixture grouping trunk/manifold, and 3/8"
individual supply lines to service two 3 piece bath, water heater, and kitchen and
laundry area. Follow Manufacture Installation Guide using all PEX fittings, and crimp
rings, shall be complete, code compliant,fully usable, and include shut-off valves,
chromed fixture supply lines and air gaps. Insulate all pipes where applicable to include
over the attic areas.
$42.31/material per drop+$189.69 installed/labor per drop = $225.00/total cost
12.WATER SUPPLY PEX-3 BATH HOUSE: Remove all water supply from main shut off valve
inside structure. Install PEX type 3/4"fixture grouping trunk/manifold, and 3/8"
individual supply lines to service two 3 piece bath, water heater, kitchen and laundry
area. Follow Manufacture Installation Guide using all PEX fittings, and crimp rings, shall
be complete, code compliant,fully usable, and include shut-off valves, chromed fixture
supply lines and air gaps. Insulate all pipes where applicable to include over the attic
areas
$42.31/material per drop +$189.69 installed/labor per drop = $225.00/total cost
I
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.45092
Priority Repair Program IntegrityTexas Construction Ltd
Re 10/2014
ELECTRICAL SERVICES : All Materials shall be UL approved and or National Electrical Code
rated. All drilling,cutting and fastening shall be near and true and shall not critically damage
framing members. All cost must include the removal and disposal of existing units.
13. Carbon Monoxide Alarm: Operated Unit. Alarm must be installed in accordance with
the manufactures recommendation.
$21.00/Materials each +$12 installed/labor each =$33.00/Total
14. Product or Service Type: Specify Labor Rate for Electrical Services: Rate shall include
trip charge, travel time, mileage, transportation cost.The labor rate shall start upon
arrival at client home or worksite. "Contractor is responsible for securing permit (when
applicable).
$83.00/Hourly
Cabinets, Countertops,Sinks and Related Products: All services shall be completed in
accordance to local code requirements. "Contractor is responsible for securing permit (when
applicable).All cost must include the removal and disposal of existing units.
15. Product or Service Type: Bathroom Cabinet/Vanity Base—Single 24": Reinstall existing
countertop and faucet, securely attached to cabinet/vanity. Provide and install new
midline series bathroom cabinet/vanity. All work to be level, plumb, and true. Seal all
holes and openings where pipes, wires and other materials may come through cabinets
with removable material such as "Thumb Gum" to keep out any rodents. Also attach
cabinet to studs in walls. Caulk all seams where countertop meets walls.
$150.00/material each +$210.00 installed/labor each=$360.00/each
16. Product or Service Type: Bathroom Cabinet/Vanity Base—Single 36": Reinstall existing
countertop and faucet, securely attached to cabinet/vanity. Provide and install new
midline series bathroom cabinet/vanity. All work to be level, plumb, and true. Seal all
holes and openings where pipes, wires and other materials may come through cabinets
with removable material such as "Thumb Gum"to keep out any rodents. Also attach
cabinet to studs in walls. Caulk all seams where countertop meets walls.
$250.00/material each +$210.00 installed/labor each =$460.00/each
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.45092
Priority Repair Program IntegrityTexas Construction Ltd
Re 10/2014
17. Product or Service TVpe: Bathroom Cabinet/Vanity Complete—Single 24": Must
include cabinet, sink, faucet, trap, shut-off valves, pop-up drain, caulk, supply lines, etc.:
Install new vanity w/sink complete to local code requirements. All work to be level, plumb,
and true. Seal all holes and openings where pipes, wires and other materials may come
through cabinets with removable material such as "Thumb Gum" to keep out any rodents.
$200.00/material each +$210.00 installed/labor each =$410.00/each
18. Product or Service Type: Bathroom Cabinet/VanitV Complete—Single 36": Must
include cabinet, sink,faucet, trap, shut-off valves, pop-up drain, caulk, supply lines, etc.:
Install new vanity w/sink complete to local code requirements. All work to be level, plumb,
and true. Seal all holes and openings where pipes, wires and other materials may come
through cabinets with removable material such as "Thumb Gum" to keep out any rodents.
$400.00/material each +$210.00 installed/labor each= $610.00/each
19. Product or Service Type: 3 Piece Fiberglass Tub Wall Kit and trim, to include demo of
existing unit and must include new green sheetrock, tub caulking and finish:
$335.00/material each +$415.00 installed/labor each =$750.00/each
20. Product or Service Type: FRP Wall Board Size:4 x 8, Color-White:
$.30/material sq.ft. +$2.10 installed/labor sq.ft. = $3.70/sq.ft.
21. SHEETROCK/DRYWALL%" : Remove old drywall and dispose. Use a 3 coat process, set
tape in bed coat; apply two coats topping compound. Allow drying time; sand-finish
coats smooth to paint ready. Price shall be based on a minimum of 32 sq. ft.
$2.00/Materials Sq. Ft. +$1.33 installed/labor Sq. Ft. = $3.33/Total
22. SHEETROCK/GREEN BOARD-1/2: Remove old drywall and dispose. Apply two coats
topping compound. Allow drying time; sand-finish coats smooth. Price shall be based on
a minimum of 32 sq. ft.
$2.25/Materials Sq. Ft. +$1.50 installed/labor Sq. Ft. =$3.75/Total
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.45092
Priority Repair Program IntegrityTexas Construction Ltd
Re 10/2014
ROOF REPAIRS AND SERVICES:All services shall be completed in accordance to local code
requirements. Contractor is responsible for securing permit.
23. ROOF REPLACMENT 3 Tab Composite Shingles: Tear off one layer and replace roof
complete. All roof work performed for this bid shall be warranted for a period of one
year following payment. This warranty covers problems such as leaks, loose shingles
and correcting, replacing or repairing other damage and/or problems that may result
from the faulty roof work. Standard roof work shall be bid to include installation of new
205 year `three tab', 15#felt paper, code approved venting, new drip edge, new vent
pipe boots, starter shingles for eves and rakes, ridge and gable cap shingles, and code
approved Work includes proper disposal of scrap and waste. Bid shall assume less
than 8/12 pitch roof.
$85.00/Materials SQ+$90.00 installed/labor SQ= $170.00/Total
24. ROOFING TEAR-OFF:Tear off each additional roofing layer(beyond one layer):
$20.00/SQ. Each Labor Cost
25. Product or Service Type: New Decking OSB :Tear off one layer and replace decking
complete. Standard roof work shall be bid to include installation of new decking
materials. Work includes proper disposal of scrap and waste. Roofs greater than 6/12
pitch additional costs will be considered on a case by case basis, costs bid below assume
less than 6/12 pitch:
$20.00/material cost SQ+$40.00 installed/labor cost per SQ= $60.00/SQ
26. Product or Service Type: Remove and dispose of Wood Shingles: Tear off one layer of
wood shingles and dispose properly per SQ.
Labor and disposal fee $20.00/flat fee per SQ
27. Product or Service Type: ROLL Roofing TORCH DOWN 90LB( labor includes removal of
existing and disposal):
$50.00/material cost SQ+ $140.00 installed/labor cost per SQ= $190.00/SQ
28. Product or Service Type: V Tech Modified ROLL Roofing(commercial grade torch
down):
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.45092
Priority Repair Program IntegrityTexas Construction Ltd
Re 10/2014
$50.00/material cost SQ+ $140.00 installed/labor cost per SQ=$190.00/SQ
Product or Service Type: TREE And Shrub Trimming(away from roof shingles: Cost must
include all labor and disposal:
29.Cost for 10 Cubic Yards(10 cubic yards=the size of a Volkswagen Beetle)
$200.00/flat fee
30.Cost for 5 Cubic Yards (5 cubic yards=%the size of a Volkswagen Beetle)
$100.00/flat fee
31. Cost for 2.5 (1/4) Cubic Yards(2.5 cubic yards= %the size of a Volkswagen Beetle)
$50.00/flat fee
Siding and Lumber and Related Services: All services shall be completed in accordance to
local code requirements. Remove damaged siding to the joint over nearest stud. Apply
matching pine siding to walls with galvanized nails. Break all seams over studs and paint wood
"Contractor is responsible for securing permit (when applicable).
32. Siding Pattern 105-109:—Install new siding 1 x 8-12, D-Grade SYP: Remove damaged
siding to the joint over nearest stud. Apply matching pine siding to walls with
galvanized nails. Break all seams over studs and paint wood.
$1.50/material In ft. +$1.50 installed/labor In ft. _ $3.000ost
33.Siding Pattern 105-109: Install new siding 1x 6-12, D-Grade SYP: Remove damaged
siding to the joint over nearest stud. Apply matching pine siding to walls with
galvanized nails. Break all seams over studs and paint wood.
$1.50/material In ft. +$1.50 installed/labor In ft. _ $3.000ost
34.Siding Pattern 117: Install new siding 1 x 8-12, D-Grade SYP: Remove damaged siding
to the joint over nearest stud. Apply matching pine siding to walls with galvanized
nails. Break all seams over studs and paint wood.
$1.50/material In ft. +$1.50 installed/labor In ft. _$3.000ost
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.45092
Priority Repair Program IntegrityTexas Construction Ltd
Re 10/2014
35. Siding Pattern 117: Siding—Install new siding 1 x 6—12, D-Grade SYP: Remove
damaged siding to the joint over nearest stud. Apply matching pine siding to walls
with galvanized nails. Break all seams over studs and paint wood.
$1.50/material In ft. +$1.50 installed/labor In ft. _ $3.000ost
36. Siding Masonite:—Install new Masonite-lap sheet siding: Remove damaged siding to
the joint over nearest stud. Apply matching pine siding to walls with galvanized nails.
Break all seams over studs and paint wood.
$1.00/material In ft. +$2.00 installed/labor In ft. _ $3.00/Cost
37. Product or Service Type: Siding—Install new Masonite-4 x 8 Sheet siding: Remove
damaged siding to the joint over nearest stud. Apply matching pine siding to walls
with galvanized nails. Break all seams over studs and paint wood.
$2.00/material Sq. Ft. +$2.00 installed/labor Sq. Ft. _$4.00/ Sq. Ft.
38. LUMBER-1" X 2": Install a 1"x 2", #2 pine Fascia with bevel cut joints using galvanized
finish nails. Caulk over joints, and prime.
S1.00/material LN Ft. +$1.00 installed/labor LN Ft. _$2.00/total cost
39. LUMBER-1" X 4": Install a 1"x 4", #2 pine Fascia with bevel cut joints using galvanized
finish nails. Caulk over joints, and prime.
$1.00/material LN Ft. +$1.00 installed/labor LN Ft. _$2.00/total cost
40. LUMBER-1" X 6": Install a 1"x 6", #2 pine Fascia with bevel cut joints using galvanized
finish nails. Caulk over joints, and prime.
51.25/material LN Ft. +$1.25 installed/labor LN Ft. _$2.50/total cost
41. LUMBER-1" X 8": Install a 1"x 8", #2 pine Fascia with bevel cut joints using galvanized
finish nails. Caulk over joints, and prime.
$1.50/material LN Ft.+$1.50 installed/labor LN Ft. _$3.00/total cost
42. Product or Service Type: Floor Assembly Bathroom Floor: Remove and reinstall all
fixtures not built-in. Remove floor covering underlayment and expose floor joists.
Replace subflooring and any bad joist to restore floor to sound and level condition.
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.45092
Priority Repair Program IntegrityTexas Construction Ltd
Re 10/2014
Install % underlayment and vinyl sheets good and shoe molding/1/4 round or colonial
molding. Correct all damage to walls and fixtures caused by removing/reinstalling.
$10.00/material Sq. Ft. + $20.00 installed/labor Sq. Ft. =$30.00/cost
43. LABRO RATE FOR CARPENTRY: Services and related work not specified or mention
under the RFP contract: Note: Rate shall include trip charge, travel time, mileage,
transportation cost and parking fees.The labor rate shall start upon arrival at client
home or worksite.
$40.00/Hourly Labor Cost
BID TABS
FIRST CONTRACT AMENDMENT CSC NO.45092
Priority Repair Program IntegrityTexas Construction Ltd
Re 10/2014